Prepared by Dr. Leonard R. HeppAll Rights Reserved
Basic Tools & Techniques(graphical, tabular & statistical)
Segmentation Tools
Distribution Charts
Process Mapping
Trend Charts
Check Sheets
FMEA/EMEA (Risk Tools)
Process Control Charts
1. Segmentation Tools…Fishbone/Affinity Diagram2. Distribution Charts…Histogram/Pareto3. Process Mapping…Flowchart4. Trend Charts…Scatter Plot/Run Chart5. Data & Process Development…Check Sheets6. Risk Reviews…FMEA/EMEA7. Process Controls…Control Chart/Dashboards
“Seven Quality Tools”
Prepared by Dr. Leonard R. HeppAll Rights Reserved
1. Segmentation Tools
Pareto Charts
Affinity Diagram: Loan Approval
Low InterestRate
Variable Terms
Pay BackWhen I Want
NoPrepaymentPenalties/Charges
Pre-ApprovedCredit
FlexibleProduct
All ChargesClearly Stated
EasyApplication
Easy AccessTo Capital
Quick LoanDecision
Know StatusOf Loan (Post-
Approval)
Know StatusOf Loan During
Application
Preference IfBank Customer
Can ApplyOver Phone
EasyProcess
Will Come ToMy Facility
AvailableOutsideNormal
BusinessHours
AvailableWhen I Need
To Talk
ResponsiveTo My Calls
Talk ToOne Person
Availability
KnowledgeableReps
Professional
Make Me FeelComfortable
Patient DuringProcess
Friendly
PersonalInterface
Knows AboutMy Finances
Knows AboutMy Business
Makes FinanceSuggestions
Cares AboutMy Business
Has Access ToExperts
ProvidesAnswers ToQuestions
Calls IfProblems Arise
Advice/Consulting
May Jun Jul Aug
0%
20%
40%
60%
80%
100%
% O
TD
May Jun Jul Aug
OTD to Dynacircuits (Direct)
Hisco
Coshocton
Manpower
Material
Measurement Machine
MethodEnvironment
Raw GlassInventoryErrors
• Lack of audit trail- non-lot specific at work centers
• Barcode not working
• Computer Availability•Wrong input QTY based on measure
• Supervision (audit)
• ownership of defect material• PD/BOM ownership
• Data entry procedures• material movement procedures
• operators do not input• input errors
• Supervision (knowledge)
• tie from error to cause• top-down communication
• Report total transactions• Scrap report
• BOM incorrect• Large workstation size (DOCK)
• Operator timely input• Metering of Acetone
• QC/Obsolete Material in inventory• Large W/O size
• Supervision (routine)• UOM (phantoms)
Fishbone Diagram
Prepared by Dr. Leonard R. HeppAll Rights Reserved
2. Distribution Charts
100959085807570656055
10
5
0
Test Grades
# of S
tude
nts
StamfordAtlantaDenverChicago
0.14
0.12
0.10
0.08
0.06
0.04
0.02
0.00
Location
% d
efec
tiveHistograms
Box Plots
Probability PlotsLSL USL
20100
100
50
0
Bi-modalFre
quenc
y
706050403020100
150
100
50
0
Exponential
Fre
quenc
y
*
*
*
*
1
1
2
2
.
.
5
5
0
0
1
1
.
.
3
3
6
6
*
*
*
*
O
O
b
b
s
sP
P
P
P
M
M
<
<
L
L
S
S
L
L
E
E
x
x
p
p
O
O
b
b
s
sP
P
P
P
M
M
>
>
U
U
S
S
L
L
E
E
x
x
p
p
O
O
b
b
s
s
%
%
<
<
L
L
S
S
L
L
E
E
x
x
p
p
O
O
b
b
s
s
%
%
>
>
U
U
S
S
L
L
E
E
x
x
p
p
0
0
.
.
0
0
4
4
9
9
4
4
8
8
2
20
0
.
.
4
4
6
6
0
0
7
7
8
8
3
30
0
.
.
7
7
5
5
7
7
6
6
7
7
6
60
0
.
.
6
6
0
0
9
9
2
2
2
2
9
9
1
1
6
6
.
.
0
0
*
*
0
0
.
.
5
5
*
*
0
0
.
.
9
9
*
*0
0
.
.
7
7
4
40
0
.
.
