Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical...
-
Upload
emmeline-annabelle-ball -
Category
Documents
-
view
213 -
download
0
Transcript of Presentation By Balraj Bhanot Chairman TEDC(BIS) & Adviser IDTR Former Chairman CMVR – Technical...
Presentation
By
Balraj Bhanot
Chairman TEDC(BIS) & Adviser IDTR
Former Chairman CMVR – Technical Standing Committee (MoRT&H)
& Director ARAI & DDG (HEAVY INDUSTRY)
20.11.2006
•Inspection and Certification
Proposal for Effective Inspection and Certification Regime
• Dovetail the present PUC system with I/C centres
• Develop loaded mode emission test methods in the long run
• Use technologies like Remote Sensing Device (RSD) as a supplement tool to identify gross polluting vehicles
• Change Pass/fail cut off points dynamically
• Involve general public in identifying the gross polluting vehicles by sending the SMSs through mobile phones or using the toll free numbers
• Introduce an efficient maintenance system to rectify the vehicles that have failed in the I/C centers
Proposal for Effective Inspection and Certification Regime
• Introduce certification and audit system for repair workshops
• For the quality of the services by the test centers, introduce audit system
• Develop a centralized software which is common to all the I&C centers for data transfer, storage, data analysis, uploading on a web site, etc
• I&C equipment manufacturers and suppliers to train I&C operators
• The validity of the I/C centres should be linked to 5 years AMC
Vehicle Population - Vintage wise
1991-199621%
2000-20018%2001-2002
9%
1971-199133%
1996-200029%
Based on Vehicle Sales Data
Side slip TesterNoise TesterBrake TesterSpeedometer TesterHeadlamp TesterTread depth gauge for TyresRoller Dyno4 gas analyserPC with software
EQUIPMENT REQUIRED
SAFETY
POLLUTION
TYPICAL FACILITY LAYOUT FOR INSPECTION & CERTIFICATION OF IN-USE VEHICLES
Automation of Safety & Emissions test for Fitness Certification (Burari, Delhi)
Data
Noise
Emission
Speedometer
Brakes
Side-slip
Suspension
Joint Play
Headlights
CNG Safety
Automated Vehicle Inspection Unit at Burari, Delhi
1
Automation of Safety & Emissions test for Fitness Certification (Burari, Delhi)
Inauguration of the facility by the Honorable Chief Minister & Honorable Transport Minister of Delhi on 1st July 2005
I&C Center – Burari (Delhi)
Two automated fitness testing lanes with computerised testing equipment:
one for auto rickshaw, taxis, RTVs and vehicle up to 3.5 tons, and
other for buses, trucks and other commercial vehicles
I&C Center – Burari (Delhi) :Observations on Visual Inspection of Vehicles
Speed governor missing & not functioning
Speedometer not present or not functioning
Lambda sensor missing
Extensive exhaust leak
Headlamps not properly focused & also lacks desired intensity
Front/rear indicator either not functioning or covered with grill.
I&C Center – Burari (Delhi) :Observations on Visual Inspection of Vehicles
Parking brake not functioning
Horn not working and fitted with pressure horns – which are not allowed
Only one wiper on driver side
Improper gearbox mounting and gearbox/differential oil leakage.
Warning triangles and reflectors absent
I&C Center – Burari (Delhi) :
Observations on Visual Inspection of Vehicles
Abraded and worn out tyres
Wheel nuts missing
Shock absorber either missing or not properly mounted
Gearbox cover missing
Propeller shaft joints to differential not proper
I&C Center – Burari (Delhi) :
Observations on CNG vehicle visual inspection
Compliance plate missing
Vent pipes missing or not connected
Necessary emergency tools like fire extinguishers & first aid kit missing
Dust caps in the CNG filling valve either missing or nonfunctional
Wiring harness not proper
Visual Inspection
18
36
5155 57
62
70 71
84
90
0
10
20
30
40
50
60
70
80
90
100
4 9 5 10 8 6 3 7 2 1
Fault description
No
of
Ve
hic
les
Total Sample Size 105
1) speed governor2) Lamda sensor3) Exhaust leak4) Horn5) Headlight6) wiper System7)Parking Brakes8) F/R reflectors9) Gear box oil leakage10) speedometer
CNG Checks
02
4 45
78
9
1213 13
1416
17 17
21
24
2829
32
35
40
5051
0
10
20
30
40
50
60
19 1 20 21 2 17 23 4 31 3 34 42 12 13 41 16 35 33 38 26 37 36 40 39
Fault description(for details refer checklist)
No
of
Veh
icle
s Total Sample size: 57
Observations on CNG vehicle inspection
• No compliance plate was observed on CNG vehicles
• Vent pipes were either absent or not connected• Necessary emergency tools like fire
extinguishers & first aid kit were absent on CNG vehicles
• Dust caps in the CNG filling valve were either missing or nonfunctional in few vehicles.
• Wiring harness in CNG vehicles were not proper