PRESENTATION
STFA CONSTRUCTION GROUP
GENERAL
STFA Group
Since 1938 (76 years)
Turnover $1bn+ (2013)
7,000 employees
24 countries
STFA Group
STFA Group Activities
STFA Construction Group
ENR’s TOP 250 International
Contractors
Total Experience *$25bn
Domestic
* 2010 Const. Price
International
1972 LIBYA
1978 SAUDI ARABIA
1981 EGYPT
1983 IRAN
1984 TUNISIA
1992 PAKISTAN
2000 OMAN
2000 QATAR
2001 INDIA
First Turkish Contractor in 9 countries
Marine, Ports & Harbours
32 km Breakwater
70 km Quaywall
33 km Water Intake & Outfall
Tunnels
100 km Tunnel
Roads & Bridges
700 km Roads
85 km Bridges
Oil, Gas & Power
Turkey’s 1st LNG Terminal
Engineering & PM
ECAP Engineering & Consultancy
Foundations
AL Habtoor- STFA Soil Group LLC
STFA Construction Group
Field of Construction - Highlights
Major Clients & Partners
Jan De Nul NV
Pakistan Naval Force
Karachi Port Trust
Water & Power Development Authority (Pakistan)
National Highway Authority (Pakistan)
KOC (Kuwait Oil Company)
General Directorate of State Hydraulic Works (Turkey)
General Directorate of Highways (Turkey)
12 Major Government Client (Libya)
Qatar Petroleum
Qatar Gas
Ras Gas
Fluor
Ministry of Transport and Communication (Oman)
DP World
Saudi Aramco (S. Arabia)
QRail
Tüpraş
Major Clients & Partners
Alwan (Saudi Arabia)
Polat (Turkey)
RIO (Saudi Arabia)
Jeddah Municipality (S. Arabia)
Ministry of Public Works andHousing (S. Arabia)
Council for Reconstruction and Development (CDR), Lebanon
CCC (Grace )
IGL (Italy)
IHI (Japan)
MHI (Japan)
NKK (Japan)
TECHNIGAZ (France)
LURGI BAMAG (Germany)
THYSSEN (Germany)
AFENCO (Libya)
COSSIDER (Algeria)
Major Engineers & Consultants
COWI (Denmark)
Royal Haskoning (England)
Louis Berger Group ( USA )
High Point Rendel ( Britain)
SECO ( Saudi Arabia)
Delta Marine Consultant (Netherlands)
Halcrow ( UK)
AECOM (USA)
DAR Cons. (USA)
Scott Wilson Kirkpatrick (UK)
Lahmayer Company (Germany)
Brown and Root (Overseas) Limited (USA)
Tractabel (Belgium)
Renardet S.A & Partners Consulting Engineers LLC. (Oman)
Al-Nahda Cons.Eng. (Oman)
Ibn Khaldun Consulting Eng. (Oman)
National Consulting Bureau (Kuwait)
Bechtel (USA)
Fitchner & Partners (Germany)
Rafik El Khoury & Partners (Lebanon)
Major Engineers & Consultants
Technopromexport – USSR (UK)
Stone & Webster (USA)
Arup (UK)
UBM (Turkey)
Enet (Turkey)
Botek
SOWP&LGM (UK)
Mott Hay & Anderson Int. Ltd. (UK)
PENCOL Engineering Consultants (UK)
Republic Engineering Corp. Ltd. (Pakistan)
Taylor Binnie and Partners(UK)
Pasific Consultants International
Quality, Health, Safety & Environment
Block Lifting and Installation Operation in LNG Loading Berth, Ras Laffan - QATAR
Quality, Health, Safety & Environment
Our HSE Practices are recognized
by leading International Clients and EPC
Contractors;
10 Mil. Man-Hours without LTI
4 Mil. Man-Hours without LTI
5 Mil. Man-Hours without LTI
TOTAL COMMITMENT TO HSE ZERO Lost Time Accident
ZERO Occupational Illness
ZERO Major Environmental Accident
Projects in Progress
Date: 2014
Client: Qatar Railway Company
Contract Value: 4.4 Billion USD
The project covers the;
• Gold Line will start from the New Doha Airport and cross
the city east to west.
• For the project, 32 km of tunnels will be dug with a
diameter of 7.15 meters.
