DRDA-IT-Hamirpur 1
Presentation on Watershed DevelopmentProgramme
![Page 2: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/2.jpg)
DRDA-IT-Hamirpur 2
Map District Hamirpur.
![Page 3: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/3.jpg)
DRDA-IT-Hamirpur 3
Watershed Development in HamirpurDistrict:
Watershed development has been adopted as an approach to conserve and develop the natural resources. Peoples participation as the main strategy for its planning and implementation is the most important element in this approach. A watershed has been defined as geographical unit that drains at a common point.
![Page 4: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/4.jpg)
DRDA-IT-Hamirpur 4
Watershed Management:It is a process to achieve sustainable development of
natural resources like soil, water and vegetation. It helps in understanding the relationship among soil, water and plants and linkages between uplands and downstream.
A watershed has been planned keeping in view the three physical sectors:
i.) Non-arable land, which includes forestland, grazing land and barren land.
ii.) Arable or cultivated land.iii.) Drainage area comprising networks of natural drainage lines and
waters bodies.
![Page 5: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/5.jpg)
DRDA-IT-Hamirpur 5
Approach:A watershed project has been delineated into various micro-watersheds of about 500 hact. each of treatable land for various soil conservation measures, promoting sustainable production systems for arable and nonarable land and also to improve the socio-economic status of the watershed community.
![Page 6: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/6.jpg)
DRDA-IT-Hamirpur 6
Organization support:
envisages:
i.) People’s participation in the form of association and its functional groups namely WA(Watershed Association), WDC(Watershed Development Committee) and VDC(Village Development Committees). These has been formed in each Micro Watershed.
ii.) A Watershed area consisting of 12-13 Micro-Watershed has been allotted in the district with the one PIA (Project Implementing Agency). Block Development Officer of the project area has been designated as PIA and have been provided one multidisciplinary team of 3-4 persons.
Contd./---------
![Page 7: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/7.jpg)
DRDA-IT-Hamirpur 7
iii.) in each Micro Watershed there is a chairman and one Secretary for convening watershed meeting and maintaining the record and accounts of Watershed.iv.) SHGs/UGs has also been formed in the Watershed area.
![Page 8: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/8.jpg)
DRDA-IT-Hamirpur 8
Structure and implementation of watershed projects in Hamirpur District :
There are three main components of watershed development.A.) Training: it includes training of all persons involved in implementation of watershed programme including the villagers.B.) Community Organization: activities are being performed like conducting of Participatory Rural Appraisal Exercises, awareness camps, exposure visits and formation of SHGs and UGs.C.) Watershed Treatment/Development Works: Under this component the following activities are being taken up:
i.) Land development including in situ measures and soil conservation.ii.) Drainage line treatment by vegetative and engineering structures.iii.) Development of small Water Harvesting Structure such as check dams,
water percolation tanks ponds etc.iv.) Nursery raising for fodder, timber, fuel wood and fruit plant species.v.) Different type of afforestation work.vi.) Agro forestry and Horticulture Development.
vii.) Pasture development.
![Page 9: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/9.jpg)
DRDA-IT-Hamirpur 9
Watershed Project Wise Map of HamirpurDistrict.
![Page 10: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/10.jpg)
DRDA-IT-Hamirpur 10
Organisational Setup
District Watershed Development Advisory Committee(DRDA)
PIA(BDOs)
WDT
WC`s/WA`s
VDC`s/SHG`s/UG`s
![Page 11: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/11.jpg)
DRDA-IT-Hamirpur 11
Total Watershed Projects in District Hamirpur:
I. IWDP-II2. IWDP-III3. IWDP-IV
![Page 12: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/12.jpg)
DRDA-IT-Hamirpur 12
Project Wise ProfileIWDP - II
BDO-Hamirpur(PIA)
BDO-Sujanpur (PIA)
Area = 6220 Ha.Cost = 248.80 LacsPeriod = 5 YearsVillages=164
Area = 6280 Ha.Cost = 251.20 LacsPeriod = 5 YearsVillages=106
Micro Watershed:1Karot Nalla-I2Salghoon Nalla3Karot Nalla-II4Retian Khad5Choe Chukrala6Bamnehad Khad7Chabutra Nalla-I8Chabutra Nalla-II9Amroh Nalla10Kuthera Nalla11Sastar Nalla
Micro Watershed:1Papled Khad –I2Papled Khad-II3Sukad Khad-I4Sukad Khad-II5Kakkar Nalla6Jangled Khad7Rangrian Dhar8Bhede Ka Nalla9Jamli Khad10Jhokar Khad11Tikkari Khad12Jangled Khad
![Page 13: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/13.jpg)
DRDA-IT-Hamirpur 13
IWDP – III
BDO-Bhoranj(PIA)
BDO-Bijahri(PIA)
Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=158
Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=112
Micro Watershed:1Maserdu2Amman3Tikkar Upperla4Panjot5Bagwara6Tarkwari7Tal8Mahal9Ratwani10Aghar11Bhota12Ropri
Micro Watershed:1Phahal2Uttap3Gahali4Haretta5Kalohan6Kanoh7Barsar8Dandroo9Tipper10Kakkar11Kalwara12Kothi13Bihar-Kalan
![Page 14: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/14.jpg)
DRDA-IT-Hamirpur 14
IWDP - IV
BDO-Bamson (PIA) BDO-Nadaun(PIA)Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=118
Area = 6250 Ha.Cost = 375 LacsPeriod = 5 YearsVillages=113
Micro Watershed:1Ghanal2Karara3Lambloo4Dugha5Sawahal6Gasota7Dhalot8Jhanikar9Sikandar10Dughali11Patta12Dasmal13Bajoh
Micro Watershed:1Pansai2Rajohal3Paniyali4Dadoh5Jassai6Daad7Kashmir8Dagoh9Plassi10Dhanoha11Kushiyar12Dhaneta13Tippar
![Page 15: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/15.jpg)
DRDA-IT-Hamirpur 15
Date of Sanction
24/1/2000 31/8/200025/3/2001
AmountReceived till date(Lacs)
220.94218.80223.34
Nos of Installment
Received
322
Actual Expenditure incurred upto31/03/03 (in Lacs)
Training
19.3210.079.30
Admn.
