Presentation to: Seminar on Progress of Rural Water Programme 2006 Shamrock Lodge Hotel Athlone

106
Individual County Reports to EU Commission on measures to achieve compliance with the Drinking Water Directive Presentation to: Seminar on Progress of Rural Water Programme 2006 Shamrock Lodge Hotel Athlone 8 h June 2006

description

Individual County Reports to EU Commission on measures to achieve compliance with the Drinking Water Directive. Presentation to: Seminar on Progress of Rural Water Programme 2006 Shamrock Lodge Hotel Athlone 8 h June 2006. COUNTY REPORTS. Sources & Ownership Taken over by Local Authority - PowerPoint PPT Presentation

Transcript of Presentation to: Seminar on Progress of Rural Water Programme 2006 Shamrock Lodge Hotel Athlone

  • Individual County Reports to EU Commissionon measures to achieve compliance with the Drinking Water DirectivePresentation to: Seminar on Progress of Rural Water Programme 2006Shamrock Lodge Hotel Athlone8h June 2006

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY REPORTSSources & OwnershipTaken over by Local AuthorityMetered supply from public schemePrivate sourceMicrobiological Compliance of SchemesTreatment Solutions Identified by L.A.Realisation of Identified Treatment Solutions

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CARLOW REPORTSources & Ownership

    Chart2

    5

    1

    5

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    County CarlowUpgrade Solutions Identified (All Schemes)

    Disinfection/ Sterilisation9%

    Connect to PWS9%

    Private Source Only

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    45

    72

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    No64% (7)

    Yes36% (4)

    513

    38

    8

    295

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38DC)

    Disinfection/ Sterilisation1% (8 DC)

    Public Source35% (295 DC)

    DBO Treatment60% (513 DC)

    265

    46

    543

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    226

    628

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    2

    1

    6

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    4

    5

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    226

    617

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    510

    38

    295

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    5

    1

    3

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    265

    38

    540

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CARLOW REPORTMicrobiological Results in Compliance

    Chart3

    45

    72

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    No64% (7)

    Yes36% (4)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    County CarlowUpgrade Solutions Identified (All Schemes)

    Disinfection/ Sterilisation9%

    Connect to PWS9%

    Private Source Only

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38DC)

    Disinfection/ Sterilisation1% (8 DC)

    Public Source35% (295 DC)

    DBO Treatment60% (513 DC)

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    4

    5

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    Chart4

    226

    628

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    0

    0

    0

    0

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    Disinfection/ Sterilisation9%

    Connect to PWS9%

    Private Source Only

    00

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    00

    00

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    0

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38DC)

    Disinfection/ Sterilisation1% (8 DC)

    Public Source35% (295 DC)

    DBO Treatment60% (513 DC)

    0

    0

    0

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    0

    0

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    0

    0

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    0

    0

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    0

    0

    0

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    0

    0

    0

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    0

    0

    0

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    0

    0

    0

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    00

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    00

    00

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CARLOW REPORTUpgrade Solutions Identified

    Chart5

    3

    1

    1

    6

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    DBO Treatment27% (3)

    Connect to PWS9% (1)

    Disinfection/ Sterilisation9% (1)

    Public Source55% (6)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    Public Source55% (6)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment27% (3)

    Private Source Only

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38DC)

    Disinfection/ Sterilisation1% (8 DC)

    Public Source35% (295 DC)

    DBO Treatment60% (513 DC)

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    Chart6

    513

    38

    8

    295

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    DBO Treatment60% (513)

    Public Source35% (295)

    Disinfection/ Sterilisation1% (8)

    Connect to Public Supply4% (38)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    Public Source55% (6)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment27% (3)

    Private Source Only

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38)

    Disinfection/ Sterilisation1% (8)

    Public Source35% (295)

    DBO Treatment60% (513)

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CARLOW REPORTStatus of Identified Solutions

    Chart7

    55

    22

    44

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Underway36% (4)

    Complete46% (5)

    Planning 18% (2)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    Public Source55% (6)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment27% (3)

    Private Source Only

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38)

    Disinfection/ Sterilisation1% (8)

    Public Source35% (295)

    DBO Treatment60% (513)

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    Chart8

    265

    46

    543

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Complete31% (265)

    Planning 5% (46)