• 128.000 items of tunnel segment will be used along the
Line.
• Six tunnel boring machines (Mole / TBM) will be used
simultaneously in the construction of the tunnels.
• Thirteen underground stations will be built with the
highest standard of architecture, and will be completely
equipped with the latest advances of electromechanical
technology.
• 2.5 million m3 of excavation will be done just for the
construction of the stations.
• A total of 1 million m3 of concrete with a service life of
120 years will be used in the project.
QATAR INTEGRATED RAILWAY PROJECT
DESIGN & BUILD PACKAGE 3
GOLDEN LINE UNDERGROUND
Railway / Tunnel Works Qatar
In Progress
Railway / Tunnel Works Qatar
Railway / Tunnel Works Qatar
Date: 2014 -
Client: Ministry of Regional Municipalities
and Water Resources, Oman
Contract Value: 20 M USD
The project covers the;
HDPE and UPVC sewer pipelines of 65 km in length and
200 to 500 mm in diameter and construction of one pumping
plant and water supply station, as well as design and
construction of one wastewater treatment plant (oxidation-
type treatment plant)
CONSTRUCTION OF SEWAGE
TREATMENT PLANT AT WILAYAT
MUSANNAH
Infrastructure Works Oman
In Progress
Date: 2014 -
Client: Ministry of Transport and
Communications, Oman
Contract Value: 109 M USD
The project covers the;
11,93 km project are 0,9 M m2 slope stabilization, 3,2 M m3
rock fill and 1,5 M m3 shore protection fill, as well as the
construction of one bridge and six culverts.
IMPROVEMENT OF EXISTING KHASAB TO
TIBAT COASTAL ROAD
Road, Bridge & Viaduct Oman
In Progress
Date: 2014 -
Client: Ministry of Fisheries Wealth Directorate,
Oman
Contract Value: 33 m USD
The project covers the;
• Construction of 150 m long Quay Line;
• Construction of 1600 m breakwater;
• Dredging of harbour basin to (-) 3.5 m CD maximum
• Dredging of approach channel to (-) 5.0 m maximum
• Reclamation works, roads and pavements
• Provision of 1 no. Berthing Pontoon, 1 no. Landing Pontoon &
Approach bridge
MUSANNAH FISHERY HARBOUR
Ports and Harbours Oman
In Progress
Date : 2012-
Client : Kuwait Oil Company (KOC)
Contract Value: $490 m
Duration : 38 months
The project covers marine works (dredging,
breakwaters, quaywalls, pontoons, ship lift system),
buildings, electrical works, mechanical works, ICT
systems (marine and building management
systems, telecommunication systems).
SMALL BOAT HARBOURS
Ports and Harbours Kuwait
in progress
Ports and Harbours Kuwait
in progress
Date : 2013-
Client : Ministry of Equipment and Transport,
Directorate of Ports and Public Maritime Domain
Contract Value : $362 m
Duration : 48 months + mobilisation
The project, which will take place in the city of Safi, in the south-
western part of Morocco some 250 km from Casablanca, will involve
the building of a jetty 3 km long and 18 metres high at its deepest
point, as well as that of piers totalling 390 metres.
SAFI PORT PROJECT
Ports and Harbours Morocco
in progress
Ports and Harbours Morocco
in progress
Date: 2013-
Client: Qatar Petroleum
Contract Value: $20 m
Repair works will be executed in Mesaieed Port at QASCO Berth 1-
2-3, QATEX Berth 4, Refinery Berth 6, Small Boat Harbour, General
Cargo Berth 9-10, QAPCO Berth 18-19, QAFCO Jetty-1 and NGL
Jetty and Dolphins.
The project covers ;
• Structural strengthening of 66 tubular steel piles by welding steel
jackets to cover the most corroded areas,
• Replacement of ca. 20T of structural steel elements
• Repair of ca. 8,000m2 of cope beam,
• Repair of ca. 10.000m2 of deck slab,
• Application of protective coating to concrete deck slab
• Application of protective coating to structural steel elements
• Replacement of quay furniture (ladders, bollards, fenders)
• Concrete crack repair by epoxy resin injection
• Inspection of service trench and replacement of covers and gullies
REPAIR OF WHARVES AND JETTIES
AT MESAIEED PORT PROJECT
Ports and Harbours Qatar
in progress
Date: 2012-
Client: Ministry of Municipality & Tourism,
General Directorate of Water and
Sewerage Organization Department,
Kurdistan Region in Iraq
Contract Value: $163m
The project scope covers the construction ofErbil Water
Treatment Plant, Erbil Distribution Network and Duhok
Distribution Network.
