BAMBU STRUCTURE
BAMBU
Structure of fixed awning with tensed fabric
BAMBU
Possible instalation positions
Position pole profiles 15°
Position pole profiles 0°
Position pole profiles 15°, up
profile 5°
Position pole profiles 0°, up
profile 5°
Position pole profiles 15º-0°,
up profile 5°
Position pole profiles 15º-0º, up profile
0º
BAMBU
Position pole profiles 0°
Título presentación
Position pole profiles 0°, up
profile 5°
BAMBU
Position pole profiles 15°
BAMBU
Position pole profiles 15°, up
profile 5°
BAMBU
Position pole profiles15º-0°, up profile 5°
BAMBU
Position pole profiles15º-0º, up profile 0º
BAMBU
BAMBU
Maximum length up profile A = 6m
BAMBU
Maximum pole profile lenght B = 3m
BAMBU
Minimum high to up profile D = 2,1 m
BAMBU
Minimum distance between pole C = 2 m
BAMBU
Maximum distance between pole E = 3,282 m
BAMBU
FABRIC
BAMBU
Polyester • 2 sides PVC • Drive strength (Warp/Weft): 270 daN - 5 cm / 230 daN - 5 cm • Temperature resistance: -30 +70º • Fire-resistant M2
FABRIC RECOMMENDATION:
BAMBU
1. Pole profile2. Up profile3. Profile joint kit4. Pole base joint5. Pole support6. Pole cap7. Fabric tension kit8. Structural profile
90x509. Concrete slab
BAMBU
1. Pole profile and 2. Up profile
Weight = 5.556 Kg/m
BAMBU
3. Profile joint kit
BAMBU
4. Pole base joint
BAMBU
5. Pole support
BAMBU
6. Pole cap
BAMBU
7. Fabric tension kit
BAMBU
8. Structural profile 90x50
BAMBU
9. Concrete slab
BAMBU
INSTALLATION: part 1 pre-assembling
BAMBU
Thread the holes in thepole and up profiles:
• Poles: in one side the central hole (M12) and the 4 external ones (M8). On
the other side, the central hole (M12)
• Up profiles: only the central hole (M12), at
both sides
BAMBU
Pole base joint assembly:
• Place the joint support in the pole profile.
• Fix both parts with the provided screws.
Note: follow this procedure for the four poles.
Pre-installing the profile joint kits depending on the chosen
assembly option:
• 15º-0º for poles and 5º-0º for up profiles
BAMBU
BAMBU
• Placing the fabric at the up profiles:
• Put the flanges as shown at the image.
• Place the fabric through the ogives at the upper part of the
crossbeam.
BAMBU
• Put the caps at the up profiles
• Screw down the caps at up profiles
Fabric tensor kit assembly:
• Coil the prisoners to the piece and align as shown at the image
• Put and screw to the profile • Fix the flanges with the
screws
BAMBU
BAMBU
INSTALLATION: part 2 at place
BAMBU
Put the base poles at the right position.
• Check the parallelism of the base poles using diagonal lines
• Drill and fix the base poles to the floor with screws (non included).
M12 recommended.
A = 3,282 m
C1 = C2 = 3,843 m
B = 2,0 m
BAMBU
Placing the poles in the base poles:
• Put the pole in the base pole.
Note: The poles at the base can be oriented in two positions, 0° and 15°, turning 180º the pole.
• Insert the bolt and fix it with the safety pin.
Note: Follow this procedure for the four poles.
BAMBU
Place the adjustment of the jointknot:
• Introduce it through the profile guide
• Block it to the right distance depending on the chosen assembly option.
BAMBU
Assembling the knot at the pole:
• Put the knot through the pole guide to the limit until the assembly flange.
BAMBU
Assembling the up profile at the poles.
• Bring up the up beams and fix the knot with the screws and the flanges previously placed.
BAMBU
Assembling the up profiles:
• Put the fixed strut at the mobile one (already placed at the up profiles) and introduce the guide profile until it leans on the pole
• Fix to the pole.
• Tighten the prisoners until the fabric is taut
BAMBU
BAMBU
Assembling the pole caps:
• Place the caps at the upper part of the poles.
BAMBU
Concrete slabs:
• It is possible to assemble the Bambu Canvas to the floor whenever is not permitted by law thanks to the use of 100 Kg. reinforced concrete slabs.
BAMBU
Connected structures: