المحلية الطرق تطوير برنامجالصرف وشبكات
Local Roads and Drainage Programme
الـعــامــة األشــغــال هـيـئـةPUBLIC WORKS AUTHORITY ASHGHAL
Framework Contract Agreements for LR&DP
Industry Brief
29 April 2012
Agenda
8.00 – 9.00 Registration & Coffee
9.00 – 9.10 Welcoming Remarks – Director of Infrastructure Affairs – Jalal Yousef Salhi
9.10 – 9.30 PWA’s Corporate Strategy – Ambrose McGuire
9.30 – 10.30 Local Roads & Drainage Programme Delivery – Mike Rigsby
10.30 – 11.30 Questions and Discussion
Safety Moment
Exits
Agenda
8.30 – 9.00 Registration & Coffee
9.00 – 9.10 Welcoming Remarks – Director of Infrastructure Affairs – Jalal Yousef Salhi
9.10 – 9.30 PWA’s Corporate Strategy – Ambrose McGuire
9.30 – 10.30 Local Roads & Drainage Programme Delivery – Mike Rigsby
10.30 – 11.30 Questions and Discussion
Ministry of Finance Ministry of Interior Ministry of Environment MMUP KAHRAMAA Qtel /Vodafone Qcool QPC
2022 Qatari Diar MOE ICT Barwa Civil Aviation Supreme Education Council Police & Armed Forces
PMC STEERING GROUP
PUBLIC WORKS AUTHORITY
PRESIDENT’S GOVERNANCE
OFFICE
Asset AffairsAsset AffairsInfrastructure Affairs
Infrastructure Affairs
Building AffairsBuilding Affairs
Design & Construction Supervision
Pavement QA / QC
GEC Steering Group
ContractorsGeneral Engineering Consultants
Construction Contracts
Works Contracts
PMCIDRIS
CH2M Hill
PMCIDRIS
CH2M Hill
PMC Local Roads & Drainage
PB
PMC Local Roads & Drainage
PB
PMC
Expressways KBR
PMC
Expressways KBR
PMC Doha Bay Crossing
PMC Doha Bay Crossing
Road Safety
ITS
Management Contractor
Highways
Management Contractor
Highways
Management Contractor
Drainage
Management Contractor
Drainage
PMC Managed Projects
PMC Managed Projects
PWA
Managed Projects
PWA
Managed Projects
PWA OUTSOURCING STRATEGY ON A PAGE
Area 1 K&A
Area 1 K&A
Area 3 HYDER
Area 3 HYDER
Area 5ATKINS
Area 5ATKINS
Area 4PARSONS
Area 4PARSONS
Area 2AECOM
Area 2AECOM
STAKEHOLDERS
KBR Parsons
Brinckerhoff CH2MHILL
K&A/WSP HYDER PARSONS ATKINSAECOM
GANNETT FLEMING
AMEY MWHMACE/
EC HARRIS
Agenda
8.30 – 9.00 Registration & Coffee
9.00 – 9.10 Welcoming Remarks – Director of Infrastructure Affairs – Jalal Yousef Salhi
9.10 – 9.30 PWA’s Corporate Strategy – Ambrose McGuire
9.30 – 10.30 Local Roads & Drainage Programme Delivery – Mike Rigsby
10.30 – 11.30 Questions and Discussion
Strategy
Agenda
8.30 – 9.00 Registration & Coffee
9.00 – 9.10 Welcoming Remarks – Director of Infrastructure Affairs – Jalal Yousef Salhi
9.10 – 9.30 PWA’s Corporate Strategy – Ambrose McGuire
9.30 – 10.30 Local Roads & Drainage Programme Delivery – Mike Rigsby
10.30 – 11.30 Questions and Discussion
Purpose
• Provide Contractors an Update on the PWA Local Roads and Drainage Programme
• Introduce the Concept of Framework Contracts for Delivery of the Local Roads and Drainage Programme
• Provide Latest Information on the Procurement Process for Frameworks Construction Contracts
QATAR AREAS
Qatar North Khatib & Alami WSP
Qatar South GEC TBD
Doha North Hyder
Doha South Parsons
Doha West Atkins
Programme OverviewProgramme Areas
Programme Overview
• Programme Duration: 5 – 7 years• Initial Budget: Approximately 50 Billion QAR
Catchment Area
ConsultantTotal No.
