Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee...
Transcript of Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee...
![Page 1: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/1.jpg)
1
Presentation for CMEQ Committee – June 26, 2017
![Page 2: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/2.jpg)
INTRODUCTION
2
• The Problem• The Express Lane Option• The Project Specifics• The Environmental Process• What’s ahead
![Page 3: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/3.jpg)
3
BIG PICTURE
• The Caltrain Electrification Project will not fully address projected demand
• SAMTRANS is studying express bus service on the 101 corridor• VTA is in final design to create a 2+ HOV Express Lanes from
south of 85 to the San Mateo County line• SFCTA is studying an extension of the 101 managed lanes into
San Francisco• MTC is planning to improve and increase Park and Ride lots• Municipalities implementing TDM measures
The problem is greater than one project can solve.
![Page 4: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/4.jpg)
4
THE PROBLEM
• Jobs, housing and population growth continue
• Vehicle trips to grow 4-7% by 2020
• No incentive to share a ride
• Cars avoid the freeway
The congestion on 101 has been bad and will continue to get worse.
![Page 5: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/5.jpg)
5
THE BACKUPS
![Page 6: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/6.jpg)
6
101 Southbound AM HOVs
![Page 7: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/7.jpg)
7
101 Northbound AM HOVs
![Page 8: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/8.jpg)
8
101 Southbound AM RAMPS
![Page 9: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/9.jpg)
9
101 Northbound AM RAMPS
![Page 10: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/10.jpg)
10
CROSS CONNECTOR TRAFFIC
![Page 11: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/11.jpg)
11
EL CAMINO TRAFFIC
![Page 12: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/12.jpg)
12
THE CHALLENGE OVERALL
• Find a solution quickly• Secure public and political support of the Project• Secure the required funding• Minimize environmental impacts• Stay within the current Right of Way as much as
possible• Don’t make congestion worse in the other lanes• Reduce commute trips on the local street network• Build the project as soon as possible
![Page 13: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/13.jpg)
HOW AN EXPRESS LANE OPERATES
13
![Page 14: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/14.jpg)
TOLLING SIGN
14
![Page 15: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/15.jpg)
15
HOW A TOLL IS PAID
![Page 16: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/16.jpg)
16
IMPACT OF EXPRESS LANES
62
40
56
69
49
26
26
59
0 20 40 60
I-95 Miami
I-110 LA
I-10 LA
I-680 Sunol
AM Travel Speed (mph)
General Purpose AM Express AM
57
61
55
70
43
37
32
65
0 20 40 60
I-95 Miami
I-110 LA
I-10 LA
I-680 Sunol
PM Travel Speed (mph)
General Purpose PM Express PM
EXPRESS LANE ADVANTAGE
![Page 17: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/17.jpg)
17
IMPACT OF EXPRESS LANES
HOV/EXPRESS LANE IMPROVEMENT
19
15.1
11.3
12.4
16
11.8
0 5 10 15 20
I-110 LA
I-10 LA
I-680 Sunol
AM Travel Time (min)
AM Before AM After
11
15
11.1
10.8
18.1
11.3
0 5 10 15 20
I-110 LA
I-10 LA
I-680 Sunol
PM Travel Time (min)
PM Before PM After
20
40 60
0
803 mph
20
40 60
0
803 mph
20
40 60
0
8016 mph
20
40 60
0
801 mph
20
40 60
0
809 mph
2040 60
0
801 mph
AM Speed PM Speed
![Page 18: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/18.jpg)
18
INTEGRATED PROJECT TEAM
Co-Sponsor Agencies
Integrated Project Delivery Team
Environmental Lead Agency
![Page 19: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/19.jpg)
19
THE PROJECT LIMITS
![Page 20: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/20.jpg)
20
PROJECT PURPOSE
• Reduce congestion in the corridor• Encourage carpooling and transit use• Provide managed lanes for travel-time reliability• Minimize operational degradation of the general
purpose lanes• Increase person throughput• Apply technology and/or design features to help
manage traffic
![Page 21: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/21.jpg)
21
THE ALTERNATIVES
• Alternative 1: No project
• Alternative 2: Modify existing auxiliary lanes to make a new through lane from Whipple Avenue to I-380; convert median lane to an HOV lane for HOV 2+
• Alternative 3: Convert the existing median lane to an HOV 3+ Express Lane
• Alternative 4: Modify existing auxiliary lanes to make a new through lane from Whipple Avenue to l-380; convert median lane to an HOV 3+ Express Lane
THE
ALT
ER
NAT
IVE
S
![Page 22: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/22.jpg)
22
PRELIMINARY DESIGN CONSIDERATIONS
• Auxiliary lane replacement – Removal of Aux lanes sometimes impacts local street circulation and needs to be replaced to prevent negative impacts.
• Right of Way – In replacing Aux lanes, the team is minimizing right of way impacts by utilizing design exceptions, shifting alignments, and working with cities.
