Regional conference on Digital Switchover Belgrade, 22 November 2011 Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept.

Transcript of Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs...

Page 1: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Presentation on

GE06 procedures and Tools

Mrs Ilham GHAZI

Radiocommunation Engineer- Terrestrial Dept.

Page 2: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Overview

Definition of GE06 Plan modification

General procedure

Coordination examination

Conformity examination

Follow-up and consultation

BRIFIC DVD

Web Application

Technical calculations:

Affected administrations-coordination examination art4

Conformity examination- conversion or article 5

Compatibility analysis

Propagation tool

2

Page 3: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Basic definitionsBasic definitions

Plan modification definition(§ 4.1 and 4.2 of

Article 4):

Change characteristics of an allotment or assignment already in the Plans (MOD);

Add an allotment or assignment to the Plans (ADD);

Add an assignment stemming from an allotment to the digital Plan (ADD);

Cancel (suppress) from the Plans an allotment or an assignment (SUP).

3

Page 4: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Article 4 proceduresArticle 4 procedures

4

Part B publication

Part B publication all necessary

agreements Part A publication Coordination exam Notice submission

Normal

procedure:

Pub_req=FALS

E

Shortcut procedure

Pub_req= TRUE ... 40

days

Part B publication

all necessary

agreements

TB3 notice

Part A publication Coordination exam Notice submission ... 75

days

Converted assignment (Only

GE06D) In conformity

If not

If not 30 days to comply

If not, notice deleted

GE06L

•GS1

•GT1

•GS2

•GT 2

GE06L

•G11

•G13

GE06A

•G02

Conformity exam Notice submission

Page 5: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Publication process–Article 4

5

Proposed

modification

No agreement

removal, no request

to be added

All necessary

agreements

Part A Coordination

examination

Part B

40 days

over

1. Part B, if conform

2. Returned after 30 days

if still not in conformity

Conformity

examination

For the Plans,

within 24 months

+75 days. If not:

deleted

Conversion

(§ 4.1.2.7) !!!

Not a

Conversion!!!

Y

N

Page 6: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Article 5 procedure

6

Notified

assignment

Plan Remarks

satisfied

Part I

Part II

Y

N

Regulatory

conformity

RR 11.31

Technical

conformity

RR 11.34

Y

Y

Part III

N

N

Recorded in

MIFR

Returned

Acknowledgment

Finding:

unfavorable

X/RR11.31

Finding: unfavorable

X/RR11.34

Page 7: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

7

Content of the BR IFIC The BR International Frequency information Circular (BR IFIC)

is published once every two weeks by the Radiocommunication Bureau (BR), pursuant to the Radio Regulations (Nos. 20.1 to 20.6 and No. 20.15).

MIFR: notices submitted and/or recorded under Article 11 Part I: Acknowledgement of receipt Part II: Recording in the MIFR Part III: Return to the Administrations or suppressions

Plans: International agreements: AP 25, 26 et 27. Regional agreements:

LF/MF BC: GE75, RJ81, RJ88; VHF/UHF: ST61, GE84, GE89, GE06; Maritime/aeronautical: GE85M, GE85N.

Publication of Special Sections in the BRIFIC: Part A: proposed modifications to the Plans Part B: Recording of the Plan modifications Part C: assignments/allotments suppressed or canceled

Tools: TerRaQ, TerRanotices, TerRaNV

Page 8: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

TerRaQ TerRaQ is the generalized query program for TerRaSys.

It is intended to satisfy the needs for the common queries against TerRaBase

TerRaQ can be used for querying the BR IFIC DVD-TerRaBase: Display, printing and exporting data. Follow-up of submissions and notifications Follow-up of the modifications that can affect own

assignments

Page 9: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Notifying and affected administrations

9

The name of your Administration is listed

if considered as affected

The name of your Adminsitration is listed

if your Administration has submitted or

notifyied

Page 10: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Run a query

10

Selection of recorded or In-Process

notices

Selection of the concerned part

Page 11: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Results screen

11

Page 12: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

TerRaNotices

Data Capture & Validation of Notices

Interaction with TerRaBase:

Generate notices from the assignments/allotments/notices already in the database.

Decision aid: help administrations determine which notice type to use.

12

Page 13: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Choice of a notice form

13

Page 14: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

GE06 Tools

GE06Calc: Conformity examination : standalone software,

download from http://www.itu.int/ITU-R/terrestrial/broadcast/software/ge06calc/index.html .is used to:

run conformity examination in case of conversion of an allotment into assignments.

read the results file created through the use of the ‘compatibility analysis tool’ of the Web application eBCD.

Web application eBCD:

eTools (GE06): SRTM3– Calculation of effective antenna heights

Coordination examination

Compatibility analysis

Propagation prediction model P1812

ePUB - Special Sections and MIFR broadcasting publications

eQry – Query on Broadcasting data

MyAdmin: Portal for individual Administration providing information on broadcasting assignments and results of requested studies.

14

Page 15: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

GE06 Calc

15

Page 16: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

GE06 Conformity examination

16

The red points are the points where the

interference envelope exceeded

Page 17: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

GE06Calc- Results of compatibility analysis

17

Results criteria

Page 18: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

eBCD

18

Page 19: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

eTools

19

Page 20: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

eBCD- Coordination examination

20

Page 21: Presentation on GE06 procedures and Tools - ITU · Presentation on GE06 procedures and Tools Mrs Ilham GHAZI Radiocommunation Engineer- Terrestrial Dept. Regional conference on Digital

Regional conference on Digital Switchover Belgrade, 22 November 2011

Thank you for your attention

[email protected]