ERBIL WATER SUPPLY
IMPROVEMENT SYSTEM & DUHOK
DISTRIBUTION NETWORK PROJECT
Infrastructure Works Iraq
in progress
Infrastructure Works Iraq
in progress
Date: 2012-
Client: Saudi Aramco
Contract Value: $35 m
The project covers the;
• 850 Meter long, 3 Meter wide rubble breakwater with culverts &
lighting
• 202 Meter long extension to existing concrete pier
• Floating Docks, Mooring Piles & Gangways to accommodate
351 Large boats & 192 small boats
• Buildings,
• New Musalla and Fresh Water Well, storage/pumping
• Utilities
• New Fuel storage and distribution pumps & 3 Jib Cranes
• Two Slipways for large & small boats
• Existing Causeway Upgrades – includes Culverts & Asphalting
DAREEN PORT PROJECT
Ports and Harbours Saudi Arabia
in progress
Ports and Harbours Saudi Arabia
in progress
Date: 2013-
Client: Ministry of Agriculture and
Fisheries
Contract Value: $38 m
The project covers the breakwater, dredging and
filling works, pontoon design and construction works
TAQAH FISHERY HARBOUR
PROJECT
Ports and Harbours Oman
in progress
Road, Bridge & Viaduct Oman
in progress
DUALIZATION OF BID BID SUR SECTION
1 PACKAGE 1B
Date:2011-
Client: Ministry of Transport and Communications,
Directorate General of Roads & Land Transport,
Authority
Contract Value: $300 m
The contract includes construction of 75 km 2 x 2 highway, 9
crossings with bridges, 1 underpass, 4 overpass, 50 km 1 x 1 service
road and the lighting works for the whole route. Bridge structures
involve precast deck beams, numerous multi-cell culverts, 50 kms of
service roads.
The term of the contract is 36 months.
Road, Bridge & Viaduct Oman
projects in progress
Date: 2011-
Client: IHI INFRASTRUCTURE SYSTEMS CO.LTD
Contract Value: $256 m
The project covers;
2x55000 t Caissons as Tower Foundations to be
placed to a depth of -40m on seabed including dredging,
driving of 408 no’s of Inclusion Piles and Bedding works,.
Construction of Dry Dock and Wet Dock for Caisson
Production.
Diaphragm Wall Construction at South Anchorage Area,
Anchorage Structures positioned on both side of the
Bridge
Approach Bridges Piers and Side Spans Piers for both
North and South Site.
Reclamation & Revetment works for the South
Anchorage Area
CONSTRUCTION OF
SUBSTRUCTURE WORKS OF IZMIT
BAY SUSPENSION BRIDGE
PROJECT
Bridge Substructures Turkey
in progress
Bridge Substructures Turkey
in progress
Bridge Substructures Turkey
in progress
Bridge Substructures Turkey
in progress
Date: 2013-
Client: DP World Yarımca Liman İşletmeleri
A.Ş.
Contract Value: $191 m
Capacity: 1.2 million TEU
The project covers;
•2x450m berths combination wall structure with steel
tubular piles of app. 2.000mm diameter, anchored to the
steel tubular piles supporting the rear crane beam. At
corner ends, the structure will be tied in with anchor walls.
•For the main and side berth; dredging of the existing sea
bed up to a level of C.D. -16.5m to accommodate the
envisaged vessel range for the future Terminal.
