ATC_November 2005 - 1
Build-up control(in Preheater Kilns)Mastering Riser and Tower Build-ups
BuildBuild--up controlup control(in (in PreheaterPreheater Kilns)Kilns)Mastering Riser and Tower BuildMastering Riser and Tower Build--upsups
TechnicTechnicallgenda
Build-up Control (in preheater kilns)
ATC_November- 2005 - 2
General information
Objective• Consolidate know-how on build up control in PH Towers• Identify practical ways & means to master build-up
Deliverables • Produce a complete reference book and a shorter practical quick
reference guide for plant users
Division wide team• C. Venkateswarlu (ATC, leader) J. Desseix (RR)C. Landais (CTEO)• H. Schoffmann (CTEC) P. Muithya (CTI)S. Fujimoto (CTS)
Present Status• Document completed in September’05
Build-up Control (in preheater kilns)
ATC_November- 2005 - 3
Target Group
Plants
Optimization Managers ,Process & Production Engineers
CCR operators
Key MessagesPreheater buildups can be mastered under any circumstances as long
as the appropriate levers(Specific to each plant) are applied.
Implementation of this TA will lead to significant improvement in kiln
performance and reliability even with high usage of alternative fuels.
Build-up Control (in preheater kilns)
ATC_November- 2005 - 4
Content of study
Reference Main document, Quick Reference Guide & Otherreferences in annex
TA Agenda covers:• Chemistry
• Operations
• Refractory
• Geometry (design)
• Build-up Removal equipment sections
• Quick Reference Guide• Key recommendations
• Check-lists
Build-up Control (in preheater kilns)
ATC_November- 2005 - 5
Preventive measures• Control Chemistry of kiln inputs
• Kiln operation by Managing • Burning zone
• Combustion
• Kiln control loops
• Refractory
• Geometry of preheated
Curative measures• Build up detection & cleaning
Content of study
Build-up Control (in preheater kilns)
ATC_November- 2005 - 6
1 - Chemistry
Determine balance (SO3, Cl & Alkalis)• Reduce inputs – to regain balance where possible
Track bottom stage meal Cl vs. SO3• Track tendency to determine thresholds
• Control levers
• Maintaining Chart
• Unique to each plant
Build-up Control (in preheater kilns)
ATC_November- 2005 - 7
CTEC Region Plants- Hot meal monitoring
Build-up Control (in preheater kilns)
ATC_November- 2005 - 8
2 - Operations
Check-List of Kiln Mastery items • Calciner
• Kiln
• Burner
• Cooler
Special techniques for older & smaller calcinerdesignsMeal curtains are more effect techniques• Creating dirty backend
• Alternatives are ESW chains to lifters
• Appendix includes a more complete meal curtain report (design&optimization)
Build-up Control (in preheater kilns)
ATC_November- 2005 - 9
Figure A1: Meal
Meal Curtain
• Recommended: • Best variable control
• Plants with no bypass
• Likely a standard feature on new kilns
• Cost depends on layout
Build-up Control (in preheater kilns)
ATC_November- 2005 - 10
3 - Refractory
CKHC Reference
Use of SiC refractory• Better refractory life
• Coating Repellent
SiC percentage in refractory• Buildup Severity
• Check with Suppliers / Technical Centers
Build-up Control (in preheater kilns)
ATC_November- 2005 - 11
4 – Geometry (Design)
Designs to avoid build-up by eliminating dead zonesTopics include• Cyclones
• ducts
• Meal pipes
• Flaps
• Splash boxes
Key notes• Simple changes
• Correct Design mistakes
• Corrective Case Studies
Build-up Control (in preheater kilns)
ATC_November- 2005 - 12
5 – Removal Equipment
Preventive equipments.• Safety
• Optimize Blasters
• Placement maintenance
• CO2 cartridges
• High pressure water gun
When build-ups are minimized cleaning is effective in managing the problem
Build-up Control (in preheater kilns)
ATC_November- 2005 - 13
Conclusions•Build-up can be mastered
• ARM / AF is not a good excuse for poor performance
Solution can be complex – often a mixture of techniques
• Bigger challenge on older designs
• TA document is a tool to help plants to self audit & use to determine
plant unique final solutions.