Presentation to Solarize Norwich 12 Feb 2014 -
Transcript of Presentation to Solarize Norwich 12 Feb 2014 -
Norwich Technologies • Founded by Norwich, VT residents in 2011. Office
and workshop in White River Junction, VT.
Site Preparation Team:
We work with licensed local contractors for electrical, roof, crane, and excavation work •Hance, Osterlund, & BriteLite Electric •Mak, Clifford Excavation •HP Roofing, Lesley Bracker •Adams, Hutch Crane
2 12 Feb 2014
3
• Solar module price has dropped 5x in 5 years to under $1 / Watt
• Balance of system costs now dominate. Our system reduces and firms this cost.
• Assured Quality and installation time through process optimization
Solar Module
Inverter
Hardware Other costs
Residential Installed Cost/Watt
12 Feb 2014
EZ = easily installed (and uninstalled, if ever necessary) • Modular drop-in PV system
• Workshop assembled – hardware and wiring
PV = PhotoVoltaic aka solar electric (photo = light, voltaic = electricity)
4
• “EZ-PV” system moves much of the “on-roof” work to the workshop. Actual onsite installation takes much less time. The result is lower cost while ensuring quality control.
12 Feb 2014
1. Panels & Subassemblies
ordered
2. EZ-PV Base frame wired
3. Panels attached and wired.
Assembly tested.
4. Additional assemblies (e.g.
interconnect) completed and tested.
5. Site prep work completed
6. EZ-PV shipped to site
7. Mechanized install of EZ-PV
8. Final wiring and commission completed
12 Feb 2014
EZ-PV system
Leading-brand solar panels with 25-year power warranty (e.g. Canadian Solar, Renesola) Leading-brand micro-inverter with 25-year warranty (Enphase) [Option for string inverter]
Mounted on aluminum frame (designed & made in VT) Grid-connected including disconnect & meterbox Online monitoring to track performance of your EZ-PV System
8 12 Feb 2014
Standing seam – industry standard S-5 Clips require no roof penetration Asphalt shingle – industry standard QuickMount PV flashing
9
Metal corrugated – industry standard S-5 Versabrack-47 uses same fasteners that attach roof Membrane roof– industry standard Olyfast Power Grip mount uses same roof membrane material heat welded
12 Feb 2014
A roof (house, barn, etc.) or field with sufficient uninterrupted space to hold the PV modules
Roof can be oriented in directions from due East, through South, to due West (“true” rather than magnetic orientation)
No or limited shade from trees or other obstructions—enough clear view to receive average of 6+ hours sunlight per day
If this is, or might be, your home, give us a call!
12 Feb 2014
“But costs may keep falling. Why shouldn’t I wait a few years?”
Vermont incentive not reliable… Federal tax credit expires 2016… Solarize Norwich incentives Every year you wait is another year you buy electricity
while generating none… Given air pollution, energy security, & climate change
concerns, whether choosing EZ-PV or Solaflect or any other source, if you have the means and the location, you should act.
12 Feb 2014