Presentación de PowerPointOcéano Pacífico Océano Atlántico 0 m 3.000 m 5.500 m Sección...
Transcript of Presentación de PowerPointOcéano Pacífico Océano Atlántico 0 m 3.000 m 5.500 m Sección...
Ministerio de Energía y Minería
Presidencia de la Nación
Secretaría deCoordinación dePolíticaMinera
Why Mining in Argentina
70% of GDP
69% of total country population 71% of exportations 70% of existing infrastructure
Pampeana Region
30% of Argentina territory
Chile
8,1 % GDP
Economic Development Geographically
Concentrated in Pampeana Region
2025 Mining Industry GDP: 3% to 4% of total GDP
2025 Argentina Mining: geographically balancedeconomic development
Mining
Industry GDP
0,74% of total
GDP
Oil & Gas Mining
EXTRACTIVE INDUSTRIES PRODUCTION
Océano AtlánticoOcéano Pacífico
0m
3.000 m
5.500 m
Sección topográfica- geológica en cruz
CHILE
Cu - AuPachónCu - Au
Salar de Olaroz Salar del Hombre Muerto
LiLiAtacama
Pelambres Bajo de la Alumbrera
Agua Rica
Taca TacaCu, Au, Mo
ARGENTINA
Lama Au, AgPascua Au, Ag
Río Turbio Carbón
0m
Vista por secciones
POTENCIAL GEOLÓGICO
Key exploration areas
5000
KM
GEOLOGICAL/ MINING POTENTIAL
Exploration Investment required: USD 300 / 400 M/Y
Surfaces with potential for exploration to be granted: 65%
AREA 1 Santa Cruz
AREA 2 Río Negro & Chubut
AREA 3
AREA 4
AREA 5
AREA 6
Neuquén
Mendoza, San Juan & La Rioja
La Rioja & Catamarca
Catamarca, Salta & Jujuy
GEOLOGICAL / MINING POTENTIAL
20 Años de Gran Minería / Minería Metalífera
14 Mining projects in production
2 Mining projects under Construction
11 Mining projects at Feasibility Stage
21 Mining projects in Advanced Exploration Stage
34 Mining projects in Medium-to-Advanced
Exploration
77 Mining projects in Early-Stage Exploration
Gold & Silver
Copper
Lithium
Lithium Boom
RESULTS
35 new mining companiesintroduced in the country
Source: Sedar, Operating Companies, Province Official Entities
Pegmatite District Qty. Project Status
1- El Quemado 1 El Quemado Exploration
2- Ancasti 2 Vilisman - Ancasti Exploration
3- Altautina 1 Las Tapias Mine Exploration
4- Conlara 1 Las Cuevas Mine Exploration
5- Pegmatite Districts La Estanzuela & Conlara
1La Estanzuela -Conlara
Exploration
3
1
2
4 5
Córdoba
La Rioja
San Luis
Catamarca
Salta
Backgrounds:
- 1936 San Luis & Córdoba- First registry of Lithium minerals
production Exportations almost exclusively to the USA
(military and aerospace industries)
- 1966 first economic extraction of Lithium from brines in
Nevada, the USA, with significantly lower costs associated
to the extraction process. Production from pegmatites
declines
- 1997, FMC Lithium starts the production and
exportation of Lithium (Chloride and Carbonate)
products at Salar del Hombre Muerto, Catamarca.
PROJECT STATUS IN ARGENTINA –
PEGMATITE DISTRICTS
3 12
456
78
109
1112 13
1415
1617
1819
20
2122
23
Jujuy
Salta
Catamarca
La Rioja
Source: Sedar, Operating Companies, Province Official Entities
In operation: 2 Expansion Project : 2 Construction :2 Feasibility/Adv. Exploration: 10 Grass root expl./Prospecting: >40
LegendOperation/Production
Construction
Feasibility/Adv.Exploration
Grass root Expl./Prospecting
Expansion
PROJECT STATUS SURVEY IN ARGENTINA
- SALAR BRINES / SALT LAKES-
MOST ADVANCED PROJECTS IN LITHIUM SALAR BRINES
•
THANKYOU