Aurélien VANDEKERCKHOVEINGÉNIEUR R&D, HAEMERS© TECHNOLOGIES
Case study
Le traitement thermique in situ - le chantier DONG (Danemark)
haemers-technologies.com19 mars 2017
Presentation of Dong Project
06-03-17
Ing. Aurélien VANDEKERCKHOVEWe restore the value of your Property
9 mars 2017
Chlorinated Solvent
Chlorinated Solvent
Chemical Intermediaries
Extraction Liquids
Degreasers
Dry cleaning/ treatment
surface
PollutionRepeated use
Spills/leaks
Chlorinated Solvent
Chemical Intermediaries
Extraction Liquids
Degreasers
Dry cleaning/ treatment
surface
Spills/leaks
haemers-technologies.com39 mars 2017
Localisation of Dong Project
Hammersholt Byvej 51, 3450 Alleröd, Denmark
Dong site
Ref : http://google.be/maps/denmark Ref : https://www.google.be/maps/@55.8849891,12.33 85279,161m/data=!3m1!1e3
haemers-technologies.com49 mars 2017
Determination of the Target Zone
Sampling Mapping of the contamination
TZ
haemers-technologies.com59 mars 2017
Contaminant of Concern
Contaminant Cl
ClCl
Cl
Cl
ClCl
H
Trichloroethylene - TCE
Perchloroethylene - PCE
Hydrocarbons
haemers-technologies.com69 mars 2017
Target Zone
Dong Energy site-before treatment
High Voltage Transformer
High tension cables
Treatment Zone
haemers-technologies.com79 mars 2017
Decontamination of Dong Site
Geo Company : Consultant of Dong
Pump & Treat System
Weak Solubility of TCE & PCE
Source of pollutantinto the soil
In-Situ Thermal DesorptionARKIL & HT
haemers-technologies.com89 mars 2017
ISTD treatment
Characteristics of the Target Zone
Polluted Soil Surface (area) - m² 36
Upper Treatment Depth - m 1
Lower Treatment Depth - m 9
Volume - m³ 288
Mass - tons 524
Groundwater Depth - m 9.2
Contaminant of Concern Chlorinated solvents
Maximal Concentration of chlorinated solvent – mg/kg
0,38
Minimal concentration of chlorinated solvent into the soil –mg/kg
0,17
haemers-technologies.com99 mars 2017
Design of ISTD treatment
Heating tubes - 15
Perforated tubes - 24
haemers-technologies.com109 mars 2017
Mounting of ISTD treatment
haemers-technologies.com119 mars 2017
Mounting of ISTD - Drilling
haemers-technologies.com12
Mounting of ISTD treatment
haemers-technologies.com139 mars 2017
Mounting of ISTD - Excavation
Excavation of the first meter of non pollutated soil
To protect high voltage cablescrossing the target zone
No pollution before 1 m bgl
haemers-technologies.com149 mars 2017
Mounting of ISTD – Concrete Slab
Pouring of a concrete slab of 100 mm To avoid fugitive emissions
haemers-technologies.com159 mars 2017
Mounting of ISTD - Burners
haemers-technologies.com169 mars 2017
Mounting of ISTD - Exhausted and gas lines
haemers-technologies.com179 mars 2017
Mounting of ISTD – Insulation
Rockwool 75 mm of thickness
haemers-technologies.com189 mars 2017
Mounting of ISTD - Recovering of Product
Knock-out box
HeatingExchanger
Condensable gases
Non-condensable gases
Reinjected intothe burner
Treated by Geo
Heating of soilEvaporating of all contaminant
of concern
Aspiration by vapour tubes
haemers-technologies.com199 mars 2017
Mounting of ISTD – Recovering of products
Knock-out boxHeating Exchanger +
pump extraction
haemers-technologies.com209 mars 2017
Treatment Follow-up
Follow-up
Pressure intothe soil
Temperature
RecoveredProduct
concentrations
Target temperature at 70°C
𝐶𝑃𝐶𝐸 = 7μ𝑔
𝑙
𝐶𝑇𝐶𝐸 = 7μ𝑔
𝑙
Under below pressure
𝐶𝑃𝐶𝐸 = 4700μ𝑔
𝑚³
𝐶𝑇𝐶𝐸 = 2600μ𝑔
𝑚³
haemers-technologies.com219 mars 2017
Treatment Follow-up
Monitoring of temperature into the soil
haemers-technologies.com229 mars 2017
Treatment Follow-up
Collected
vapour from
perforated
tubes
Before starting,
Air concentration
into the soil
After 2
weeks
After 4
weeks
After 6
weeks
Stop criteria of
concentration
into the soil
TCE [µg/m³] 356.500 1,200 390 9,5 2.600
PCE [µg/m³] 262.700 110 45 7,3 4.700
Collected
water
Before start
GW in source
After 2 weeks After 4 weeks After 6 weeks Stop criteria
GW in plume
and source
TCE [µg/l] 340 1.5 0.95 0.57 7
PCE [µg/l] 11 0.092 0.057 0.077 7
Almost no contaminant left into the soil after 34 days of treatment
haemers-technologies.com239 mars 2017
Thank you for your time