Clinker Cooling
Cooler Modification- New solution for todays market demands
Alexis Lua - Claudius Peters
The Golden Days
• Do you remember when:
• Cement demand was high
• Competition was low
• Energy prices where stable
• Environmental regulations where minimal
• Investment money was
ready available $$$
• Claudius Peters remembers
Today
• Cement price is low
• Competition is high
• Energy price is high
• Environmental regulations are though
• Investment cuts eminent $
Claudius Peters solution:
• New cooler technology• Efficient = decrease energy
and fuel cost
• Closed system = environment friendly
• Short Return of Investment
My cooler comes from the Golden Days
COOLER MODIFICATION
Increase efficiency
Reduce Maintenance Costs
Always available
SAVE $$$
EFFICIENCY
Modern
ETA Cooler
Traditional
Grate Cooler
Bed height 950 mm 600 mm
Clinker retention Time @ 45 t/d/m² 42,6 min 26,9 min
Power consumption 4,89 kWh/t clinker 4 kWh/t clinker
Cooler Efficiency 77,8 % 73,9 %
MAINTENANCE
ETA Cooler Grate Cooler
Self-protected design
with pebbles and high
clinker layer
Burnt and broken grate plates,
due to direct hot clinker
contact
Hard facing Lane filling with
pebbles
Photo courtesy of client
MAINTENANCE
Photo courtesy of client
Only paint is off
the cooler is ready
for production
After 4 years
After 9 years
MAINTENANCE• Heavy duty rollers
Sig
genth
al /
Sw
itzerla
nd
Sig
genth
al /
Sw
itzerla
nd
02/2
015
Rollers after 6 years after 10½ years of operation
• Designed for fatigue strength and continuous operation
• Slow movement and hard faced surfaced
• Greasing once a year only
• Never replaced a roller since 2004
AVAILABILITYFailure mode:
Modern
ETA Cooler
Traditional
Grate cooler
Failure of one pumpBy-pass is opened, clinker
production continues
Stand-by pump must be
activated
Failure of one lane drive Production continues Production stop
Failure of 2 lane drives Reduced production continues Production stop
DESIGN BONUSETA Cooler-Walking floor tech
No red river Thermal homogenization
No snow man Controlled Side Aeration (CSA)
Cool clinkerLonger drag conveyor and filter life time
Stroke Length2-4 strokes /min = fast cooling , high quality clinker
HE Module flex
airAccurate aeration control
HE Module Cross sealing for max plate lifetime
Experience More than 800 coolers sold
Pioneers More than 100 years of innovation
Smaller HD fan Lower combustion gas vol.
OLD out NEW in
COOLER MODIFICATION
NEW SOLUTION FOR TODAYS MARKET DEMANDS
MODIFICATION
Existing upper steel & refractory
Extension cooler upper part
New parts: pre-asambled ETA lane units
New roller crusher
1
2
3
11 m/s !!
6,3 m/s
13,9 m/s !!!
Separate Bypass ??
Capacity: 3700 t/dAerated Area: 71,1 m²Grate Load: 52,1 (t/d)/m²
MODIFICATION
Existing upper steel & refractory
Modified side walls
New parts: pre-erected ETA lane units
MODIFICATION
Essential design features:
fully modular construction
local fabrication maximized
flexible module arrangement for existing plants
pre-assembled modules to site
Fast installation – minimized kiln shut down time
3 Lane Unit2 Lane Unit
MODIFICATION
Stage Cooler Modification- Quantou Group, China
MODIFICATION
Stage Cooler Modification- Quantou Group, China
Exist. WHR New Mill Air
Heat Content
16,5 MW
Exist. Exhaust Main New WHR
Existing small exhaust New exhaust
MODIFICATION
Stage Cooler Modification- Quantou Group, China
IS MY COOLER SUITABLE FOR MODIFICATION?