YARIMCA CONTAINER TERMINAL
PROJECT
Ports and Harbours Turkey
in progress
Ports and Harbours Turkey
in progress
Jetties and Quaywalls Turkey
in progress
REHABILITATION OF QUAY AND
CONSTRUCTION OF NEW JETTY AT
ZONE B OF TUPRAS IZMIT REFINERY
Date: 2013 -
Client: Turkish Petroleum Refineries Co. (TÜPRAŞ)
Contract Value: $94 m
The project covers
• Quay Rehabilitation
• Steel Pipe Piles
• Bored Piles
• Precast Beams
• Sand Filling
• Stabilized Filling
• Fenders, Hooks, Bollards
• Jetty Construction
• Steel Pipe Piles
• Precast Beams
• Fenders, Hooks, Bollards, Quick Release Hooks
• Drainage Pipes
• Other Works
Jetties and Quaywalls Turkey
in progress
Experience in
Ports & Harbours, Jetties & Quaywalls,
Water Intakes & Outfalls
• Rubble Mound & Caisson Type
Breakwaters
• Shore Protection & Revetments
• Dredging & Reclamation
• Marinas
• Offshore Moorings
• Floating Piers & Breakwaters
STFA Experience
Breakwaters : 32,000 m
Dredging : 33,500,000 m3
Reclamation : 12,000,000 m3
Turkmenbashi Port, TURKMENISTAN ($27m)
Ormara Naval Base, Offshore Breakwater,
PAKISTAN ($148m)
Ports & Harbours Projects
Duqm Port, Oman ($1.35 billion)
Date : 2007-2013
Client : Ministry of Transport and Communication
Contract Value : $1.89 billion
(STFA-CCC JV)-JDN Consortium
(STFA -CCC Share : 950 M US$)
The project covers;
Construction of breakwaters to create the New Port and Drydock
Complex; dredging and reclamation.
4 km main breakwater and 5.1 km lee breakwater.
2250 m of commercial quay to minimum -18 m CD designed for
containers, general cargo and drydock bulk vessels;
680 m of navy and costguard quaywall to min -10m CD for navy and
coast guard vessels;
Reclamation behind breakwaters, quay walls and onshore, including
ground treatment to limit future settlement and to provide working
areas from surface water drainage.
Dredging to Approach Channel -19m CD; Harbour Basin and
Turning Circle -18m CD; construction pockets and corresponding
Navigation Aids
DUQM PORT PROJECT, OMAN
Ports and Harbours Oman
Ports and Harbours Oman
DUQM PORT, OMAN
Jetties & Quaywalls & Causeways Projects
Ras Laffan Port, LNG Loading Berth, QATAR ($47m)
Benghazi Oil & Gas Terminal, LIBYA ($51m)
Sohar Port, Bulk Liquid Berth, OMAN ($17m)
Jetties & Quaywalls & Causeways Projects
EPIC for Gabbro Berth Expansion (Package 1) at Mesaieed Port, QATAR ($531m)
Brega Port Renovation Project, LIBYA ($25m) EPIC for Container Terminal (Berth 7) at Mesaieed Port ($420 m)
Date: 2008-2011
Client: Qatar Petroleum
Contract Value: $380 m (EPC)
The project covers;
To lengthen the temporary berth 7 by 345m to form
a 485m long berth
Filling works behind the quay
Four nos of STS Gantry Cranes
Nine Nos of RTG Cranes
Electrical Works
Buildings
EPIC FOR CONTAINER TERMINAL (BERTH 7)
AT MESAIEED PORT
Jetties and Quaywalls Qatar
Jetties and Quaywalls Qatar
Date: 2008- 2010
Client: Qatar Petroleum
Contract Value: $512 m (EPC)
(STFA – JDN Consortium)
The project covers;
• 400m of Quaywall Construction
• 2,000nos. (70,000m³) of Block Fabrication
• 75,000m³ of Engineered Backfill
• Quay Furniture Installation
• 150,000m³ of filling behind Revetment
• 380m (20,000m³) of Revetment Removal
• 300m (35,000m³) of Revetment Construction
• 235nos of Crane Rail Piles
• 4 Nos. of STS Gantry Cranes
• Substation Building, Lighting and Cabling
EPIC FOR GABBRO BERTH EXPANSION
(PACKAGE 1) AT MESAIEED PORT
Jetties and Quaywalls Projects
Jetties and Quaywalls Projects
Date: 2007- 2011
Client: Jan De Nul NV (Saudi Aramco)
Contract Value: $255 m (EPC)
•The project covers the;
• Driving a total of 297 piles, 11 piles each in 27 islands with 90 cm
dia. and 30 m length.
• Infrastructure and the road pavement works of the 41 km long
causeway.
• Design and construction works of the North and South Berths and
the Ro-Ro facility.
