Construction of Bridges

Page 2: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 2/74

Materials suitable for the Construction of 

Long-span Bridges

1. Stone – in arch masonry

2. Steel – in girder or box-section constructed in steel

 plates and standard sections

3. Steel – truss constructed of standard sections

4. Reinforced Concrete – in arch or spanned forms5. Tensioned RC – in various forms

6. Precast – mainly in box-section girder 

Page 3: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 3/74

Common Bridge Forms

Page 4: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 4/74

Simple Supported – span effective from 10m to 60mActual example – Route 3

Interchange at Au Tau, Yuen Long

Page 5: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 5/74

Continuous Span – from 10m to 100m

Actual example – construction of a span of continual section

of elevated highway bridge at Route 3, Kwai Chung

Page 6: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 6/74

Balanced Cantilever – span from 25m to 200m

Actual example – balanced cantilever bridge series

forming the approach to the Ting Kau Bridge

Page 7: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 7/74

Balanced cantilever bridge

for viaduct of West Rail at

Au Tau Interchange

Page 8: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 8/74

Balanced Cantilever Suspended Span – span from 50m to 300m

Page 9: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 9/74

Steel Truss – 50m to 100m

Actual example – 

5-span steel truss

 bridge in western

 part of Pearl River,

Guangzhou

Page 10: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 10/74

Steel Arch (framed or trussed) – from 150m to 500m

Page 11: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 11/74

Sydney Harbour Bridge

and its approach

Page 12: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 12/74

Close up view of the

 bridge trusses

Page 13: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 13/74

Close up of the bridge at

the tower support

Page 14: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 14/74

Cable suspension – from 400m to 1500m

The 1377m

span Tsing

Ma Bridge

Page 15: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 15/74

Concrete Arch (ribbed or unribbed) – from 50m to 300m

Page 16: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 16/74

Steel Arch – from

100m to 500m

Page 17: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 17/74

The actual example – LuPoa Bridge, Shanghai (550m main span)

Page 18: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 18/74

Cable stayed (multi-spanned) – from 50 to 500m per span

The 3-span cable-stayed Ting Kau Bridge

Page 19: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 19/74

Cable stayed span – from 200m to 800m

Actual example – the connecting bridge from

Macau Mainland to the Island of Taipa in Macau

Page 20: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 20/74

Example of box-sectioned 

steel girder bridge

Page 21: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 21/74

Structural Elements for Typical Bridges

1. Foundation –for bridge towers, portal frames or piers

2. Bridge Tower – the vertical supporting structure for cablesuspension or cable-stayed bridges

3. Pier – the vertical supporting structure for usual spanned  bridges

4. Portal frame – cross beam between piers to support the deck 

5. Bridge deck – the horizontal part of a bridge that support pedestrian or traffic activities

6. Bridge anchor – required only for suspension bridges tocounter resist the pull from the suspension cable

7. Suspension cable – for suspension and cable-stayed bridges

for the hanging, support or counter-balancing of the bridgedeck 

Page 22: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 22/74

The foundation of 

the bridge tower of 

Ting Kau Bridgeon Tsing Yi side

Page 23: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 23/74

The foundation for the

Bridge Tower of Tsing MaBridge on the Tsing Yi side

Page 24: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 24/74

Forming the foundation for piers of elevated highway bridges

Page 25: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 25/74

Pier supports for an

elevated roadway

A portal frame serving

also as a transfer beam

in the Route 3/AirportRailway at Kwai Chung

Page 26: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 26/74

Falsework for theconstruction a

 portal frame

id f i id d hi id

Page 27: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 27/74

Bridge tower for Tsing Ma Bridge and Kap Shiu Mun Bridge

Tsing Ma Tower 

B id f S B id

Page 28: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 28/74

Bridge tower for Stonecutter Bridge

Bridge tower & side span/approach bridge of Stonecutter Bridge

Page 29: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 29/74

Bridge tower & side span/approach bridge of Stonecutter Bridge

Page 30: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 30/74

The forming of the cable

anchor of Tsing Ma

Bridge on Ma Wan side

Page 31: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 31/74

The forming of the cable

anchor of Tsing Ma

Bridge on Tsing Yi side

Forming the deck of the

Page 32: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 32/74

Forming the deck of the

approach section of Tsing

Ma Bridge on Ma Wan sideusing erection and hoisting

approach

Forming the deck of

Page 33: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 33/74

Forming the deck of 

the approach section

of Tsing Ma Bridgeon Tsing Yi side

C l ti th d k f

Page 34: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 34/74

Completing the deck of 

Tsing Ma Bridge (abutting

section at Tsing Yi side) by erecting of the steel

truss at spot

Hoisting and erecting

Page 35: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 35/74

Hoisting and erecting

of the modulated 

 bridge deck for theTsing Ma Bridge

Page 36: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 36/74

Forming the bridge deck of 

Ting Kau Bridge usingmodulated steel girder frames

L i h d k f h l

Page 37: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 37/74

Laying the precast deck of the steel

girder frame

Page 38: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 38/74

Other methods to form the deck of bridges

1. Balanced cantilever method 

2. Construct in-situ

3. Construct using precast beam

4. Construct using precast girder section and erected by a

launching machine (viaduct)5. Construct using incremental launching method 

(the photos of project cases as shown in the following pages are for 

reference only in order to help students to understand more

about bridge construction)