7
7
4
4
*
*
*
*
LL
ii
nn
ee
77
CC
pp
kk
0.750.700.650.600.550.500.450.400.35
Lower SpecLower Spec
s
Mean-3s
Mean+3s
Mean
n
k
LSL
USL
Targ
Cpm
Cpk
CPL
CPU
Cp
Short-Term Capability
125000
13641
Cp Cpk Ppk, Zst, Zlt, Zshift
40353025
Cycle Time
Dotplot for Cycle Time
Loan Type
Large
Medium
Small
Dot Plots
Prepared by Dr. Leonard R. HeppAll Rights Reserved
3. Process Mapping
Detailed Process …Bottlenecks and Rework
…Representing a Costly “Hidden Factory”
Compare System to Paper
Place Phone Call to Branch
Finalize Decision to
Suspend
Enter Decision
into System
Enter Special Feature
Code into System
Pre-Sub or Resub of Presub
Review & Make Loan
Recommendation
Underwriter Places Phone Call for “Don’t
Process” & Then Faxes
Track & Deliver to
Team Leader
Team Leader Places Phone Call for “Don’t
Process” & Fax
Re-Call Branch at
5-Day Point
Reject File Due to Non-Action on Suspense
Retain For Add’l
Time Period
Receive F/U From
Fax or Mail
Central
Closing
Branch Closing
Track Location to Fax Room
Place File in Central Closing
Bin
Underwriter Track
Location to Mail Room
Mail Room Person Track
Location to Branch
Prep File for Return to Branch
File Out to Branch
If Credit/Prop Only
Will Be Returned by Branch
as a Rescue
Track Location to Mail Room
Prep File for Return to Branch
File Out to Branch
Review by Team Leader
(2nd
Review)
Possible Review by Reg.
V.P.
Reject the loan
1
1
Fed-Ex Receipt
Received at Front Desk
Enters Mail
Room
If Courier
Identify Subm. Type
Log Incoming
Files (Manual)
ID Submissio
n File
Log In-Coming
Files (Manual)
Register File at Mail
Room
Track Location
Delivered to
Underwriter
Separate Files by
Reg. Sub. Type
Track Location (MI:
Re-Sub)
Delivered to File Bin (Non-MI
New Submissio
n)
Calculate Distributio
n
Delivered to MI Desk
MI Underwriter Process
Manually Count/Track Deliver
Files
Presub
ID Submissio
n Type
Follow Up
Await Pick Up
Track & Deliver to Central Closing
Print Loan Decision Sheet, as Applicable
Track Location to
Team Leader and Deliver
(SUS) Retain at Underwriter
Desk for 5 Days for F/U
Place Phone
Call by 2nd
Reviewer
Track Location to Branch
Team Leader Review & Make
Loan Recommendation
Fax Comments
on “Continue
to Process”
Register File at Front Desk
(Pre-Sub to File Bin.)
ID Delivery
Point
If High
Volume
Receive &
Distribute Fax
Enter Condition
s into System
Update System to Match Loan
Decision, if Appl.
Review & Make Loan
Decisions
Compare System to Paper
Place Phone Call to Branch
Finalize Decision to
Suspend
Enter Decision
into System
Enter Special Feature
Code into System
Pre-Sub or Resub of Presub
Review & Make Loan
Recommendation
Underwriter Places Phone Call for “Don’t
Process” & Then Faxes
Track & Deliver to
Team Leader
Team Leader Places Phone Call for “Don’t
Process” & Fax
Re-Call Branch at
5-Day Point
Reject File Due to Non-Action on Suspense
Retain For Add’l
Time Period
Receive F/U From
Fax or Mail
Central
Closing
Branch Closing
Track Location to Fax Room
Place File in Central Closing
Bin
Underwriter Track
Location to Mail Room
Mail Room Person Track
Location to Branch
Prep File for Return to Branch
File Out to Branch
If Credit/Prop Only
Will Be Returned by Branch
as a Rescue
Track Location to Mail Room
Prep File for Return to Branch
File Out to Branch
Review by Team Leader
(2nd
Review)
Possible Review by Reg.
V.P.
