Transcript of Presentation sidra
![Page 1: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/1.jpg)
UNDER SUPERVISION OF Prof. Dr. Hj. Amiruddin Ismail
Prepared by : HAMZAH ALI P 63147HOOMAN PZURINDA BT MAT RABU P
OPTIMIZATION OF TRAFFIC FLOW BY USING
SIDRA INTERSECTION
![Page 2: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/2.jpg)
Contents
Introduction
Input
Output
Conclusion
![Page 3: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/3.jpg)
INTRODUCTION
INTERSECTION
Allow the change of
route directions of traffic flows.
Traffic control
systems are capable to
reduce delays and crashes on
intersection
Problem of delay still
occurs
An area which shared
by two or more roads.
![Page 4: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/4.jpg)
![Page 5: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/5.jpg)
SIDRA
• Estimate of capacity and performance characteristics
• Analyze and optimize the intersections
• Determine signal timing
• Carry out a design life analyze for traffic growth
![Page 6: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/6.jpg)
SIDRA INTERSECTION User
![Page 7: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/7.jpg)
Advantages of using sidra
Use the parameter sensitivity
Use a lane-by-lane analysis method
Consistent with the US Highway capacity manual
Provide a Excel application to support model comparison
Estimate operation cost , fuel consumption , co2 & other emission
![Page 8: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/8.jpg)
Study objective
• The main objective of the Study is to prepare low cost
solutions to an existing intersection
![Page 9: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/9.jpg)
Study area
• The intersection is located in front of the main entrance of UKM.
• North side :Toll Bangi/Bandar Baru Bangi
• South side : UKM
• West side come from Bangi and will end to Kajang at East .
![Page 10: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/10.jpg)
N
To KajangTo
Bangi
![Page 11: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/11.jpg)
Data's 8-9 am & 6 – 7 pm
• Duration 15min => extended to 1hour
• Considerations : Vehicle types, direction, speed (to gain mean speed)
![Page 12: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/12.jpg)
PCU / UNIT
![Page 13: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/13.jpg)
Input Part OF SIDRA INTERSECTION Software
![Page 14: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/14.jpg)
Creating a new site and select an intersection type
First, to create our site, we select signals type
according to our case study
![Page 15: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/15.jpg)
Intersection Input dialog and insert data
We use the Intersection input dialog to establish the basic intersection configuration
![Page 16: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/16.jpg)
Intersection Input dialog and insert data
To Insert or delete an intersection leg we
should just click the leg
![Page 17: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/17.jpg)
Intersection Input dialog and insert data
Title: Four way intersection/grop 7
![Page 18: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/18.jpg)
Intersection Input dialog and insert data
Intersection ID: UKM
![Page 19: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/19.jpg)
Intersection Input dialog and insert data
Signal analyze method: fixed-time/pretimed
![Page 20: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/20.jpg)
Intersection Input dialog and insert data
These data apply to intersection as a whole.
Unit Time for Volumes: 60 minutesPeak Flow Period : 30 minutes
![Page 21: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/21.jpg)
Geometry Input dialog
Geometry node and Geometry Input dialog
The Geometry input dialog is used to configure approach and exit lanes, modify movements and insert other characters
![Page 22: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/22.jpg)
Geometry Input dialog (Lane & movements tab)
we should click a desirable leg to select it
To select a desirable lane, we should just click the lane
![Page 23: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/23.jpg)
Geometry Input dialog (Lane & movements tab)
we should click a desirable leg to select it
We can insert one approach and exit lane by clicking these
buttons for the selected leg
![Page 24: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/24.jpg)
Geometry Input dialog (Lane & movements tab)
we should click a desirable leg to select it
We can allocate desirable movements by clicking these buttons to
the selected lane
![Page 25: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/25.jpg)
Geometry Input dialog (Lane & movements tab)
we should click a desirable leg to select it
In this boxes we can input lane type, short lane, and lane length
![Page 26: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/26.jpg)
Geometry Input dialog (Lane & movements tab)
we should click a desirable leg to select it
To specify a Median for the selected leg, we should click the
Median check box and then insert the width of Median
![Page 27: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/27.jpg)
Geometry Input dialog (Lane data tab)
we input 3.3m for the width of lanes and 0 for
grads
we should click a desirable leg to select it
We choose1800 PCU/h for Basic
Saturation Flow
And accept the other defaults for this part
![Page 28: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/28.jpg)
Volume Input dialog
We choose separate LV & HV method to insert vehicle volume
We input the collected volume data for the selected
direction according to separate LV & HV method
![Page 29: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/29.jpg)
Figure of Volume Summary (volume summary node)
![Page 30: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/30.jpg)
PATH DATA dialog
We insert MOVEMENT PATH DATA for the
selected direction
For example for our site, approach cruise speed is 30km/h
Negotiation Speed, Negotiation Distance, and Downstream Distance will
be calculated by the program
![Page 31: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/31.jpg)
Specify the items in PATH DATA dialog
Vehicle’s speed at this point is Approach Crouse Speed
(Vac)
Approach travel Distance
Vehicle reaches Exit Crouse
Speed (Vec) at this point
APPROACH under consideration
![Page 32: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/32.jpg)
MOVEMENT DATA input dialog
The defaults of program for Movement
data are Accepted
![Page 33: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/33.jpg)
Priorities input dialog
Priorities dialog establishes Opposing movements for the selected movement
Select movement to be defined as
opposed movement
