Presentation to the MIBOR July 27, 2015 Red Line Phase I

Transcript of Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase...

Page 1: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Presentation to the

MIBOR July 27, 2015

Red Line Phase I

Page 2: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

• People are driving less

• Boomers are becoming seniors; their needs will change

• Seniors are isolated in Central Indiana

• Millennials have very different preferences than prior generations

• Housing and community preferences have changed to favor walkable, transit-served patterns of development

• Central Indiana has grown into one of the most unbalanced transportation regions in the country, with very poor job access

• Poor job access breeds economic stagnation

• Despite significant ridership growth, Central Indiana continually under-invests in transit service

Why are we looking at transit?

Page 3: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

-

20,000

40,000

60,000

80,000

100,000

120,000

140,000

1975 1980 1985 1990 1995 2000 2005 2010 2015 2020 2025 2030 2035

Ind

ian

apo

lis P

op

ula

tio

n T

urn

ing

65

Baby Boomers and the coming Silver Wave

Baby Boomers born 1946 - 1964

US Census Bureau

Page 4: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Aging in Place, Stuck without Options, Transportation for America

Ranking Metropolitan Area Population 65-79 with Poor

Access to Transit in 2015 % of Population 65-79 with

Poor Access to Transit in 2015

49 Kansas City, MO-KS 230,023 88

48 Oklahoma City, OK 136,571 86

47 Ft. Worth-Arlington, TX 199,226 86

46 Nashville, TN 151,995 85

45 Raleigh-Durham, NC 127,931 80

44 Greensboro-Winston-Salem, NC

155,993 79

43 Indianapolis, IN 181,073 79

42 Charlotte-Gastonia-Rock Hill, NC-SC

170,815 79

41 Grand Rapids-Muskegon-Holland, MI

111,882 78

40 Jacksonville, FL 127,958 77

In Indy, aging in place can mean isolation

Page 5: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Economic growth means attracting Millennials

Page 6: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

• 77% prefer living in an urban core • Denser neighborhoods and smaller homes;

emphasize design over size • Diversity, walkability, transit and proximity to jobs

RCLCO National Consumer Survey

Millennials and Boomers attracted to 3rd places

Page 7: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Households have changed, housing hasn’t kept up Today: 6 million Americans live within ½ mile of fixed

transit 2025: 14.6 million Americans will want to live within ½

mile of fixed transit 1950: 78% of households were married couples 43% were married couples with kids Today: 48% of households are married couples 20% are married couples with kids 9 out of 10 new Indy households 2000 to 2010 were singles, unmarried couples, or roommates Single mothers with kids are close to a majority of family households in some communities Neither group really wants the 3,000 sf, 4 bedroom, 3.5 bath suburban house on a half acre lot

Page 8: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

• The New Real Estate Mantra: Location Near Public Transportation

March 2013

The transit shed out-performed the region as a whole by 41.6 percent.

Page 9: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Central Indiana doesn’t buck the trend…

Page 10: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Housing supply and demand are out of balance

Suburban Housing-Only Neighborhood

Suburban Mixed-Use Urban Neighborhood Downtown

25% of regional Consumer Preference 88% of the regional Construction Pipeline

75% of regional Consumer Preference 12% of the regional Construction Pipeline

Page 11: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Poor job access breeds economic stagnation

The Equality of Opportunity Project

Page 12: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

1. New York 2. Los Angeles 3. Chicago 4. Houston 5. Philadelphia 6. Phoenix 7. San Antonio 8. San Diego 9. Dallas 10. San Jose 11. Austin 12. Jacksonville 13. Indianapolis 14. San Francisco 15. Columbus, OH 16. Fort Worth 17. Charlotte 18. Detroit 19. El Paso 20. Memphis