of Projects
Qatar North K&A/WSP 40
Qatar South TBD 15
Doha North Hyder 68
Doha South Parsons 80
Doha West Atkins 18
Total 221
Qatar North40 Projects
Qatar South15 Projects
Doha North68 Projects
Doha South80 Projects
Doha West18 Projects
Construction Contractors
Organisation
Programme DirectorMike Rigsby
Qatar North Area 1
Doha North Area 3
Doha South Area 4
Doha West Area 5
Infrastructure Affairs Director - Jalal Yousef Salhi Programme Manager - Saoud Ali Al-Tamimi
Deputy Programme Manager - Peter Sansom
Qatar South Area 2
Ow
ner
P
rog
ram
me
Man
ag
erG
EC
Co
ns
ult
an
ts
Public Works AuthorityThe President – Nasser Ali Al Mawlawi
What are Frameworks?
• Long Term Collaborative Agreements Between PWA and Pre-Qualified Contractors
• Umbrella Agreement that Establishes:
– General Terms and Conditions
– Schedule of Rates
– Call Off Procedure
• Specific Work Packages Issued by Call Off Method
Opportunity to Combine International Best Practices with Local Knowledge to Benefit Qatar
Frameworks Agreements
Build Qatari Capabilities and
Capacity
Reduce Procurement Time
Long Term Relations
Owner Flexibility
Value for Money
Improved Quality and
Safety
Contractor KPI’s
Build on current achievements on Safety/Quality/ Environmental / Stakeholder Management/Delivery
Health and Safety 30%
Quality 25%
Schedule 25%
Stakeholder Management
10%
Environmental 10%
Road Safety Strategy 2012-2021
Pre-Qualification Framework Tender Selection of Work Order
• Eligibility• Financial Situation• Experience• Key Staff• Management Approach• Licenses & Registration• Health & Safety• Quality
• Management Approach• Method Statement• Key Staff• Health & Safety• Quality• Environment• Stakeholder Management• Sample Bills of Quantities
• Urban• Suburban• Rural• Industrial
• Project Specific Drawings• Project Specific Specifications• Project Specific BOQ• Construction Schedule
Procurement Stages
Quality-Based Selection Process with Sample Bills of Quantities to Establish Schedules of Rates
From Prequalification
List
Tender & Evaluation
Based on Sample Bill of
Quantities
Choose Panel of
Contractors for
Framework
Select Contractors
for Mini Competition
Direct Call Off Based
on Rates in Framework
BOQ Priced Rates to be Used as Per Framework
Quotation Applying
Framework Rates
(Lump Sum or Re-measure)
Best Price Wins
(Lump Sum or Re-measure)
OPTION 1
OPTION 2
Framework Selection Procedure
Form of Contract
• Being Developed• Considering Several Options
• Expect Detailed Conditions Regarding:
– Quality
– Health and Safety
– Environment/Sustainability
– Stakeholder Management
Indicative Project List
Number of Projects (Billions)Area No of Projects 0 – .200 .200 – .900 .900
Qatar North 40 31(QAR 1.4)
7 (QAR 2.9)
2 (QAR 2.3)
Qatar South 15 11 (QAR 0.8)
3 (QAR 1.4)
1 (QAR 3.6)
Doha North 68 46 (QAR 3.2)
17 (QAR 5.7)
5 (QAR 7.8)
Doha South 80 62 (QAR 4.6)
17 (QAR 8.4)
1 (QAR 1.3)
Doha West 18 13 (QAR 1.5)
4 (QAR 7.5)
1 (QAR 1.0)
TOTAL 221 163 (QAR 11.5)
48 (QAR 25.8)
10 (QAR 15.9)
DRAFT: The Numbers Shown are for Information Only and are not Final Values or Commitments