Forming the deck of

Page 39: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 39/74

Forming the deck of 

the Ting Kau Bridge

approach section usinga special balanced-

cantilever traveling

formwork system

Page 40: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 40/74

The Ting Kau Bridge

approach section

Page 41: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 41/74

Construction of a sectionof elevated railway track 

in the KCR Ma On Shan

Line using in-situ method 

Page 42: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 42/74

The laying of precast

 beams to form thedeck of the Route 3

elevated roadway at

Kwai Chung

Page 43: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 43/74

Hoisting of the precast beamsusing a special launching gantry

Page 44: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 44/74

Construction of anelevated highway bridge

using precast girder 

erected by the use of alaunching machine

Page 45: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 45/74

Launching gantry used to erect precast girders to

form a span of an elevated bridge (viaduct)

A bridge in the Fo Tan

R d I t

Page 46: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 46/74

Road Improvement

Project making use of Incremental Launching

method to span across the

servicing KCR rail line

Alignment of servicing rail line

Page 47: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 47/74

 – elevated roadway constructed in the

form of viaduct

Page 48: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 48/74

Route 3 – Kwai Chung Section

Page 49: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 49/74

Route 3 – Country Park Section at Au Tau Interchange

Hung Hom Bypass

Page 50: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 50/74

Page 51: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 51/74

Tsing Yi North Coastal Roadway

Page 52: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 52/74

Highway project inMa On Shan

Page 53: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 53/74

Launching gantry used in the Hung Hom Bypass

Page 54: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 54/74

Launching gantry used in

Route 3 at Au Tau Interchange

Page 55: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 55/74

Launching gantry used 

in Tsing Yi North

Coastal Roadway

Page 56: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 56/74

Launching gantry used in the Ma On Shan highway project (T7)

Page 57: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 57/74

Launching Gantry

used in the Route 3Kwai Chung section

Page 58: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 58/74

Launching Gantry

used in the Route 8

Tsing Yi Section

Page 59: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 59/74

Page 60: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 60/74

Layout of the bridgeapproach/interchange

Page 61: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 61/74

Front leg

Master winch

Rear leg

Slave winch

Rear 

support

HangersFront

support

116m long

Main Truss

(For end span and 1st pair segment erection)(SWL = 105 T)

(SWL = 120T)

Elevation of the Launching Machine

Page 62: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 62/74

A review of other highway and railway bridges

 – construction of the viaduct systems

for the West Rail projects

Viaduct for railway

track of the Kowloon

Page 63: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 63/74

track of the Kowloon

Canton Railway WestRail at the northwestern

 part of the New

Territory, Hong Kong

Some sections of viaduct

Page 64: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 64/74

spanning more than 40mat Au Tau Interchange

Forming the viaduct

Page 65: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 65/74

g

for railway track using the under-

slung girder and 

longitudinal beam

supported method 

E i f h i d

Page 66: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 66/74

Erection of the viaduct

using balanced cantilever 

arrangement with

temporary anchor before

completion of a span

Precast box girders

Page 67: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 67/74

used for the viaduct

Page 68: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 68/74

A section of viaduct with provision for an extension to the future northern link 

Page 69: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 69/74

Construction of some

sections of elevated railway

track using in-situ method 

Page 70: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 70/74

Constructing the linking bridge between Tung Chung and Chek lap Kok 

(the Airport Railway) using Incremental Launching method 

Trends in the Construction of Bridges in HK 

Page 71: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 71/74

Construction of large and long-span bridges is of no doubt a part of the major infrastructure development for a city,

which is, again, a reflection of the economical climate and 

development strategy of the area.

On the construction side, the limited land reserve in Hong

Kong does imposes stringent conditions especially where

the options and cost effectiveness of constructing a bridgeis concerned. To cope with these considerations, a few

world-class bridges over 1000m span are yet scheduled for 

completion in the coming decade, in view of keeping Hong

Kong to be competitive in particular within the highly

economic-active region in the southern part of China. The

construction of these bridges is, without much choice, in the

form of either cable-stayed or suspension bridges.

The construction of other medium to short-span bridges are

 becoming much popular recently as part of the highway

improvement strategy in Hong Kong.

Page 72: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 72/74

p gy g g

The shortage of space for highway improvement works, the

involvement of complicated interchanging provisions, the

familiarization of bridge construction techniques in catering

various local constraints with acceptable cost, are factors that made

 bridges of this type becoming popular.

Some inherited difficulties such as the requirement of large amount

of working spaces for the forming, transporting and storing of the

roomy precast elements; the operation of the launching works, or 

arrangement for traffic diversion within existing busy roadway,

still makes roadwork under urban environments complicated and costly. Needless to mention working in environmental sensitive

locations such as where protection to natural habitats or rural

culture is required; or where waste, noise and dust problems are of ultimate concern.

The cost for constructing bridges are unavoidably high in

particular working within congested and complicated urban

Page 73: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 73/74

 particular working within congested and complicated urban

environment like Hong Kong.

As a tradition, bridges and elevated highway structures in Hong

Kong are mainly constructed in concrete. As a cost saving option,steel bridge, say, in hollow section, box-girder or any other 

feasible design, may be alternative choices for highway bridges,

like those commonly used in Mainland China or Japan. Thesaving in initial cost and construction time of using such

alternatives may provide surplus capitals and expedite the

ongoing infrastructure projects, this is essential especially in theforthcoming years when the economic situation is expected to be

less favourable than before.

Page 74: Presentation Bridge Construction PPT

7/16/2019 Presentation Bridge Construction PPT

http://slidepdf.com/reader/full/presentation-bridge-construction-ppt 74/74

The end of the presentation