Reject the loan
1
1
Fed-Ex Receipt
Received at Front Desk
Enters Mail
Room
If Courier
Identify Subm. Type
Log Incoming
Files (Manual)
ID Submissio
n File
Log In-Coming
Files (Manual)
Register File at Mail
Room
Track Location
Delivered to
Underwriter
Separate Files by
Reg. Sub. Type
Track Location (MI:
Re-Sub)
Delivered to File Bin (Non-MI
New Submissio
n)
Calculate Distributio
n
Delivered to MI Desk
MI Underwriter Process
Manually Count/Track Deliver
Files
Presub
ID Submissio
n Type
Follow Up
Await Pick Up
Track & Deliver to Central Closing
Print Loan Decision Sheet, as Applicable
Track Location to
Team Leader and Deliver
(SUS) Retain at Underwriter
Desk for 5 Days for F/U
Place Phone
Call by 2nd
Reviewer
Track Location to Branch
Team Leader Review & Make
Loan Recommendation
Fax Comments
on “Continue
to Process”
Register File at Front Desk
(Pre-Sub to File Bin.)
ID Delivery
Point
If High
Volume
Receive &
Distribute Fax
Enter Condition
s into System
Update System to Match Loan
Decision, if Appl.
Review & Make Loan
Decisions
Streamlined Process…With Metrics and Accountability
Receptionist
Underwriting Assistant
Processor
Underwriter
Closer
Update System
File in Updated Drawer
Receive Conditions via Fax & From
Receptionist
File in U/W
“Clear to
Close”Bin
Deliver to
Appropriate U/W
Match Condit
ion with Orig. File
Clear Conditions
Pull U/W
“CTC”From Bin
Copy File to
Processor to
Update
Receive Mailed
Conditions
Log Conditions
on Log Sheet &
Deliver to U/W Asst.
Log on
Log Sheet
Roles ProcessVS.VS.
Measures
PS I O C
ProcessMap
Suppliers Inputs Process Outputs Customers
CTQs CTQsCTQs CTQs
Measures
Prepared by Dr. Leonard R. HeppAll Rights Reserved
4. Trend Charts
ProcessPerformance
(Y)
Process Variable (X)
ProcessPerformance
(Y)
Process Variable (X)
Scatter Diagrams
Run Charts
Time Series Charts
Volume (00)
1 3 5 7 9 11 13 15 17 19 21 23 25 27 29
14013012011010090807060
Weeks
VolumeVolume (# Units)
908070605040302010
40
35
30
25
Observation
Cyc
le T
ime
0.0890
0.9110 4.0000
59.6667
65.0000
0.1982
0.8018 4.0000
46.0000
50.0000
Approx P-Value for Oscillation:
Approx P-Value for Trends:Longest run up or down:
Expected number of runs:
Number of runs up or down:
Approx P-Value for Mixtures:
Approx P-Value for Clustering:Longest run about median:
Expected number of runs:
Number of runs about median:
Run Chart for Cycle Time
Prepared by Dr. Leonard R. HeppAll Rights Reserved
5. Check Sheets
ReceiveOrder
Cut @Service
Center
Yes
No
Cut @Service
Center
Cut FromDrop-off
Yes
No
Cut from
Drop-off
PerfectYield
Yes
No
Cut on FAB
Line
100%
Pattern
Yes
No
Cut on FAB
Line
YieldLoss Paid
for
Yes
No
Yield
Loss
< 1%No
Yes
Cut on FAB
Line
Cut on FAB
Line: Notify
Finance/Spreadsheet
Mfg Mgr
Approval
Yes
Cut on FAB
Line
No
Notify
Customer
Service
Cut fromQC-40
Yes
Cut on FABLine: Ensure
Coded for
Scrap Loss
No
Cut on FAB
Line
Usable
Drop
No
Yes
Send Drop to
ServiceCenter/
Prime Mat'l
Inventory
Salvage
g GE Electromaterials FABRICATION YIELDStep 12: Implement Process Controls
Controls Implemented to Maintain Level
1) Business decision to be made by the Champion (Manufacturing Manager) for any order which CPV will be greater than 1%
2) All loads that have a QC-40 (Dispositioned) are coded at scheduling toensure appropriate financial category for loss
3) All orders that customer is known to pay for the yield loss are removed from the CPV equation (GETEK is biggest pay-off)
4) All orders are tested for patterning regardless of cutting history
5) Implemented weekly Manufacturing Dashboard to ensure process maintains in control.
