Presentation Overview

20
I-95 Managed Lanes I-95 Managed Lanes CORSIM Analysis CORSIM Analysis Status Meeting Status Meeting 11-15-07 11-15-07 Presented by Presented by David Stroud, PE, AICP David Stroud, PE, AICP Reynolds, Smith and Hills, Inc. Reynolds, Smith and Hills, Inc.

description

I-95 Managed Lanes CORSIM Analysis Status Meeting 11-15-07 Presented by David Stroud, PE, AICP Reynolds, Smith and Hills, Inc. Presentation Overview. Purpose Traffic Weave Types Operational Characteristics HOT Lane Access at 81 st HOT Access at GGI. 95 Express CORSIM Scope. Purpose - PowerPoint PPT Presentation

Transcript of Presentation Overview

Page 1: Presentation Overview

I-95 Managed LanesI-95 Managed LanesCORSIM AnalysisCORSIM Analysis

Status MeetingStatus Meeting11-15-0711-15-07

Presented byPresented byDavid Stroud, PE, AICP David Stroud, PE, AICP

Reynolds, Smith and Hills, Inc.Reynolds, Smith and Hills, Inc.

Page 2: Presentation Overview

Presentation OverviewPresentation Overview

• PurposePurpose

• TrafficTraffic

• Weave TypesWeave Types

• Operational CharacteristicsOperational Characteristics-HOT Lane Access at 81HOT Lane Access at 81stst -HOT Access at GGIHOT Access at GGI

Page 3: Presentation Overview

95 Express CORSIM Scope95 Express CORSIM Scope

• PurposePurpose– To model operational characteristics of the I-95 To model operational characteristics of the I-95

Express project .Express project .• Evaluate HOT ingress/egress locations based on Evaluate HOT ingress/egress locations based on

weaving and access/proximity to interchanges. weaving and access/proximity to interchanges. • Assessment based on freeway system Assessment based on freeway system

operationsoperations

• Project ScopeProject Scope– Stage 1: South of I-395 to North of GGI plus IOARStage 1: South of I-395 to North of GGI plus IOAR– Stage 2: North of GGI to North of I-595Stage 2: North of GGI to North of I-595– Stage 3: Corridor Assessment of HOT Stage 3: Corridor Assessment of HOT

ingress/egress ingress/egress

Page 4: Presentation Overview

Existing Demand – Build Scenario Existing Demand – Build Scenario

2,2002,200 HOT LanesHOT Lanes

GP LanesGP Lanes

78%78%

10,000 vph10,000 vph 7,8007,800

22% *22% *

* SERPM 2010 Build* SERPM 2010 Build

1,660 vph/ln1,660 vph/ln

1,100 vph/ln1,100 vph/ln

1,950 vph/ln1,950 vph/ln

Page 5: Presentation Overview

Speed – Flow – Density Speed – Flow – Density

Page 6: Presentation Overview

Weaving –Type A WeaveWeaving –Type A Weave

AllAll weaving vehicles must make weaving vehicles must make oneone lane change lane change to complete their maneuver successfullyto complete their maneuver successfully

Page 7: Presentation Overview

Weaving – Type B WeaveWeaving – Type B Weave

OneOne weaving movement can be made weaving movement can be made withoutwithout making making any lane changes while any lane changes while the otherthe other weaving weaving movement requires at most movement requires at most oneone lane change lane change

Page 8: Presentation Overview

Weaving – Type C WeaveWeaving – Type C Weave

OneOne weaving movement may be made weaving movement may be made withoutwithout making a lane change while making a lane change while the otherthe other weaving weaving movement requires movement requires two or moretwo or more lane changes lane changes

Page 9: Presentation Overview

8181stst Street HOT Access Street HOT Access

10,000 7,800 7,300 7,800

2,900 2,500 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

Entrances From

I-195/SR 112

NW 62nd St

NW 69th St

NW 81st St

Total

Ramp Vol.

2,350 vph

780 vph

260vph

870vph

4,260 vph

Exit to

PNRExit to

Flyover

Exit to

Turnpike

6,600

I-95 Northbound

2,200

700

NW 81st St NW 95th St 7,900

• Operational CharacteristicsOperational Characteristics– Type C Weave 4 Service Interchanges 950 Type C Weave 4 Service Interchanges 950

vphvph

Weave Vol.

465 vph

198 vph

67 vph

220 vph

950 vph

1001,500

2,200

Page 10: Presentation Overview

8181stst Street HOT Access Street HOT Access

10,0007,800

7,300 7,800

2,900 2,500 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

7,900 6,600NW 95th St

I-95 Northbound

2,500

7,300 7,800950 1,400

2,900

2,200

700

1,500

6,400

NW 81st St

• Operational CharacteristicsOperational Characteristics– Type A Weave 950 vph + 1,400 vphType A Weave 950 vph + 1,400 vph

Exit to

PNRExit to

Flyover

Exit to

Turnpike

1001,500

2,200

Page 11: Presentation Overview

8181stst Street HOT Access Street HOT Access

10,000 7,800 7,300 7,800

2,900 2,500 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

6,600

Ramp Vol.

445 vph

660 vph

680 vph

390 vph

685 vph

150 vph

3,010 vph

Exits to

NW 95th St

NW 103rd St

NW 119th St

NW 125th St

NW 135th St

NW151st St

Total

I-95 Northbound

2,200

700

NW 81st St NW 95th St 7,900

• Operational CharacteristicsOperational Characteristics– Type C Weave 6 Service Interchanges 1,400 Type C Weave 6 Service Interchanges 1,400

vph vph

Weave Vol.