• Environmentally sensitive areas – The team identifies sensitive areas early and is working to reduce impacts.
• Relocation of existing sound walls – Design team is working with impacted Cities to minimize issues associated with sound walls.
![Page 23: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/23.jpg)
23
LANE CONFIGURATION A
Existing Conditions / No Build
![Page 24: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/24.jpg)
24
LANE CONFIGURATION B
Merged Lane in Converted No. 1 Lane
![Page 25: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/25.jpg)
25
LANE CONFIGURATION C
Managed Lane with Converted Auxiliary Lanes
![Page 26: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/26.jpg)
26
LANE CONFIGURATION D
Managed Lane with Converted Auxiliary Lanes and Auxiliary Lane Replaced
![Page 27: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/27.jpg)
27
AERIAL VIEW OF LANE SHIFT
![Page 28: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/28.jpg)
28
CHALLENGES WITH THE ALTERNATIVES
• Alternative 2: There is currently a high volume of 2-person carpools (HOVs) along with Clean Air Vehicles and HOV violators
• Alternative 3: There is no additional capacity to accommodate growth, so it is estimated to only work if a significant amount of people change their travel behavior.
• Alternative 4: Transitions into and out of the Santa Clara and San Francisco facilities must be carefully coordinated with VTA and SFCTA.
CHAL
LEN
GES
WIT
H TH
E AL
TERN
ATIV
ES
![Page 29: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/29.jpg)
29
TECHNICAL STUDIES
ENVIRONMENTAL STATION
![Page 30: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/30.jpg)
30
KEY SELECTION CRITERIAKE
Y SE
LECT
ION
CRI
TERI
A • Vehicle hours of delay: How many hours each car sits in traffic
• Change in travel times: How long it takes to get from point A to point B
• Person throughput: How many people can we move through point A on the way to point B
• Vehicle miles travelled: How many miles a vehicle travels in a specific time period (could mean reduced vehicle travel or could also mean gridlock)
![Page 31: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/31.jpg)
31
FUNDING & COORDINATION
• $11.5m for Environmental Clearance – This funding is secured (SMCTA, SAMCEDA)
• $9.5m for Preliminary Design– Partially funded to start the early stage of the design phase (Federal Earmark).
• Funding to complete Design and go to Construction is not secured.
• Continued coordination with SAMTRANS, Caltrainand cities
![Page 32: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/32.jpg)
32
FUTURE POLICY CONSIDERATIONS
• Which agency will operate these lanes?• Should this lane open as a 2+ HOV or 3+ HOV Express
Lane?• If it opens as a 3+ HOV Express should 2-person HOVs
get a discount?• What should be the hours of tolling? • Tolling generally changes based on congestion. What
should be the frequency and increment of change?• How should excess (revenue beyond operations and
maintenance cost) revenue be directed?
The following policy questions have to be answered in the future.
![Page 33: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/33.jpg)
33
PUBLIC ENGAGEMENT SCHEDULE
Scoping Meeting
Two Community Meetings
Public Comment Period
Environmental Clearance
October 2016 Late Spring 2017 January 2018 Fall 2018OUTREACH SCHEDULE
![Page 34: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/34.jpg)
34
www.dot.ca.gov/d4/101managedlanes
![Page 35: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/35.jpg)
35
IMPACT OF EXPRESS LANES
11
19
15.1
11.3
19
30.4
33.9
13.3
0 10 20 30
SR 167 Seattle
I-110 LA
I-10 LA
I-680 Sunol
AM Travel Time (min)
General Purpose AM Express AM
8
11
15
11.1
13
18.9
26.2
12.1
0 10 20 30
SR 167 Seattle
I-110 LA
I-10 LA
I-680 Sunol
PM Travel Time (min)
General Purpose PM Express PM
EXPRESS LANE ADVANTAGE
![Page 36: Presentation for CMEQ Committee – June 26, 2017 · 2017-06-27 · Presentation for CMEQ Committee – June 26, 2017. INTRODUCTION 2 ... • VTA is in final design to create a 2+](https://reader034.fdocuments.us/reader034/viewer/2022050409/5f86a41225f3061e382363f1/html5/thumbnails/36.jpg)
36
IMPACT OF EXPRESS LANES
GENERAL PURPOSE LANE IMPROVEMENT
30.4
33.9
13.3
27.1
29
15.3
0 10 20 30
I-110 LA
I-10 LA
I-680 Sunol
AM Travel Time (min)
AM Before AM After
18.9
26.2
12.1
20.1
34.6
12.3
0 10 20 30
I-110 LA
I-10 LA
I-680 Sunol
PM Travel Time (min)
PM Before PM After
20
40 60
0
806 mph
20
40 60
0
806 mph
20
40 60
0
804 mph
20
40 60
0
802 mph
20
40 60
0
804 mph
2040 60
0
800 mph
AM Speed PM Speed