PROJECT SEMESTER PROJECT SEMESTER JUNE-DECEMBER 2007 JUNE-DECEMBER 2007 BY GURSHARAN SINGH BY GURSHARAN SINGH 1055202 1055202

Transcript of Presentation by gursharan singh for engineeringcivil.com

PROJECT SEMESTERPROJECT SEMESTERJUNE-DECEMBER 2007JUNE-DECEMBER 2007

BY GURSHARAN SINGHBY GURSHARAN SINGH

10552021055202

ERA BUILDING SYSTEMS LTD., NOIDA

PRE ENGINEEREDSTEEL BUILDINGS

Concept , Design &

Construction

ERA Group ERA Group

Era Infra Engineering Ltd.Era Infra Engineering Ltd.

Era Building System Ltd.Era Building System Ltd.

Era E-Zone (India) Ltd.Era E-Zone (India) Ltd.

Era Landmarks (India) Ltd.Era Landmarks (India) Ltd.

PRE ENGINEERED BUILDINGSPRE ENGINEERED BUILDINGS Tailor made building based on

client’s requirement & actual design calculations using tapered sections.

A combination of built up section, hot rolled section, cold formed elements and profiled sheets

Designing and casting is done in factory

Building components are brought to site

Then fixed/jointed at the site All connections are bolted.

Steel was very expensive item in USASteel was very expensive item in USA The concept of PEB originate from here.The concept of PEB originate from here. The idea was that section should be provided as per The idea was that section should be provided as per

B.M.D.B.M.D. This lead to the saving in steel and development of This lead to the saving in steel and development of

PEB concept.PEB concept.

BRIEF HISTORYBRIEF HISTORY

APPLICATIONSAPPLICATIONS Industrial BuildingsIndustrial Buildings WarehousesWarehouses Commercial ComplexesCommercial Complexes ShowroomsShowrooms OfficesOffices SchoolsSchools Indoor StadiumsIndoor Stadiums Outdoor Stadiums with canopiesOutdoor Stadiums with canopies Gas StationsGas Stations Metro Stations, Bus Terminals, Parking LotsMetro Stations, Bus Terminals, Parking Lots Primary Health Centers, Angan wadi’sPrimary Health Centers, Angan wadi’s And many more…And many more…

P E BP E B

CONT….CONT….

Industrial BuildingIndustrial Building

P E BP E B

Parking lotsParking lots

Indoor StadiumsIndoor Stadiums

Railway StationRailway Station

Aircraft HangarsAircraft HangarsP E BP E B

Metro StationMetro Station

Wear houseWear house High rise BuildingHigh rise Building

ADVANTAGESADVANTAGES

Aesthetic AppealAesthetic Appeal Faster CompletionFaster Completion EconomicalEconomical Seismic ResistanceSeismic Resistance Ease of ExpansionEase of Expansion Maintenance FreeMaintenance Free Large Clear SpansLarge Clear Spans Controlled QualityControlled Quality Hassle FreeHassle Free

P E BP E B

Self weight Self weight 30% lighter30% lighter Primary Member is Primary Member is

tapered sectiontapered section Secondary members Secondary members

are light weight rolled are light weight rolled framed “Z” and “C” framed “Z” and “C”

sectionsection

Self weightSelf weight More heavyMore heavy Primary members Primary members

are Hot rolled “I” are Hot rolled “I” sectionsection

Secondary Secondary members are “I” or members are “I” or “C” section which “C” section which are heavy in weight.are heavy in weight.

Delivery – average 6 Delivery – average 6 to 8 weeksto 8 weeks

Foundation-simple Foundation-simple design, easy to design, easy to construct & light wt.construct & light wt.

Erection cost and time- Erection cost and time- accurately knownaccurately known

Erection process is Erection process is easy, fast, step by easy, fast, step by stepstep

Delivery- average 20 Delivery- average 20 to 26 weeksto 26 weeks

Foundation- expensive, Foundation- expensive, heavy foundation heavy foundation required.required.

Erection cost and time- Erection cost and time- 20% more than PEB20% more than PEB

Erection process is Erection process is slow and extensive slow and extensive field labor is required.field labor is required.

Seismic Resistance- Seismic Resistance- low weight flexible low weight flexible frames offer higher frames offer higher resistance to seismic resistance to seismic forcesforces

Overall price -Overall price -30%lower30%lower

architecture-achieved architecture-achieved at low castat low cast

Seismic Resistance- Seismic Resistance- rigid heavy weight rigid heavy weight structures do not structures do not perform well in perform well in seismic zonesseismic zones

Overall price - Higher Overall price - Higher Price per square Price per square meter.meter.