    Underway64% (543)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallyloo27380217026930CW207NoPublicPublicYesYes6Complete27-Jun-05Taken into NRWSSYes

    CarlowGrangeford/Slaneyquarter28082617517978CW215NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowKillerig/Straboe28161117760788CW219NoPublicPublicYesYes6Complete26-Jun-05Taken into NRWSSYes

    CarlowTankardstown28832917587130NoPublicPublicYesYes6Complete25-Jun-05Taken into NRWSSYes

    CarlowNewstown28865916941039CW112NoPublicPublicNoYes6Complete1-Aug-05Taken into Tullow WSSYes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowNurney26968716565830CW221NoPublicPrivateNoYes6Underway1-Aug-06To be taken in charge by local authorityYes

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    Type of SupplyNo. of Schemes

    PWS5

    Public GWS1

    Private GWS5

    Upgrade SolutionCurrent StatusResults in ComplianceResults in Compliance (Annex 14)

    DBO Treatment3Complete5Yes4Yes4

    Connect to Public Supply1Planning2No7No5

    Disinfection/ Sterilisation1Underway4

    Public Source611

    11

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)Results in Compliance (Annex 14: Domestic Connections)

    DBO Treatment513Complete265Yes226Yes226

    Connect to Public Supply38Planning46No628No617

    Disinfection/ Sterilisation8Underway543843

    Public Source295854

    854

    Upgrade Solution (Annex 14)

    DBO Treatment2

    Connect to Public Supply1

    Public Source6

    Current Status (Annex 14)

    9Complete5

    Planning1

    Underway3

    9

    Upgrade Solution (Annex 14: Domestic Connections)

    DBO Treatment510Current Status (Annex 14:Domestic Connections)

    Connect to Public Supply38Complete265

    Public Source295Planning38

    843Underway540

    843

    Total

    0

    0

    0

    0

    County CarlowUpgrade Solutions Identified (All Schemes:11)

    Public Source55% (6)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment27% (3)

    Private Source Only

    00

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (All 11 Schemes)

    Planning 18% (2)

    Complete46% (5)

    Underway36% (4)

    Sheet3

    00

    00

    Results in Compliance

    Current Status

    County CarlowMicrobiological Results in Compliance (All Schemes: 11)

    Yes36% (4)

    No64% (7)

    0

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Domestic Connections = 854)

    Connect to Public Supply4% (38)

    Disinfection/ Sterilisation1% (8)

    Public Source35% (295)

    DBO Treatment60% (513)

    0

    0

    0

    County CarlowCurrent Project Status (All Schemes: Domestic Connections = 854)

    Underway64% (543)

    Planning 5% (46)

    Complete31% (265)

    0

    0

    County CarlowMicrobiological Results in Compliance (All Schemes: Domestic Connections = 854)

    No74% (628)

    Yes26% (226)

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 9)

    DBO Treatment22% (2)

    Connect to Public Supply11% (1)

    Public Source67% (6)

    0

    0

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: 9)

    No56% (5)

    Yes44% (4)

    0

    0

    County CarlowMicrobiological Results in Compliance (Annex 14 Schemes: Domestic Connections = 843)

    Yes27% (226)

    No73% (617)

    0

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: Domestic Connections = 843)

    Public Source35% (295)

    Connect to Public Supply5% (38)

    DBO Treatment60% (510)

    0

    0

    0

    County CarlowCurrent Project Status (Annex 14 Schemes: 9)

    Planning 13% (1)

    Underway25% (3)

    Complete62% (5)

    0

    0

    0

    County CarlowCurrent Project Status (Annex 14: Domestic Connections = 843)

    Complete31% (265)

    Planning 5% (38)

    Underway64% (540)

    0

    0

    0

    No of Schemes

    County CarlowSources and Ownership (11 Schemes)

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CarlowBallinabrannagh268560171083249CW102YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowGlynn St Mullins276913139982261CW104YesPrivatePrivateNoYes1Underway1-Aug-07Yes

    CarlowBallyellen26926815422338CW105YesPrivatePrivateNoYes3planning31-Dec-07Yes

    CarlowTomard2678171678033CW125NoPrivatePrivateNoYes1UnderwayLess than 15 Houses, now part of Ballinabrannagh GWS, which is in DBO projectNo

    CarlowBallyloughan2751481591878CW109YesPrivatePrivateNoYes5Planning12/31/06One commercial activityNo