Selection Considerations
• Key Considerations:– Local Participation– Number of Framework Packages– Value of Packages– Location of Projects– Turnover/Size of Contractors– Length of Programme
Indicative Project List Number of Projects (Billions)
Area No of Projects0 – .200
Qatari Company
.200 – .900
Qatari Company or
50% Qatari/JV
.900 Qatari Company or
50% Qatari/JV
Qatar North 40 31(QAR 1.4)
7 (QAR 2.9)
2 (QAR 2.3)
Qatar South 15 11 (QAR 0.8)
3 (QAR 1.4)
1 (QAR 3.6)
Doha North 68 46 (QAR 3.2)
17 (QAR 5.7)
5 (QAR 7.8)
Doha South 80 62 (QAR 4.6)
17 (QAR 8.4)
1 (QAR 1.3)
Doha West 18 13 (QAR 1.5)
4 (QAR 7.5)
1 (QAR 1.0)
TOTAL 221 163 (QAR 11.5)
48 (QAR 25.8)
10 (QAR 15.9)
DRAFT: The Numbers Shown are for Information Only and are not Final Values or Commitments
Pre-Qualification Requirements
Value (Million QAR) Company
Up to 200 Only Qatari Companies
200 to 900
Option 1 or Qatari Companies
Option 2 > 50% Qatari Companies< 50% Non Qatari Joint Venture
More Than 900
Option 1 or Qatari Companies
Option 2 > 50% Qatari Companies< 50% Non Qatari Joint Venture
Qualifying Criteria
Qatari Company
• Commercial Registration (CR) as a Qatari Company (Qatari Company will be stated on CR)
• Local experience in Qatar for a minimum of 2 Years in infrastructure construction works
Joint Venture
• Minimum 50/50 with a Qatari Company i.e. at least 50% Qatari Company Partner
• Companies must be true Partnership and not a Prime/Sub-contractor arrangement
• Joint Venture Parties shall be Jointly and Severally Liable with Shared Profit & Loss
• One or more Qatari Companies may take part in the Joint Venture agreement, but collectively Qatari Company share must be at least 50%
ExampleAl-Kheesa North and East
(Rawdat Al-Hamama)
Selection Timeline
Industry Briefing
Pre-Qualification Documents
Tender Documents
Award of Frameworks
Response
24th June 20124 wks
2nd September 20128 wks
14th October 20124 wks
Issue
29th April 2012
27th May 2012
22nd July 2012
Selection Timeline
Issue Industry Briefing
4 Weeks
29-Apr-12
Issue Prequalification Documents27-May-12
Framework Contractors Submit Prequalification Documents24-Jun-12
Short List and Issue Tender Documents22-Jul-12
8 Weeks
Receive Tenders
02-Sep-12
Award Frameworks14-Oct-12
4 Weeks Evaluate Prequalification Documents
4 Weeks Evaluate Tenders
Prequalification Evaluation Criteria
Heading Subject
Eligibility Conflict of Interest
PWA Ineligibility
Government Owned Entity
Historical Contract Non-Performance History of Non-Performing Contracts
Pending LitigationFinancial Situation Financial Performance
Experience General ExperienceSpecific Experience
Key Staff Experience General Roads, Drainage and Infrastructure Experience
Specific Experience
Licenses and Regulations Local Registrations
Health, Safety & Environment Company Health, Safety & Environment Plan
Quality Assurance Company Quality Assurance Plan
Declaration Compliance to QCS2010 and any other requirements
Next Step 27 May 2012Issue Pre-Qualification Documents
Questions/Discussion
Thank You