Architecture- achieved Architecture- achieved at higher costat higher cost

COMPONENTSCOMPONENTS

Main FrameMain Frame Primary Primary

MembersMembers ColumnsColumns RaftersRafters

Secondary Secondary MembersMembers PurlinsPurlins GirtsGirts

P E BP E B

SheetingSheeting RoofRoof WallWall Fascias etcFascias etc

AccessoriesAccessories VentilatorsVentilators Sky LightsSky Lights Misc.Misc.

OTHER MAJOR COMPONENTS OF PEB

CRANE BRACKETS & BEAMS

MEZZANINE FLOORS

STRUCTURAL PARTIONS

FASCIAS CANOPIES

Work done Work done

Detail Detail Literatrue studyLiteratrue study Optimaztion of frameOptimaztion of frame J-286, Thermax Limited at VadodaraJ-286, Thermax Limited at Vadodara J-327, Sub Station L & T SuratJ-327, Sub Station L & T Surat J-275-302 Hazira, SuratJ-275-302 Hazira, Surat J-273 L & T Talegaon, Pune.J-273 L & T Talegaon, Pune. Plant VisitPlant Visit Site VisitSite Visit

DESIGN ISSUESDESIGN ISSUES

STRUCTURAL PLANNINGSTRUCTURAL PLANNING FRAME CONFIGURATIONSFRAME CONFIGURATIONS TYPES OF LOADS & ASSESSMENTTYPES OF LOADS & ASSESSMENT END CONDITIONSEND CONDITIONS CRANESCRANES MEZANINESMEZANINES LOAD COMBINATIONSLOAD COMBINATIONS

Load 1X

YZ

PRE-ENGINEERED BUILDINGS NOMENCLATURE PRE-ENGINEERED BUILDINGS NOMENCLATURE

– STANDARD FRAMING SYSTEMS– STANDARD FRAMING SYSTEMS

TCCS = TAPERED COLUMN CLEAR SPAN

Load 1X

YZ

TCMS-1 TAPERED COLUMN MULTI-SPAN WITH 1 INTERMEDIATE COLUMN.

Load 1X

YZ

SSCS = SINGLE SLOPE CLEAR SPAN.

Load 1X

YZ

SSMS-1= SINGLE SLOPE MULTI-SPAN WITH 1 INTERMEDIATE COLUMN

GUIDELINES FOR PEB DESIGN AT PROPOSAL STAGE

ALL DESIGNS SHALL BE AS PER MBMA AMERICAN STANDARDS UNLESS CLIENT SPECIFIES AS PER IS CODE

LIVE LOAD AS PER AMERICAN CODE = 0.57 KN/M^2  AND AS PER IS CODE = 0.75 KN/M^2. (REDUCTION IN LIVE LOAD TO BE INCORPORATED FOR BUILDINGS HAVING HIGHER SLOPES)

AS PER AMERICAN CODE :HORIZONTAL DEFLECTION = L/180 & VERTICAL DEFLECTION=Eh/100 FOR MAIN FRAMES.

WIND TERRAIN CATEGORY 3 IS TO BE SELECTED UNLESS MORE DATA IS AVAILABLE.

CONTD……

IN AMERICAN DESIGN , WIND COEFFICIENTS TO BE FOLLOWED AS GIVEN IN MBMA.

IN IS DESIGN, INTERNAL & EXTERNAL BUILDING WIND COEFFICIENTS AS PER IS -875 (PART-3).

GENERALLY BUILDINGS ARE TO BE DESIGNED AS PINNED EXCEPT FOR BUILDING SPAN >30M OR CRANE CAPACITY OF MORE THAN 5 TONS OR HEIGHT GREATER THAN 9 M

STANDARD PURLIN LAPS SHOULD BE 385 mm

Optimisation of frameOptimisation of frame Basic FrameBasic Frame• Width of the frame = 20 mWidth of the frame = 20 m• Height of the frame = 6 mHeight of the frame = 6 m• Length of the frame = 70 mLength of the frame = 70 m• Bay spacing l = 7 mBay spacing l = 7 m• Slop of roof i= 1:10Slop of roof i= 1:10• Wind speed v = 43 m/sWind speed v = 43 m/s• Seismic zone = 4Seismic zone = 4