Click desirable movements to define them as opposing/not opposing
movements
![Page 34: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/34.jpg)
GAP-ACCEPTANCE DATA dialog
The
For GAP-ACCEPTANCE DATA We give the default values to the
program
![Page 35: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/35.jpg)
Phasing & Timing input dialog
In Phasing & Timing input dialog We use command buttons to edit
We must click this box in order to designate it as the Current Sequence , Which is analyzed by the program
![Page 36: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/36.jpg)
Phasing & Timing input dialog
Clone Sequence button is used to create a new Sequence for editing
![Page 37: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/37.jpg)
Phasing & Timing input dialog
Clone Phase button is used to create a new Phase for editing
The UKM Intersection is a Four Phase Intersection
![Page 38: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/38.jpg)
Phasing & Timing input dialog
For Vehicle Movement Timing Data we accept the defaults
![Page 39: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/39.jpg)
Phasing & Timing input dialog
In Phase Data dialog, we insert the Phase Time for each phase
![Page 40: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/40.jpg)
Model Settings input dialog
The parameters of MODEL SETTING affect the results significantly. However,
the defaults of parameters are appropriate generally
![Page 41: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/41.jpg)
Input Report node
We can get the summery of input data in the Input Report node
![Page 42: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/42.jpg)
Output Part OF SIDRA INTERSECTION Software
![Page 43: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/43.jpg)
![Page 44: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/44.jpg)
![Page 45: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/45.jpg)
![Page 46: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/46.jpg)
![Page 47: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/47.jpg)
![Page 48: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/48.jpg)
Total delay (average)
4640.7
![Page 49: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/49.jpg)
Level of Service
LOS Signalized Intersection
Unsignalized Intersection
A ≤10 sec ≤10 secB 10-20 sec 10-15 secC 20-35 sec 15-25 secD 35-55 sec 25-35 secE 55-80 sec 35-50 secF ≥80 sec ≥50 sec
A= Free flowB=Reasonably free flowC=Stable flowD=Approaching unstable flowE=Unstable flowF=Forced or breakdown flow
![Page 50: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/50.jpg)
![Page 51: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/51.jpg)
![Page 52: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/52.jpg)
![Page 53: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/53.jpg)
![Page 54: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/54.jpg)
![Page 55: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/55.jpg)
![Page 56: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/56.jpg)
![Page 57: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/57.jpg)
![Page 58: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/58.jpg)
![Page 59: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/59.jpg)
![Page 60: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/60.jpg)
![Page 61: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/61.jpg)
16500.6
Total cost
![Page 62: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/62.jpg)
970
Total fuel
![Page 63: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/63.jpg)
2430.4
Total CO2
![Page 64: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/64.jpg)
![Page 65: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/65.jpg)
![Page 66: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/66.jpg)
Review:
what is our plan?
collecting data(input)
for simulation(output)
optimizing (output)current situation
OPTIMIZING THE UKM INTERSECTION
CHOOSING OPTIMUM CYCLE TIME
CHANGING CURRENT PHASE TIME
ADDING SLIP LANE ON ALL APPROACHES
ADDING ONE APPROACH & EXIT LANE IN ALL DIRECTIONS
![Page 67: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/67.jpg)
![Page 68: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/68.jpg)
OPTIMIZING CYCLE : TIMECHANGIN G CYCLE TIME FROM 164 TO 150
![Page 69: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/69.jpg)
![Page 70: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/70.jpg)
SECOND MODIFICATION : CHANGING CURRENT FOUR PHASE TO TWO PHASE
![Page 71: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/71.jpg)
![Page 72: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/72.jpg)
![Page 73: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/73.jpg)
THIRD MODIFICATION : ADDING SLIP LANES INTO THE ALL APPROACHES
![Page 74: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/74.jpg)
![Page 75: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/75.jpg)
![Page 76: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/76.jpg)
![Page 77: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/77.jpg)
FOURTH MODIFICATION : ADDING LANE INTO EACH APPROACH & EXIT WAY
![Page 78: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/78.jpg)
ADDING LANE INTO EACH APPROACH & EXIT WAY
![Page 79: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/79.jpg)
![Page 80: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/80.jpg)
![Page 81: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/81.jpg)
1 2 3 40
500
1000
1500
2000
2500
3000
co2 (kg/h)
co2 (kg/h)
MODIFY 2 MODIFY 3CURRENT MODIFY 2
1 2 30
10
20
30
40
50
60
70
80
DECREASING OF CO2 (%)
DECREASING CO2 (%)
MODIFY 1 MODIFY 2 MODIFY 3
74 %
![Page 82: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/82.jpg)
1 2 3 40
2000
4000
6000
8000
10000
12000
14000
16000
18000
COST (RM)
COST (RM)
MODIFY 2 MODIFY 3CURRENT MODIFY 1
1 2 30
10
20
30
40
50
60
70
80
90
DECREASING OF COST (%)
DECREASING CO (%)
MODIFY 1 MODIFY 2 MODIFY 3
82.68 %
![Page 83: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/83.jpg)
1 2 3 40
200
400
600
800
1000
1200
FUEL (LITRE)
FUEL (LITRE)
MODIFY 2 MODIFY 3CURRENT MODIFY 1
1 2 30
10
20
30
40
50
60
70
80
DECREASING OF FUEL (%)
DECREASING FUEL (%)
MODIFY 1 MODIFY 2 MODIFY 3
74 %
![Page 84: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/84.jpg)
1 2 3 40
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
AVERAGE DELAY (SECOND)
AVERAGE DELAY (SECOND)
MODIFY 1 MODIFY 3CURRENT MODIFY 2
1 2 30
10
20
30
40
50
60
70
80
90
100
DECREASING OF AVERAGE DELAY (%)
DECREASING AVERAGE DELAY (%)
MODIFY 1 MODIFY 2 MODIFY 3
93.38 %
![Page 85: Presentation sidra](https://reader035.fdocuments.us/reader035/viewer/2022081800/555b8fdcd8b42acd238b5070/html5/thumbnails/85.jpg)
Thank you