Preparing for EN 81-20/50: Organizational Changes and Best Practices for an elevator components manufacturing company Andrea Bondavalli Interlift 2015 VFA-Forum

Transcript of Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR...

Page 1: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

Preparing for EN 81-20/50: Organizational Changes and Best Practices for an elevator components manufacturing company

Andrea Bondavalli

Interlift 2015VFA-Forum

Page 2: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

� Overview on EN81-20/50� WITTUR approach� Best Practise� WITTUR new testing structure

Agenda

20.10.2015 Wittur SpA - May 2015 2

Page 3: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

New EN 81-20/50

� EN 81-20: Safety rules for the construction and installation of lifts

Lifts for the transport of persons and goods

� EN 81-50: Safety rules for the construction and installation of lifts

Examinations and tests

� New technical requirements e.g.� well/components� landing doors/car doors� cars� safety components� electric and hydraulic drive system� guide rails� electrical equipment� control system� documentation

Biggest change in the elevator industry for over 30 years

320.10.2015 Corporate Strategy Wittur Group 2015

Page 4: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

Important changes for doors

� Test of door panel/frame with higher + additional force

� Pendulum test for all landing and car doors in closed position

� Guides with retaining devices + pendulum test for all landing and car doors

� Car door apron must be tested with force

� Car door lock for all car doors with type examination

� New requirements for emergency unlocking key

� Labyrinths or chicanes / thickness of front edges

100 cm2

≤ ≤ ≤ ≤ 35 mm

300 N

New EN 81-20/50

420.10.2015 Corporate Strategy Wittur Group 2015

Page 5: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

EN81-20/50 – Requirements for Doors

20.10.2015

� 300 N force applied to the door panel on a 5cm2 round or square section area:� No permanent deformation� Elastic deformation less than 15

mm� Safety function of the door not

affected

� 300 N test like EN81-1/2 to the door panel/frame on a 5 cm² round or square area:

+� Static force 1000 N applied to the door

panel/frame on a 100 cm2 round or square section area:� Landing / Car doors shall resist

without significant permanent deformation affecting functionalityand safety

+� Retaining devices must face a

dedicated pendulum test under the worst possible failure condition of the normal guiding elements

5

5 cm2

100 cm2

EN81-1/2 EN81-20

Copyright 2015 by Wittur. All rights reserved

Page 6: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

EN81-20/50 – roadmap to the compliance

20.10.2015 6Copyright 2015 by Wittur. All rights reserved

� Product verification

� Product compliance

� Certification process

� Implementation

Page 7: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

� Wide range of door types, dimensions, variants

� Wide range of manufacturing plants

� Increased need of repeatability and accuracy in testing phase

� Keep the highest level safety

WITTUR approach - challenges

20.10.2015 Wittur SpA - May 2015 7

Page 8: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR approach - Wide range of door manufacturing plants

Check and implement simultaneously in all plants!

Current Production

Buenos Aires, Argentina

Doors, cars,complete elevators

Londrina, Brazil

Doors

Chennai, India

Doors, cars

Suzhou, China

Doors, safeties,gearless drives

Zaragoza, Spain

Doors, complete doors

Parma, Italy

Doors, cars,complete elevators

Scheibbs, Austria

Doors,slings, safeties

Krupina, Slovakia

Doors, slings

Istanbul, Turkey

Doors, cars, complete elevators

8

20.10.2015 8Copyright 2015 by Wittur

Page 9: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

� Door series, types, dimensions, variants

WITTUR approach - Wide range of variants

20.10.2015 Wittur SpA - May 2015 9

Page 10: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR approach – repeatability, accuracy and leadtime

20.10.2015 Wittur SpA - May 2015 10

� repeatability and accuracy of results

� Reduce the lead time in testing

Page 11: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR approach - Safety

20.10.2015 Wittur SpA - May 2015 11

� Reach the highest level of safety

Page 12: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

Best practice - How to reduce number of tests?

20.10.2015 12Wittur SpA - May 2015

� Study of the worst configurations � high knowledge in FEM analysis

� Agree with NB

� Test the worst configuration

� Additional validation tests

Page 13: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

Best practice – Still improvements needed

20.10.2015 13Wittur SpA - May 2015

� After the “optimization” of foreseen tests, still number of tests remain high

� Repeatability & accuracy problems remain

� Safety can still be improved

Page 14: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR new testing structure – overview

20.10.2015 14Wittur SpA - May 2015

Page 15: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR new testing structure – from project to real product

20.10.2015 15Wittur SpA - May 2015

Page 16: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

� Powered movement of: � fitting structure� tools to apply forces

� Automatic detection of testing points

� Automatic application of pre-set forces

� Automatic measurement of deformations

� Automatic storage of results and issue of reports

WITTUR new testing structure – features

20.10.2015 Wittur SpA - May 2015 16

Page 17: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

� Assembly phase independent from testing

� Repeatability and accuracy in measurements

� Testing time reduced by 65%

� Safety in testing

WITTUR new testing structure – Adds on

20.10.2015 Wittur SpA - May 2015 17

Page 18: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR new testing structure – Overview

20.10.2015 Wittur SpA - May 2015 18

Page 19: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

WITTUR new testing structure – Results

20.10.2015 Wittur SpA - May 2015 19

Page 20: Preparing for EN 81-20/50: Organizational Changes and …¤ge... · Overview on EN81-20/50 WITTUR approach Best Practise WITTUR new testing structure Agenda 20.10.2015 Wittur SpA

Thank you for your kind attention

20.10.2015 20

See you in the

Andrea BondavalliCorporate Certifications, Patents and Trademarks Manager

WITTUR Italy Technical Manager