    Upgrade SolutionCurrent StatusResults in Compliance

    DBO Treatment3Yes0SAME FOR ANNEX 14 SCHEMES - 100% NON COMPLIANCE

    Connect to Public Supply1Planning2No5

    Disinfection/ Sterilisation1Underway3

    55

    Upgrade Solution (Annex 14 Schemes)Current Status (Annex 14)

    DBO Treatment2

    Connect to Public Supply1Planning1

    3Underway2

    3

    0

    0

    0

    County CarlowUpgrade Solutions Identified (All Schemes: 5 Private Sources)

    Disinfection/ Sterilisation9% (1)

    Connect to PWS9% (1)

    DBO Treatment60% (3)

    00

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (All Schemes: 5 Private Sources)

    Planning 40% (2)

    Underway60% (3)

    00

    00

    Results in Compliance

    Current Status

    County CarlowBacterialogical Results in Compliance (Private Source Only)

    0

    0

    County CarlowUpgrade Solutions Identified (Annex 14 Schemes: 3 Private Sources)

    Connect to Public Supply33% (1)

    DBO Treatment67% (2)

    00

    00

    Current Status

    Current Status

    County CarlowCurrent Project Status (Annex 14: 3 Private Sources)

    Planning 33% (1)

    Underway67% (2)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CAVAN REPORTSources & Ownership

    Chart1

    28

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    151

    13Underway

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    12

    16

    County CavanBacterialogical Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    D.C. = Domestic Connections

    County CavanBacterialogical Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    3413

    5747

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5747)

    Complete37% (3413)

    12

    13

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    05

    04

    Current Status

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    0

    0

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CAVAN REPORTMicrobiological Results in Compliance

    Chart2

    12

    16

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    No57% (16)

    Yes43% (12)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    1

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    D.C. = Domestic Connections

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5747)

    Complete37% (3413)

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    05

    04

    Current Status

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    0

    0

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    Chart3

    3276

    5884

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    Yes36% (3,276)

    No64% (5,884)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    01

    0

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    0

    0

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    0

    0

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    0

    0

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5747)

    Complete37% (3413)

    0

    0

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    0

    0

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    05

    04

    Current Status

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    0

    0

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    0

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CAVAN REPORTUpgrade Solutions Identified (Schemes/Domestic Connections)

    Chart5

    28

    County CavanUpgrade Solutions Identified (All Schemes:28)(9,160 Domestic Connections)

    DBO Treatment100% (28)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10Upgrade Solution

    DBO Treatment28

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    01

    0

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    0

    0

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    0

    0

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    0

    0

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5747)

    Complete37% (3413)

    0

    0

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    0

    0

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    01

    0

    #REF!

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    0

    0

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    0

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    0

    County CavanUpgrade Solutions Identified (All Schemes:28)(9,160 Domestic Connections)

    DBO Treatment100% (28)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CAVAN REPORTStatus of Identified Solutions

    Chart6

    151

    13Underway

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Complete54% (15)

    Underway46% (13)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10Upgrade Solution

    DBO Treatment28

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    1

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5747)

    Complete37% (3413)

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    1

    #REF!

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    County CavanUpgrade Solutions Identified (All Schemes:28)(9,160 Domestic Connections)

    DBO Treatment100% (28)

    Chart7

    3413

    5747

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Complete37% (3,413)

    Underway63% (5,747)

    Sheet1

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    CavanBallymagovern222020316374830200PR12003CN101YesPrivatePrivateNoYes1Completed10/1/05Network currently being upgraded and lines scoured.GWS partaking in a Network Management Programme.Yes

    CavanCorlough2134293219523380200PR12009CN110YesPrivatePrivateNoYes1Completed3/20/06Yes

    CavanGlangevlin2102463282511000200PR12018CN116YesPrivatePrivateNoYes1Completed10/1/05Yes

    CavanKnockbride2662913002984500200PR12016CN120NoPrivatePrivateNoYes1Completed2/1/06Amalgamed with the Vale GWS to form Drumkeery GWSYes

    CavanSralaghan213429321952CN124NoPrivatePrivateNoYes1Completed3/20/06Amalgamated to become part of Corlough GWS (Domestic Connections included in Corlough GWS)Yes