1. MTA (NYC) 2. NJ Transit Corp. 3. Metro (LA) 4. Toronto 5. CTA (Chicago) 6. SEPTA (Philadelphia) 7. CMBC (Vancouver, BC) 8. Metro (Seattle) 9. Montreal 10. Pace (Chicago) 11. WAMTA (D.C.) 12. MBTA (Boston) 13. MTA (Houston) 14. RTA (Denver) 15. MTA Bus Co. (NYC) 16. Valley Met (Phenix) 17. BC Transit (Victoria) 18. OC Transpo (Ottawa) 19. ETS (Edmonton) 20. CT (Calgary) 21. Metro Transit (Minneapolis) 22. Tri-Met (Portland) 23. PAAC (Pittsburgh) 24. OCTA (Orange CA) 25. MDTA (Miami) 26. SF Muni Railway 27. MTA (Baltimore) 28. MTS (San Diego) 29. MARTA (Atlanta) 30. RTCSV (Las Vegas) 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt Lake City) 35. Wts (Winnipeg) 36. Metro (St. Louis) 37. DTC (Wilmington, DE) 38. DTS (Honolulu) 39. CTTRANSIT (Hartford) 40. VIA (San Antonio) 41. GCRTA (Cleveland) 42. GO Transit (Toronto) 43. Cap Met (Austin) 44. MiWay (Mississauga) 45. DDT (Detroit) 46. SCVTA (San Jose) 47. Broward County Transit 48. Reseau (Longueuil, Que) 49. RGRTA (Rochester, NY) 50. CATS (Charlotte) 51. COTA (Columbus, OH) 52. SWORTA (Cincinnati) 53. MCTS (Milwaukee) 54. NFTA (Buffalo) 55. Sun Tran (Tucson) 56. LADOT (LA) 57. Montgomery Co Transit 58. STOC (Gatineau, Qbe) 59. Community Transit (Everett) 60. Foothill Transit (W Covina) 61. Halifax Metro 62. WCDOT (Mt Vernon, NY) 63. NICE (Garden City, NY) 64. TARC (Louisville) 65. SMCTD (San Mateo) 66. LYNX (Orlando) 67. SCT (Yaphank, NY) 68. GDRTA (Dayton) 69. MBA (San Juan) 70. JTA (Jacksonville) 71. FCDOT (Fairfax) 72. Omnitrans (San Bernardino) 73. CDTA (Albany) 74. Hampton Roads (VA) 75. Sound Transit (Seattle) 76. NMTA (Nashville) 77. KCATA (KC MO) 78. STA (Spokane) 79. RIPTA (Providence) 80. CNYRTA (Syracuse) 81. DRT (Whitby, ON) 82. Pierce Transit (Tacoma) 83. IndyGo (Indianapolis) 84. GRTC (Richmond VA) 85. Madison Metro (WI) 86. ABQ Ride (Albuquerque) 87. SRTD (Sacramento) 88. Long Beach Transit 89. HSR (Hamilton, ON) 90. MATA (Memphis) 91. MRTA (Akron) 92. RTA (New Orleans) 93. Golden Gate (San Rafael) 94. HARTA (Tampa) 95. Big Blue Bus (Santa Mon) 96. LTC (London ON) 97. PSTA (Clearwater) 98. MTA (Flint MI) 99. FWTA (Fort Worth) 100.LTD (Eugene)

Largest US Cities 2010 US CENSUS BUREAU

Largest Bus Fleets 2013 METRO MAGAZINE

Indianapolis, IN 829,718 people | 155 buses

Columbus, OH 787,033 people | 306 buses

Page 13: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Peer Comparisons: Investment

Low investment….

Page 14: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Peer Comparisons: Relevance

… and correspondingly low relevance.

Page 15: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

The region has had several transit studies prior to Indy Connect.

Blue Ribbon Commission

Page 16: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 17: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Regional Transportation Plan Multi-Modal (new roads, tolled express lanes, bikes, trails, HOV lanes, local busses, express busses, and both light and commuter rail) Financing Possibilities Governance Structure

Page 18: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 19: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Carmel | Downtown Indy | Greenwood

38th Street | Lawrence

Five Rapid Transit Lines

Downtown | Fishers | Noblesville

Airport | Downtown | Cumberland

Keystone Crosstown | Carmel | Beech Grove

Page 20: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 21: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 22: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Carmel | Downtown Indy | Greenwood

38th Street | Lawrence

Five Rapid Transit Lines

Downtown | Fishers | Noblesville

Airport | Downtown | Cumberland

Keystone Crosstown | Carmel | Beech Grove

Page 23: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Authorizes public referenda for .1 - .25% LOIT

Allows public referenda by county, township opt-in

No regional governance structure

10% of OpEx from “contributions”

25% farebox recovery mandate

No light rail

2014 | SB176

Page 24: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

• Full, updated Indy Connect plan released this Fall

• Re-launch of IndyConnect.org this Fall

• City County Council discussion about ridership-coverage (January to March)

• City County Council & Hamilton County COIT Council referendum certification (January to May)

• Indy Chamber / Hamilton County Statehouse revisions (Jan-March)

• Private sector advocacy – Indy Chamber + Partners

Indy Connect Next Steps

Page 25: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

OUSTIDE OF THE

REFERENDUM

PROCESS,

INDYGO IS

PURSUING THE

RED LINE FIRST

Page 26: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 27: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 28: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 29: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 30: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 31: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 32: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

