Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.
-
Upload
grant-lewis -
Category
Documents
-
view
216 -
download
0
Transcript of Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.
![Page 1: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/1.jpg)
Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007
![Page 2: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/2.jpg)
Environment
• In 2000 the university recognised that it could not rely on federal funding other than for operational funding and that it had to look to self-fund its own facilities.
Fundraising was critical to self-funding
![Page 3: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/3.jpg)
Aim to raise $1.5billion 00/07
• Raised $ 1.9billion
• In US 62 universities have endowments exceeding $1billion
• Harvard $35 billion
• In 2007 in US endowments rose by 17%
![Page 4: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/4.jpg)
Key issues
• Clear vision focus
• Need to communicate vision
• Ensuring university played a key role in region
• Need for a more planned approach to activity – 70 people full time– Led from $100m to $250m pa
![Page 5: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/5.jpg)
The Campus Master Plan is:
a dynamic document that guides the orderly growth and attractive development of the university’s physical facilities and helps to establish a sense of place and community.
![Page 6: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/6.jpg)
2000 - 2009
• 00/07 28 buildings completed $800m
• 07 5 under construction
• 07/09 10 buildings planned
Every building named
![Page 7: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/7.jpg)
1) Spurgeon Golf Training Facility2) Aquaculture (not on map)3) Beck Center (not on map)4) Schwartz Tennis Center5) Ross-Ade Stadium Renovation6) Ford Dining Court7) Armstrong Hall of Engineering8) Satellite Chiller Plant9) Forney Hall (Chemical Engineering Addition)10) Lawson Computer Science Building11) McCutcheon Drive Parking Garage Addition12) Windsor Dining Court 13) Burton Morgan Center14) Pfendler Hall15) Rawls Hall16) Birck Nanotechnology Center 17) Bindley Bioscience Center 18) Mann Hall19) Jischke Hall of Biomedical Engineering 20) Yue-Kong Pao Hall of Visual and Performing Arts (Ph 1 & 2)21) Dauch Alumni Center22) Fleschauer Radiation Therapy Facility23) Vet Med Isolation Facility24) Equine Health Science Annex25) Printing Services Replacement26) Bowen Laboratory (not on map)
27) Wiley Dining Court28) Replacement Student Housing29) Purdue Village Community Center30) Patty Jischke Early Care and Education Center31) Hockmeyer Hall of Structural Biology
32) Mackey Arena Addition33) Mechanical Engineering Addition34) Hanley Hall - Human Development Institute35) Marriott Hall - Hospitality and Tourism Management36) Herrick Laboratory (Replacement37) Electrical and Computer Engineering38) Discovery Learning Center39) Animal Disease Diagnostic Lab (BSL 3)40) Aviation Technology Addition41) Grounds Services Building (Replacement)
Construction 2001-2009
COMPLETED SINCE 2003
UNDER CONSTRUCTION
2007-2009
.
Completed
Total: $468,787,000
GSF: 2,263700
Under Construction
Total: $86,620,000
GSF: 404,9300
2007-2009: Total: $238,775,000
GSF: 547,900
![Page 8: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/8.jpg)
Existing Pedestrian Travel Distances
LEGEND5 Minute
10 Minute
Distance/Time4’/Second240’/Minute1,200’/5 Min.2,400’/10 Min.
![Page 9: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/9.jpg)
Stadium Area
Fred & Mary Ford Dining CourtBudget: $16,335,000 GSF: 63,290
Ross-Ade StadiumBudget: $70,000,000 GSF: 291,500
Boilermaker Sculpture
Tom Spurgeon Golf Training CenterBudget: $2,700,000 GSF: 11,900
![Page 10: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/10.jpg)
Proposed Mackey Arena Addition/RenovationBudget: $70,000,000 GSF: 96,000
Completion: 2011
![Page 11: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/11.jpg)
North Academic Campus
Forney Hall AdditionBudget: $19,500,00 GSF: 92,300
Lawson Computer Science BuildingBudget: $20,000,000 GSF: 108,000
![Page 12: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/12.jpg)
Neil Armstrong Hall of EngineeringBudget: $53, 187,000 GSF: 210,236
Completion: June 2007
![Page 13: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/13.jpg)
Neil Armstrong Hall of EngineeringBudget: $53,187,000 GSF: 210,326
Completion: June 2007
![Page 14: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/14.jpg)
Marriott Hall Hospitality & Tourism Management Building
Budget: $12,000,000 GSF: 25,000Completion: TBD
![Page 15: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/15.jpg)
South Academic Campus
Dauch Alumni CenterBudget: $16,000,000 GSF: 69,400
Pfendler HallBudget: $14,500,000 GSF: 60,100
Rawls HallBudget: $28,600,000 GSF: 121,200
Pao Hall – Phases I & IIBudget: $46,200,000 GSF:
198,900
![Page 16: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/16.jpg)
Classes of 1956 and 1957 PlazaCompletion: June 2006
![Page 17: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/17.jpg)
Discovery Park
![Page 18: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/18.jpg)
Bindley Bioscience CenterBudget: $15,000,000 GSF: 55,500
Jischke Hall of Biomedical EngineeringBudget: $25,000,000 GSF: 92,893
Morgan Center for EntrepreneurshipBudget: $7,000,000 GSF: 31,000
Gerald D & Edna E. Mann HallBudget: $12,400,000 GSF: 49,632
Birck Nanotechnology Center
Budget: $58,300,000 GSF: 219,700
![Page 19: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/19.jpg)
Discovery Learning CenterBudget: $25,000,000 GSF: 86,000
Completion: October 2009
Wayne T. & Mary T. Hockmeyer Hall of Structural Biology
Budget: $30,000,000 GSF: 63,680Completion: December 2009
![Page 20: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/20.jpg)
Satellite Chiller Plant
Budget: $4,750,000 GSF: 26,300
Windsor Halls Dining Court
Budget: $12,400,000 GSF: 30,900West Campus Area
![Page 21: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/21.jpg)
McCutcheon Drive Parking Garage AdditionBudget: $16,712,000 GSF: 341,000 (1,000 spaces)
Completion: October 2007
![Page 22: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/22.jpg)
Hanley Hall Human Development Institute
Budget: 10,000,000 GSF: 60,000Completion: May 2009
![Page 23: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/23.jpg)
Wiley Dining CourtBudget: $19, 800,000 GSF: 75,500
Completion: August 2008
![Page 24: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/24.jpg)
Closer to Home!
• Quinn School Business School
• Smurfit Business School
• Naughton Nanotechnology Centre
• O’ Reilly Hall ….
![Page 25: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/25.jpg)
![Page 26: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/26.jpg)
Philanthropy Stakeholders
Faculties & Schools
President
GrangegormanProject Team
DIT Foundation DONORS
GraduateNetwork
![Page 27: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/27.jpg)
DIT Target €70
Your Support is central!
John & Siobhan will facilitate, coordinate and assist but Faculty, School, Dept, Staff member & Alumni are key to success
![Page 28: Presentation by on visit to Purdue University by John Corrigan & Noel O’Connor In October 2007.](https://reader036.fdocuments.us/reader036/viewer/2022062423/5697c0021a28abf838cc328d/html5/thumbnails/28.jpg)
And Finally
The Renaissance Campaign reflects the re-launch of DIT. Now we need your support as an internal
stakeholder to embrace the campaign.
Any comments would be welcome to [email protected]
or [email protected] Friday 21 December