    CavanThe Vale2662913002984500200PR12016CN125NoPrivatePrivateNoYes1Completed2/1/06Amalgamated with Knockbride GWS to form Drumkeery GWSYes

    CavanBarraghy2639003140304340200PR12004CN102YesPrivatePrivateYesYes1Completed9/30/02Yes

    CavanBunnoe2513803151901550200PR12007CN105YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanButlersbridge2398013127616670200PR12001CN106NoPrivatePrivateYesYes1Completed8/1/03Butlersbridge amalgamated with Redhills GWS to form Annagh GWSYes

    CavanCorran22202031637432CN111YesPrivatePrivateYesYes1Completed10/1/05Being supplied from Ballymagovern GWS. Schemes propose to amalgamate.Yes

    CavanDoobally199136332706770200PR12015CN114YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanKildallan2232273115562600200PR12020CN118YesPrivatePrivateYesYes1Completed10/1/05Yes

    CavanKill2583303104901000200PR12021CN119YesPrivatePrivateYesYes1Completed12/1/05Yes

    CavanMilltown2344903126472670200PR12023CN122YesPrivatePrivateYesYes1Completed9/1/05Yes

    CavanRedhills2398013127610200PR12001CN123NoPrivatePrivateYesYes1Completed8/1/03Amalgamated with Bultersbridge GWS to form Annagh GWSYes

    CavanBrusky-Killydoon23820029042016000200PR12017CN104NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Garty Lough GWS to form Erne Valley GWSYes

    CavanBillis-Lavey2536502967805000200PR12005CN103YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanCrossdoney2392203041402670200PR12011CN108YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanDhuish2719203018702400200PR12014CN113YesPrivatePrivateNoYes1Underway6/1/06Yes

    CavanGarty Lough2315002999800200PR12017CN115NoPrivatePrivateNoYes1Underway5/1/06Scheme amalgamated with Bruskey/Killydoon GWS to form Erne Valley GWSYes

    CavanGowlan Blacklion2075603333601770200PR12019CN117YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanLavagh-Ballyheelan2395062825042780200PR12000264CN121YesPrivatePrivateNoYes1Underway4/1/06Yes

    CavanClifferna2568802995504000200PR12008CN107YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanCrosserlough2461802945406670200PR12012CN109YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanDernakesh2642103095002170200PR12013CN112YesPrivatePrivateYesYes1Underway4/1/06Yes

    CavanTonyduff-Seeoran2624813010604670200PR12024CN126NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTullyunshin2572803003594670200PR12024CN127NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    CavanTurfad2585543022384670200PR12024CN128NoPrivatePrivateNoYes1Underway6/1/06Amalgamated to form Mountain Lodge GWSNo

    Type of SupplyNo. of Schemes

    Current StatusResults in ComplianceResults in Compliance (Nr of domestic connections)Private GWS28

    Complete15Yes12Yes3276

    Underway13No16No5884

    9160

    Current Status (Domestic)Results in Compliance (Annex 14)Results in Compliance (Annex 14: Nr of domestic connections)

    Complete3413Yes12Yes3276

    Underway5747No13No4483

    Current Status (Annex 14)

    Complete15

    Underway10Upgrade Solution

    DBO Treatment28

    Current Status (Annex 14:Domestic)

    Complete3413

    Underway4346

    Sheet1

    1

    #REF!

    #REF!

    County CavanCurrent Project Status (All Schemes:28)

    Underway46% (13)

    Complete54% (15)

    Sheet2

    County CavanMicrobiological Results in Compliance (All Schemes:28)

    Yes43% (12)

    No57% (16)

    Sheet3

    County CavanMicrobiological Results in Compliance (All Schemes: 9,160 Domestic Connections)

    No64% (5884)

    Yes36% (3276)

    County CavanCurrent Project Status (All Schemes: 9,160 Domestic Connections)

    Underway63% (5,747)

    Complete37% (3,413)

    County CavanMicrobiological Results in Compliance (Annex 14 Schemes:25)

    No52% (13)

    Yes48% (12)

    County CavanMicrobiological Results in Compliance (Annex 14: 7,759 Domestic Connections)

    No58% (4,483)

    Yes42% (3,276)

    1

    #REF!