BRT is FAST ½ Mile Stop Spacing

Page 33: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

First Battery-Electric BRT

• Red Line proposed to be nation’s first battery-electric BRT

• Quiet and Zero Emissions

Page 34: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 35: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Red Line Phase I Map

• Route

• Station Locations

• Phasing

• Entirely within existing ROW

• Dedicated lanes DT to B. Ripple

Page 36: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

College Avenue

Page 37: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Meridian Street

Page 38: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Proposed Configuration

Page 39: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Proposed Configuration

Page 40: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

2- Way Capitol Avenue Option

Page 41: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Proposed Configuration

Page 42: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

Project Timeline

Page 43: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

What do you think?

• Q&A

• Post comments on plan sheets

• Questions?

TOD Strategic Plan Brad Beaubien [email protected] 317-327-5133 Review @ plan2020.com

Red Line Justin Stuehrenberg [email protected] 317-614-9265

Page 44: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

RED LINE TOD STRATEGIC PLAN

DEPARTMENT OF METROPOLITAN DEVELOPMENT

Page 45: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

The TOD STRATEGIC PLAN supports

community development that includes a

mixture of housing, office, retail and city

living amenities integrated into a

walkable neighborhood and located

within a half-mile of quality public

transportation.

Produced by the MPO for most of the

IndyConnect Rapid Transit Network.

Page 46: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

PASSING THE BATON

To support the Fall

2015 Red Line Phase 1

(Broad Ripple to

Uindy), we will adopt

portions of the MPO

Plan that relate to the

final slate of Red Line

stations.

Page 47: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

PASSING THE BATON

To support the Fall 2015 Red

Line Phase 1 (Broad Ripple to

Uindy), we will adopt portions

of the MPO Plan that relate to

the final slate of Red Line

stations.

This is intended to

demonstrate policy

movement on two of the

funding criteria we don’t

score as competitively on.

MOBILITY IMPROVEMENTS

ENVIRONMENTAL BENEFITS

CONGESTION RELIEF

COST EFFECTIVENESS

ECONOMIC DEVELOPMENT

LAND USE

Each of these criteria are weighted

equally, and together comprise 50%

of our score. The remaining half is

related to local funding.

Page 48: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

TOD PLANNING TIMELINE

Page 49: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

FORECASTING DEMAND

Page 50: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

DETERMINING POTENTIAL

Page 51: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

DETERMINING

POTENTIAL

Page 52: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

INVESTMENT FRAMEWORK

STRATEGY

INFILL + ENHANCE • TOD Ready • Focus of Private Sector • Higher Residential + Employment Densities • City Living Amenities • Workforce Housing

CATALYZE + CONNECT • Focus of Public Sector Catalyst Investments • Projects that Add Density and Activity • Connectivity Infrastructure • Placemaking and Public Spaces

PLAN + PARTNER • Focus of Non-Profit and Philanthropic Sector • Station Area Planning and Visioning

TYPOLOGY MATRIX

Page 53: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

STATION AREA DESIGN

Page 54: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

STATION AREA DESIGN

Page 55: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 56: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt
Page 57: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

AFFORDABILITY STRATEGY

• This piece is new and not inherited from the

MPO. It’s under development.

• Collaboration between DMD Planning and CED

Divisions.

• It confirms internal DMD prioritization of

community development investments along

transit corridors.

• It sets the stage for planned 2016 Housing

Strategy Element of Comprehensive Plan.

• It conveys to the Feds a different type of

affordability challenge than what they typically

deal with on the coasts. We’re a soft market that

is very affordable…our challenge is income.

Page 58: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

ENGAGEMENT

• Tag-teaming on IndyGo Stakeholder Meetings

along corridor and with targeted groups.

• Focus is really on the Station Area

Typologies, as that sets up next year’s work.

It’s also the piece that is used by the primary

way we use the comp plan - zoning.

• Educational TOD Exhibit at 8 libraries and

other public locations along corridor.

Page 59: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

DRAFTS ONLINE

PLAN2020.COM

plan2020.com/plans/lu/tod

Page 60: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

RED LINE TOD STRATEGIC PLAN

DEPARTMENT OF METROPOLITAN DEVELOPMENT

Page 61: Presentation to the MIBOR · 2016-06-07 · Presentation to the MIBOR July 27, 2015 Red Line Phase I ... 31. DART (Dallas) 32. SMART (Detroit) 33. AC Transit (Oakland) 34. UTA (Salt

MIBOR TRANSIT

INFO/UPDATES:

http://www.mibor.com/membershipinfo/transit/