234 vph

234vph

234 vph

234 vph

419 vph

45 vph

1,400 vph

Exit to

PNRExit to

Flyover

Exit to

Turnpike

1001,500

2,200

Page 12: Presentation Overview

8181stst Street HOT Access Street HOT Access

10,000 7,800 7,300 7,800

2,900 2,500 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

Entrances From

I-195/SR 112

NW 62nd St

NW 69th St

NW 81st St

Total

Ramp Vol.

2,350 vph

780 vph

260vph

870vph

4,260 vph

6,600

Ramp Vol.

445 vph

660 vph

680 vph

390 vph

685 vph

150 vph

3,010 vph

Exits to

NW 95th St

NW 103rd St

NW 119th St

NW 125th St

NW 135th St

NW151st St

Total

I-95 Northbound

2,200

700

NW 81st St NW 95th St 7,900

• Operational CharacteristicsOperational Characteristics– Type C Weave 4 Service Interchanges 950 Type C Weave 4 Service Interchanges 950

vphvph– Type A Weave 950 vph + 1,400 vphType A Weave 950 vph + 1,400 vph– Type C Weave 6 Service Interchanges 1,400 Type C Weave 6 Service Interchanges 1,400

vphvph

Weave Vol.

465 vph

198 vph

67 vph

220 vph

950 vph

Weave Vol.

234 vph

234 vph

234 vph

234 vph

419 vph

45 vph

1,400 vph

Exit to

PNRExit to

Flyover

Exit to

Turnpike

1001,500

2,200

Page 13: Presentation Overview

GGI HOT AccessGGI HOT Access

10,0007,800

7,300 7,800

2,900 2,500 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

7,900 6,600NW 95th St

I-95 Northbound

NW 81st St

1,600

7,900 8,800700 1,600

2,500

2,200

700

7,200

900

• Operational CharacteristicsOperational Characteristics– Type C Weave 6 Service Interchanges 700 Type C Weave 6 Service Interchanges 700

vphvph– Type A Weave 700 vph + 1,600 vphType A Weave 700 vph + 1,600 vph– Type C Weave to I-95 NB exitsType C Weave to I-95 NB exits

Exit to

PNRExit to

Flyover

Exit to

Turnpike

1001,500

2,200

Page 14: Presentation Overview

GGI HOT AccessGGI HOT Access

10,000 7,8007,300 7,800

2,900 2,500Exit to

HOT Lane

Entry from

I-195 Flyover

700 vph

7,900 7,300NW 95th St

I-95 Northbound

NW 81st St

900

7,900 9,500

1,600

2,500

2,200

7002,500

900

Exit to

PNR

Exit to

Turnpike

50850

2,200

• Operational CharacteristicsOperational Characteristics– Type C Weave eliminatedType C Weave eliminated– Type A Weave changes to Type BType A Weave changes to Type B– Type C Weave to I-95 NB exitsType C Weave to I-95 NB exits

Page 15: Presentation Overview

GGI HOT Access GGI HOT Access (81(81stst Closed) Closed)

10,0007,800

7,300

2,900 2,900 2,900Exit to

HOT Lane

Entry from

I-195 Flyover

7,300 6,400NW 95th St

I-95 Northbound

NW 81st St

1,600

7,300 8,600600 1,900

2,900

2,200

700

6,700

1,000

Exit to

PNRExit to

Flyover

Exit to

Turnpike

100 1,600

2,200

• Operational CharacteristicsOperational Characteristics– Type C Weave 6 Service Interchanges 600 Type C Weave 6 Service Interchanges 600

vphvph– Type A Weave 700 vph + 1,600 vphType A Weave 700 vph + 1,600 vph– Type C Weave to I-95 NB exitsType C Weave to I-95 NB exits

Page 16: Presentation Overview

GGI HOT Access GGI HOT Access (81(81stst Closed) Closed)

10,000 7,8007,300

2,900 2,900Exit to

HOT Lane

Entry from

I-195 Flyover

700 vph

7,300 7,000NW 95th St

I-95 Northbound

NW 81st St

1,000

7,300 9,200

1,900

2,900

2,200

7002,900

1,000

Exit to

PNRExit to

Flyover

Exit to

Turnpike

50950

2,200

• Operational CharacteristicsOperational Characteristics– Type C Weave eliminatedType C Weave eliminated– Type A Weave changes to Type BType A Weave changes to Type B– Type C Weave to I-95 NB exitsType C Weave to I-95 NB exits

Page 17: Presentation Overview

Turnpike Access Turnpike Access (81(81stst Closed) Closed)

10,000 7,8007,300

2,900 2,900Exit to

HOT Lane

Entry from

I-195 Flyover

700 vph

7,300 7,000NW 95th St

I-95 Northbound

NW 81st St

2,200

7002,900

1,000

Exit to

PNRExit to

Flyover

Exit to

Turnpike

50950

2,200

• Operational CharacteristicsOperational Characteristics– Complex !Complex !

?

Page 18: Presentation Overview

Turnpike AccessTurnpike Access

HOT

HOV

TPK

TPK

• Existing Lane ConfigurationExisting Lane Configuration

Biscayne Canal

Page 19: Presentation Overview

Turnpike AccessTurnpike Access

HOT

HOV

TPK

TPK

• Alternate 1 Alternate 1

Biscayne Canal

Page 20: Presentation Overview

Turnpike AccessTurnpike Access

HOT

HOV

TPK

TPK

• Alternate 2 Alternate 2 PreferredPreferred

Biscayne Canal