27.9820.7313.21
CO & EPA
44.2533.2021.35
Works
114.5440.2935.08
Total
206.09104.2978.94
Financial Achievement Project Wise
Name of Projects
1.IWDP-II2.IWDP-III3.WDP-IV
![Page 16: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/16.jpg)
DRDA-IT-Hamirpur 16
Project wise Physical Achievements under the Watershed Development Programme
SrNo.
1
2
3
4
5
6
7
8
9
10
11
12
Particulars
Gully Plugs
Contour and gradedbandhsCrate/Spur work
Farm ponds
Nallah Bandhs /Check DamsMinor Irrigation.
Pasture Development
Horticulture DevelopmentNos. of fruit pants planted.Total Area Treated.
Afforestation work Nos.of fuel plants planted.Nursery raising
W.A. Formed
Unit
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.
Hect.
Nos
Hect
Nos.
Nos
Nos
IWDP-II
177
215
72
62
62
59
15.70
43000
4134.38
21500
4
23
IWDP-III
17
---
15
1
28
---
111.90
32054
1040.43
23000
---
25
IWDP-IV
26
---
9
1
17
---
47.00
35084
450.83
2800
---
26
![Page 17: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/17.jpg)
DRDA-IT-Hamirpur 17
Monthly Monitoring Proforma Under IWDP for Each Micro Watershed.
Monthly Monitoring Proforma under "IWDP Dev.Block for the month of .
Component wise funds received.Sr. Name of ActivityFunds FundsNo. received Utilized1 Training2 Administration3 CO/EPA.4 Works
Sr. Name of Micro- Name of Activity/Name Estimated Expenditure Commul- Status of Area Mandays Generated Gram KoshNo. watershed (Head) of work under- cost of incurred. ative Expd. work. covered SC Other Total Women Previous Gross
taken. the activity (Hect.) Amt. Amt.1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
![Page 18: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/18.jpg)
DRDA-IT-Hamirpur 18
Success Stories Under IWDP
![Page 19: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/19.jpg)
DRDA-IT-Hamirpur 19
Worthy DC-Cum-CEO, DRDA, Hamirpur Smt. Anuradha Thakur, IAS Addressing the Members of Various Was of IWDP-IV (Man-II) at Galore District – Hamirpur
![Page 20: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/20.jpg)
DRDA-IT-Hamirpur 20
Various SHGs/UGs/members of WAs are being oriented towards Watershed Prorammes.
![Page 21: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/21.jpg)
DRDA-IT-Hamirpur 21
Exposure Visit: Members of Various WAs/WCs IWDP-IV Man Khad-II on exposure visit.
![Page 22: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/22.jpg)
DRDA-IT-Hamirpur 22
Work under EPA: Repair of bouli in Vill-Chhapper IWDP-II (Bakkar Khad)
Before
After
![Page 23: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/23.jpg)
DRDA-IT-Hamirpur 23
Work Under EPA: Plastering/Flooring of M.M. Bhawan In Vill. Nukhel M.W. Dagoh IWDP-IV (Man –II)
![Page 24: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/24.jpg)
DRDA-IT-Hamirpur 24
Survey and Planning: WDT Member with villagers at Check Dams Site in Vill. Karsai M.W. – Plassi IWDP-IV (Man –II)
![Page 25: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/25.jpg)
DRDA-IT-Hamirpur 25
Work Under EPA: Repair of Bouli Completed. Villagers Worshiping Lord Indra after completion IWDP-II (Salasi Khad)
![Page 26: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/26.jpg)
DRDA-IT-Hamirpur 26
Plantation: Vegetable and Fodder Plantation in Vill.Bhati M.W. Kuthera Nalla IWDP-II (Salasi Khad)
![Page 27: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/27.jpg)
DRDA-IT-Hamirpur 27
Check Dam: in Village-Beha M.W.-Pansai IWDP-IV Man Khad-II Cost.= Rs. 3,00,000.
![Page 28: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/28.jpg)
DRDA-IT-Hamirpur 28
Contour Plantation: in Village –Parnali IWDP-II (Bakkar Khad)
![Page 29: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/29.jpg)
DRDA-IT-Hamirpur 29
Check Dam: Shiuni M.W. Kuthera Nalla IWDP-II ( Salasi Khad) Cost. Rs. 97,946 Command Area= 10 Hect.
![Page 30: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/30.jpg)
DRDA-IT-Hamirpur 30
Check Dam : at Muthan Chambialan IWDP-II (Salasi Khad) Cost= Rs. 44,915 Command Area = 8 Hect.
![Page 31: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/31.jpg)
DRDA-IT-Hamirpur 31
Farm Pond: Improvement of farm pond in Village Chowki Jamwalan M.W. Kuthera Nalla IWDP-II (Salasi Khad) Cost Rs. 27,000/-
![Page 32: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/32.jpg)
DRDA-IT-Hamirpur 32
![Page 33: Presentation on Watershed Development Programmehprural.nic.in/iwdphmr.pdf · DRDA-IT-Hamirpur 8 Structure and implementation of watershed projects in Hamirpur District : There are](https://reader033.fdocuments.us/reader033/viewer/2022041712/5e48aab42e035d6fb84e9861/html5/thumbnails/33.jpg)
DRDA-IT-Hamirpur 33
Thanks for viewing