• Construction of the main bridge which is 2.4 km long.
• 13 nos of bridge constructions which are180 m long each.
MANIFA CAUSEWAY PROJECT
Causeways Projects
Causeways Projects
Water Intakes & Outfalls
• Precast Intake Structures
• Pumphouse Structures
• Underwater Discharge & Intake Pipelines
• Underwater Precast Concrete Culverts
• Rubble Mound Water Intake Basins &
Structures
Küçüksu Sea Outfall, TURKEY ($21m)
Antalya Sea Outfall, TURKEY ($12m) Natural Gas Power Plant, Diliskelesi,
TURKEY
STFA Experience
Intakes / Outfalls : 33,000 m
Projects
Experience in
Roads, Bridges, Tunnels, Hydraulic Works
Water Treatment Plants, Buildings
Quriyat - Sur Road Project, Oman ($159m)
Lahore By Pass, PAKİSTAN
Büyükdere Interchange, Kınalı-Sakarya Motorway,
TURKEYİzmit - Adapazarı Motorway,
TURKEY ( $1259m)
• Roads
• Motorways
• Taxiways & Runways
STFA Experience
Roads : 700 km
Earthworks : 160,000,000 m3
Concrete Works : 8,585,000 m3
Concrete Pavement Works : 600,000 m³
Subbase/Base/Asphalt : 8,175,000 m3
Roads Projects
STFA Experience
Bridges / Viaducts : 85 km
Second Bosphorus Bridge, TURKEY ($1259 m) New Galata Bridge, TURKEY ($60 m)
İzmit By Pass Viaduct, TURKEY
Kömürhan Bridge, TURKEY
Wadi Arabiyin Bridge, OMAN
• Precast Beam Bridges
• Incrementally Launched Bridges
• Free Cantilever Bridges
• Suspension Bridges
• Steel / Composite Bridges
• Cable Stayed Bridges
• Aquaducts
Bridges Projects
STFA Experience
Tunnels : 100,000 m• Tunneling by TBM
• Conventional Tunneling (inc. NATM)
• Pipe - Jacking
• Cut & Cover
• Shaft Sinking
• Micro TunnelingGandaf Hard Rock Tunnel,
PAKISTAN ($74m)King Khalid Road Tunnel, S.ARABIA
Lakhdaria-Bouria Motorway Tunnel,
ALGERIA
• Road Tunnels
• Sewage Tunnels
• Power Tunnels
• Water Conveyance Tunnels
• Shafts
Tunnels Projects
Melen Bosphorus Tunnel,
TURKEY
Tunnels Turkey
completed
Date: 2006-2011
Client: State Hydraulic Works
Contract Value: $121m
Type : Beneath Seawater Tunnel
T.Length : 5.550m
Diameter : 5.820mm
Method : EPB Mode TBM (3,145m), Conventional (2,145m)
C.Section : Circular and Horse Shoe
Depth : 145m (14.5 bar pressure)
MELEN BOSPHORUS WATER TUNNEL
PROJECT
-145m
Tunnels Turkey
completed
STFA Experience
Earth Works : 162,000,000 m³
Concrete Works : 8,000,000 m³
Water Mains/Sewers : 1,850,000 m
Pehur High level Canal projects, PAKISTAN
($78m)Sazlıdere Dam, TURKEY ($45m)
Great Man Made River, Sirt and Reservoir, LIBYA
($85m)
• Rock & Earthfill Dams
• Concrete Dams
• Water Reservoirs
• Irrigation & Drainage Networks
• Water Supply Networks
• Sewerage Networks
• Pump Stations
Hydraulic Works Projects
Northern Jeddah Drainage Channel Culvert,
SAUDI ARABIA ($95m)
Adana Potable Water Treatment Plant,
TURKEY
Sirte Sewage Treatment Plant, LIBYA
Adana Potable Water Treatment
Plant, Filter Building, TURKEY
Küçüksu Sewage Pretreatment
Plant, TURKEY
Sirte Sewage Treatment Plant,
Rapid Sand Filter, LIBYA
• Water Treatment Plants
• Sewage Treatment Plants
Water Treatment Plants Projects
STFA Experience
Covered Area : 1,670,000 m2
Islamabad Turkish Embassy
Building, PAKISTAN
2200 Housing Units, Juffra – LIBYA,
($618m)
• Residential Complexes
• Commercial Buildings
• Hotels & Industrial
Buildings
• Airport Facilities
• Military Facilities
• High Rise Buildings
• Educational Buildings