    County CavanCurrent Project Status (Annex 14 Schemes: 25)

    Underway40% (10)

    Complete60% (15)

    County CavanCurrent Project Status (Annex 14: 7,759 Domestic Connections)

    Underway56% (4,346)

    Complete44% (3,413)

    No of Schemes

    County CavanSources and Ownership (28 Schemes)

    County CavanUpgrade Solutions Identified (All Schemes:28)(9,160 Domestic Connections)

    DBO Treatment100% (28)

    GALWAY DBO STEERING GROUP 21rd February 2006Presentation to Seminar on Progress of Rural Water Programme 20068th June 2006Sherwood HouseSherwood AveTaylors HillGalway

    COUNTY CLARE REPORTSources & Ownership

    Chart1

    1

    12

    No of Schemes

    County ClareSources and Ownershi (13 Schemes)

    Total

    CountyScheme NameX CoordinateY CoordinateDomestic ConnectionsNew Drinking Water Directive (DWD) CodePrevious Monitoring Code (Nov 02 - Jan 05)Scheme still in existence (Y/N)Source (Public/ Private)Current Ownership (Private/ Integrated into PWS)Results in Compliance (Bacterial) Y/NUpgrade Solution Identified (Y/N)Upgrade Solution*Current Status **Project Completion DateCommentsECJ (Y/N)

    ClareRanaghan13540019120038CE109YesPrivatePrivateNoYes1PlanningPart of North Clare (Eastern Area) Water Supply Scheme. Recommended for inclusion in Galway DBO Bundle No. 2.Yes

    ClareTubber14065019455045NoneYesPrivatePrivateNoYes1PlanningBored well source located in Co. Galway.Part of North Clare (Eastern Area) Water Supply Scheme. Recommended for inclusion in Galway DBO Bundle No. 2Yes

    ClareKillone132300173200193CE102YesPrivatePrivateNoYes1Underway8/15/06Yes

    ClareToonagh / Dysart130600182600328CE106YesPrivatePrivateNoYes1Underway6/30/06Yes

    ClareKilnaboy126900191700140CE104YesPrivatePrivateNoYes3PlanningPart of North Clare (Eastern Area) Water Supply Scheme. Awaiting Department Approval since May 2004.Yes

    ClareFanore113900208150175CE107YesPrivatePrivateNoYes3Underway11/30/06Yes

    ClareCarrowcore16925018115020CE110YesPrivatePrivateNoYes5PlanningBored Well Source.Identified as Part of Second Bundle of Schemes for DBO Project in Co. Clare.yes

    ClareRaheen16550018225030CE111YesPrivatePrivateNoYes5PlanningBored Well Source.Identified as Part of Second Bundle of Schemes for DBO Project in Co. Clare.yes

    ClareBallagh/Cahersherkin117500190400170CE103YesPublicPrivateYesYes6Completed2004Connected to Public Mains in 2004.Currently proceeding through Take-Over phase with Clare County Council.Yes

    ClareKiltackey13590019965017YesPrivatePrivateNoYes1PlanningBored Well Source.Part of North Clare (Eastern Area) Water Supply Scheme. Recommended for inclusion in Galway DBO Bundle No. 2No

    ClareLissycasey121800166500772CE105YesPrivatePrivateNoYes1Underway6/30/06No

    ClareKilmaley/Inagh1253001747001555CE101YesPrivatePrivateYesYes1Underway6/30/06No

    ClareBodyke15980018160033CE108YesPrivatePrivateNoYes5PlanningBored Well Source.Identified as Part of Second Bundle of Schemes for DBO Project in Co. Clare.No

    Type of SupplyNo. of SchemesUpgrade SolutionUpgrade Solution (Domestic Connections)Current StatusResults in Compliance

    PWS0DBO Treatment7DBO Treatment2948Complete1Yes2

    Public GWS1Connect to Public Supply2Connect to Public Supply315Planning7No11

    Private GWS12Disinfection/ Sterilisation3Disinfection/ Sterilisation83Underway5

    Public Source1Public Source170

    Upgrade Solution (Domestic Connections)Current Status (Domestic Connections)Results in Compliance (Domestic Connections)

    DBO Treatment2948Complete170Yes1725

    Connect to Public Supply315Planning323No1791

    Disinfection/ Sterilisation83Underway30233516

    Public Source170

    Upgrade Solution (Annex 14)Current Status (Annex 14)Results in Compliance(annex 14)

    DBO Treatment4Complet