Varying of Width of Frame

Only Primary Frame Design Purline 250 X 2.5 mm2

Spacing-1.57.67 kg/m

Design Girt 200X1.75 mm2

Spacing-1.5

6.09 kg/m

Varying Height and width

Design Purline 250 X 2.5 mm2

Spacing-1.57.67 kg/mSpacing-1.5

Design Girt 250X2.0 mm2

Spacing-1.56.09 kg/mSpacing-1.5

Only Primary Frame

Varying Bay length with Height Heigth-6 Heigth-8 Heigth-9

Purline Girt Purline Girt Purline Girt6 Z 200X1.75

Spacing-1.5Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

7 Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

8 Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

9 C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

10 C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

Total weight of Frame, Purline and Girt

Varying bay length with widthHeigth-6 Heigth-8 Heigth-9

Purline Girt Purline Girt Purline Girt6 Z 200X1.75

Spacing-1.5Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200X1.75Spacing-1.5

7 Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

Z 250X 2.0Spacing-1.5

Z 250X1.75Spacing-1.35

8 Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

9 C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

C250 X 2.5Spacing-1.4

C 250 X 2.5Spacing-1.35

10 C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

C 250 X 2.5Spacing-1.0

Total weight of Frame, Purline and Girt

Varying wind speed with width wind Width-20m Width-35speed Purline Girt Purline Girt

33 Z 200 X 1.75Spacing-1.5

Z 200X1.75Spacing-1.5

Z 200 X 1.75Spacing-1.5

Z 200X1.75Spacing-1.5

39 Z 200 X 2.0Spacing-1.5

Z 200X2.0Spacing-1.5

Z 200 X 2.0Spacing-1.5

Z 200X2.0Spacing-1.5

43 Z 250 X 2Spacing-1.5

Z 250X2.0Spacing-1.4

Z 250 X 2Spacing-1.5

Z 250X2.0Spacing-1.4

47 Z 250 X 2.5Spacing-1.5

Z 250X2.0Spacing-1.45

Z 250 X 2.5Spacing-1.5

Z 250X2.0Spacing-1.45

50 Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

Z 250 X 2.5Spacing-1.5

55 C 250 X 2.5Spacing-1.35

C 250 X 2.5Spacing-1.5

C 250 X 2.5Spacing-1.35

C 250 X 2.5Spacing-1.5

Total weight of Frame, Purline and Girt

Steps of DesignSteps of Design Wind load calculationWind load calculation Purline DesignPurline Design Girt DesignGirt Design Design of Main FrameDesign of Main Frame Base PlateBase Plate Anchor Bolt design for Moment ConditionAnchor Bolt design for Moment Condition Anchor Bolt design for Shear ConditionAnchor Bolt design for Shear Condition Gable column designGable column design Design of connection plateDesign of connection plate Cranes DesignCranes Design

J-268 Thermax LimitedJ-268 Thermax Limited

VadodaraVadodara

Full PlanFull Plan

Plan of Phase 1Plan of Phase 1

Frame X-sectionFrame X-section

Wind load calculation

PURLIN

Base plate

Plant visit at

Pant Nagar

PROCESSESPROCESSES

PEB

BUILT UP LINE COLD FORM LINE SHEETING

PRIMARY MEMBERS

CKD

C & Z PURLINS LINE

HR SECTIONS &

MISCELLANEOUS PARTS

ROOF & WALL SHEETING

GUTTER, FLASHINGS, TRIMS, ETC

CKD CKD CKD ACCESSORIES

SHIPMENT

P E BP E B

Site visit at

PANT NAGAR

ERECTION SYSTEMERECTION SYSTEM

UNDERSTANDING THE UNDERSTANDING THE ENGINEERING DOCUMENTS.ENGINEERING DOCUMENTS.

1.1. Anchor Bolt Setting PlanAnchor Bolt Setting Plan

2.2. Cross sectionCross section

3.3. Roof framing planRoof framing plan

4.4. Roof sheeting & framingRoof sheeting & framing

5.5. Sidewall sheeting & framingSidewall sheeting & framing

6.6. Other drawingsOther drawings

7.7. Bill of materialsBill of materials

CONTD…CONTD…

Preparation for ErectionPreparation for Erection1.1. Pre Erection checksPre Erection checks2.2. Receiving Materials at siteReceiving Materials at site3.3. Unloading ContainersUnloading Containers

Erection of the FramingErection of the Framing1.1. Preparation of the First BayPreparation of the First Bay2.2. Main framesMain frames3.3. Mezzanine floorsMezzanine floors4.4. Crane BeamsCrane Beams

CONTD….CONTD….

Sheeting & TrimmingSheeting & Trimming Sheeting preparationSheeting preparation Sheeting the wallsSheeting the walls Sheeting the roofsSheeting the roofs Miscellaneous trimmingsMiscellaneous trimmings FasciaFascia