• Hospitals
• Mosques
• Monuments
Buildings Projects
Souk Al Ahad 2000 Housing Units, Tripoli – LIBYA ($374m)
Experience in
Oil & Gas, Power Plants & Desalination Plants,
Power Transmission Lines &
Telecommunication Networks
• Oil & Gas Pipelines
• Oil & Gas Terminals
• Refineries & Petrochemical
Plants
STFA Experience
Gas Pipelines : 920 km
Oil Pipelines : 220 km
Oil & Gas Projects
1000 m3 LPG Spherical Tanks, LIBYA
216 km Hubara-Quarn Alam
Gas Pipeline of PDO, OmanAliağa Refinery Naphta Merox Plant, TURKEY
Marmara Ereglisi LNG Terminal, TURKEY
($245m)
• Thermal Power Plants
• Hydroelectric Power Plants
• Transformers, Substations
& Switchyard Installations
210 MW Orhaneli Thermal Power Plant,
TURKEY ($44 m)
4x75 tons/hr Steam Boilers, Tüpras,
İzmir Refinery, TURKEY
Power PlantsProjects
• HV Transmission Lines
• MV-LV Distribution Networks
• Railway Electrification & Signalization
• Fiber-Optic, Coaxial Cable Network
STFA Experience
H.V. T. Lines : 11,500 km
Stringing of OPGW in H.V.T. Lines : 2,000 km
Manufactured Galvanized Tower : 260,000 tons
Telecommunication Cabling : 8,000 km
Towers : 28,600 nos
Power Transmission Lines &
Telecommunication Networks Projects
400 kV Atatürk Dam Lines, TURKEY
735 kV Third Bosphorus
Crossing, TURKEY500 kV Suez Canal
Crossing, EGYPT (tower
height 221m)
Soil Improvement, Foundation &
Soil Investigation Works
• Onshore Piling
•Jet Grouting
• Diaphragm Walls
•Soil & Rock Anchores
• Wick Drains
• Underpinning
• Dewatering
• Thinwalls
• Onshore Investigation Works
• Offshore Investigation Works
• Field & Laboratory Testing
STFA Experience
Piles : 3,530,000 m
Mini Piles : 265,000 m
Sheet Piling : 330,000 m2
Jet Grouting : 660,000 m
Drilling : 500,000 m
Western Libya Gas Project Supply Base & Tugboat Harbour
Offshore & Onshore Soil Investigation Works, Libya
Projects
Star Refinery,
Soil Investigation
Turkey
Soil Improvement, Foundation & Soil Investigation Works
Petronas HDD, Soil Investigation, TURKEY
Temporary Dry Docks in Offshore Element
Fabrication Site in Tuzla, TURKEY
Jumeirah Beach Residence JBR4&6 Dubai, UAE
Soil Improvement, Foundation & Soil Investigation WorksProjects
Algiers Metro May 1st Station Tunnel,
ALGERIA
Engineering & Project Management
• Project Management
• Construction Management
• Engineering &Consultancy
Services
• Feasibility Study
• Geodesy & Photogrammetry
• Quality Control & Auditing
• Conditional Assessment Izmir LRT Project, Phase 2, Eng. &
Consultancy Services, TURKEY
Engineering & Project Management
Pars Petrochemical Portt, Construction
Management Consultancy, IRAN
Manifa Causeway, SAUDI ARABIA
Foundations
İNANÇ FOUNDATION
• Established in 1990 by Mr.Sezai Türkeş and Mrs.Tomris Taşkent
• Provides free education for gifted Turkish children from poor
families
• Promotes the academic, social, emotional and physical growth of
students
• In 2002, İnanç Foundation was donated to Turkish Education
Foundation
FEYZİ AKKAYA TEMEL EDUCATION FOUNDATION
• Founded in 1978
• Provides training to intermediary technical staff.
• Aid to students seeking training in Technical and Vocational
High Schools
• Contributes to the Ministry of National Education by building
schools and providing educational equipment.
• Provides scholarship to 3.070 students annually.