CASE STUDYOperation Cost comparison
[Euro/a] [Euro/a]
Capacity 7800 t/d 7800 t/d
Increased capacity @ constant ph fan speed 471 t/d
1: Cooler availability 99,9% 96,3%
Cement production [t/a] 2.571.426 2.478.762
Clinker profit [€/a] 33.801.300 €/a 3.974.700 €/a 29.826.600 €/a 0 €/a
Operation Cost comparison ETA Cooler [Euro/tclinker] Grate Cooler [Euro/tclinker]
2: Cooler efficiency 78,3% 67,0%
Specific Fuel cost [Eur/tclinker] 10,63 11,49
3: Power con. Cooler[kwh/tclinker] [Fans only] 4,34 4,0
Specific power cost [Eur/tclinker] 0,43 0,40
4: Maintenance Cost [Eur/tclinker]* 0,012 0,039
5: Exhaust air Volume [Nm³/kg] 0,788 1,24
Specific power cost [Eur/tclinker] 0,084 0,20
6: Preheater Exit Gas Volume [Nm³/kg] 1,45 1,53
Power consumption [Eur/tclinker] 0,697 0,837
Flexible operation cost [Eur/tclinker] 11,86 €/t 12,97 €/t
Fixed operation cost [Eur/tclinker] 15 €/t 15 €/t
Sales price clinker [Eur/tclinker] 40 €/t 40 €/t
Profit clinker [Eur/tclinker] 13,14 €/t 12,03 €/t
ETA Cooler Existing Polysius SR4840
CAPITAL COST 4.588 TEUR
BENEFIT PER MONTH 331 TEUR
BENEFIT EFFECTIVE IN 9 Month
INTEREST 2% IRR yearly 65,0%
MONTH EXPENSE EXPENSE INCOME NET FLOW DISCO DISCO CUM
% TEUR TEUR TEUR FACTOR FLOW FLOW
1 30% 1.376 - (1.376,3) 1,00 (1.376,3) (1.376,3)
2 0% - - - 0,9983 - (1.376,3)
3 0% - - - 0,9967 - (1.376,3)
4 0% - - - 0,9950 - (1.376,3)
5 0% - - - 0,9934 - (1.376,3)
6 0% - - - 0,9917 - (1.376,3)
7 70% 3.211 - (3.211,3) 0,9901 (3.179,3) (4.555,6)
8 - - - 0,9884 - (4.555,6)
9 - 331,3 331,3 0,9868 326,9 (4.228,7)
10 - 331,3 331,3 0,9851 326,4 (3.902,3)
11 - 331,3 331,3 0,9835 325,8 (3.576,5)
12 - 331,3 331,3 0,9818 325,3 (3.251,2)
13 - 331,3 331,3 0,9802 324,7 (2.926,4)
14 - 331,3 331,3 0,9786 324,2 (2.602,2)
15 - 331,3 331,3 0,9770 323,7 (2.278,6)
16 - 331,3 331,3 0,9753 323,1 (1.955,4)
17 - 331,3 331,3 0,9737 322,6 (1.632,8)
18 - 331,3 331,3 0,9721 322,1 (1.310,8)
19 - 331,3 331,3 0,9705 321,5 (989,3)
20 - 331,3 331,3 0,9689 321,0 (668,3)
21 - 331,3 331,3 0,9672 320,4 (347,8)
22 - 331,3 331,3 0,9656 319,9 (27,9)
23 - 331,3 331,3 0,9640 319,4 291,5 24 - 331,3 331,3 0,9624 318,9 610,3
25 - 331,3 331,3 0,9608 318,3 928,6
26 - 331,3 331,3 0,9592 317,8 1.246,4
27 - 331,3 331,3 0,9576 317,3 1.563,7
28 - 331,3 331,3 0,9560 316,7 1.880,4
29 - 331,3 331,3 0,9544 316,2 2.196,6
30 - 331,3 331,3 0,9529 315,7 2.512,3
31 - 331,3 331,3 0,9513 315,2 2.827,5
32 - 331,3 331,3 0,9497 314,6 3.142,1
33 - 331,3 331,3 0,9481 314,1 3.456,2
34 - 331,3 331,3 0,9465 313,6 3.769,8
35 - 331,3 331,3 0,9450 313,1 4.082,8
36 - 331,3 331,3 0,9434 312,5 4.395,4 37 - 331,3 331,3 0,9418 312,0 4.707,4
48 months calculation
Return on Investment
Preliminary Non Committal
CASE STUDY
CASE STUDY
Replace your CoolerSave € 4.000.000/yr
SUCCESS STORIES
23
JOIN THE ETA EVOLUTION
Sources
• https://www.lottosend.com/blog/can-money-buy-happiness-this-lottery-winner-thinks-so
• http://i.dailymail.co.uk/i/pix/2015/05/03/21/2843B78000000578-0-image-m-154_1430686303059.jpg