A IM C
Final CPV Process
Set up Clear Process Checks Process Process
Step Input Output Process
Specification (LSL,USL, Target)
Cpk / Date
(SampleSize)
Measurement
Technique
%R&R
P/T
SampleSize
Sample
Frequency
ReactionPlan
CurrentControlMethod
Prepared by Dr. Leonard R. HeppAll Rights Reserved
6. Risk Tools (FMEA/EMEA) FMEA Output
FunctionPart/Process
FailureMode
Effects+ Severity
(1-10)
Causes+ Occurrence
(1-10)
Controls+ Detectability
(1-10)
RPNContinuous
Improvement
Risk Priority Number (RPN)RPN=SxOxD = 1 to 1000
707051 H 22 BBSAW - 3
Potential Failure Modes And Effects Analysis
Worksheet
AppealApplication
Appeal
Committee
Incomplete
Missing
Members
Incorrect
Biased
Delay
Bad Decision
Bad Decision
Delay
Bad Decision
Bad Decision
5
8
8
5
8
8
• Sales Rep
• Sales Rep
Entry Error,
Business Travel,
CompetitionBudget Pressure
Rushed
Untrained
Research Error
Illness, vacation
8
8
5
10
10
3
1
1
9
1
1
5
40
64
360
50
80
120
• Clerk Checks
• Sign-Off By
Review By
Schedule M,F
Peer Review
Upon Receipt
Territory Mgr.
Territory Mgr.Create A List
Of CriticalChecks For
Territory Mgr.
JRK 2/16/97
Process/Product:FMEA Team:
Black Belt:
FMEA Date: (Original)(Revised)
Page: of
714
FMEA Process Action Results
Item/ProcessStep
PotentialFailure Mode
PotentialEffect(s) Of
Failure Sev
erity Potential
Cause(s) OfFailure
Occ
urre
nce
Det
ectio
n
RP
N RecommendedAction
ResponsibilityAnd TargetCompletion
Date
Total Risk Priority Number Resulting Risk Priority Number
ActionTaken
Sev
erity
Occ
urre
nce
Det
ectio
n
RP
NCurrentControls
Appeal Process 1/23/97
1 1
X1 X2 X3Process In-Line Measures
Outcome Measures
Y1
Y2
Customer Needs•••
Roles Process
X1 X2 X3
1
2 3 4
# Error Points
5
F.M.E.A. Roadmap
Function 1Function 1
Function 2Function 2
Function N..Function N..
PROCESSPROCESS
CompletelyFail
CompletelyFail
PartiallyFail
PartiallyFail
Failure Mode 1+ SEVere EffectFailure Mode 1+ SEVere Effect
Failure Mode 2+ SEVere EffectFailure Mode 2+ SEVere Effect
Failure Mode N..+ SEVere EffectFailure Mode N..+ SEVere Effect
IntermittantIntermittant
OverperformanceOverperformance
DegradationDegradation
Cause 1 +OCCuranceCause 1 +
OCCurance
Cause 2Cause 2
Cause N..Cause N..
Current ProcessControls &
DETectability
Current ProcessControls &
DETectability
ContinuousImprovementContinuous
Improvement
Error Opportunities at Key Steps
Linking Failure Modes to Effects
The relationship between the Failure Mode and the Effect is not always 1-to-1
The relationship between the Failure Mode and the Effect is not always 1-to-1
Failure Mode 1Failure Mode 1Effect 1Effect 1
Effect 2Effect 2
One Failure Mode can result in multiple effectsFailure Mode 1Failure Mode 1
Effect 1Effect 1
Effect 2Effect 2Failure Mode 1Failure Mode 1
Effect 1Effect 1
Effect 2Effect 2
One Failure Mode can result in multiple effects
Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2Effect 1Effect 1
Multiple Failure Modes can result in the same effect
Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2Effect 1Effect 1Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2Effect 1Effect 1
Multiple Failure Modes can result in the same effect
Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2 Effect 1Effect 1
Multiple Failure Modes occurring together can result in a single effect
Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2 Effect 1Effect 1Failure Mode 1Failure Mode 1
Failure Mode 2Failure Mode 2 Effect 1Effect 1
Multiple Failure Modes occurring together can result in a single effect
Error Points
Prepared by Dr. Leonard R. HeppAll Rights Reserved
7. Process Control Charts Variable orAttribute Data?
Defects or % Defective
Constant Lot Size?
uu pp
NoNo YesYes
Defects or Defective
cc npnp
High or Low Volume
Individuals &MovingRange
X-Bar &Range
Variable/Continuous
Variable/Continuous
Attribute/DiscreteAttribute/Discrete
LowLow HighHigh
Upper Control Limit (average +3)
Lower Control Limit (average -3)
Centerline (process average or average variability)
Upper Control Limit (average +3)
Lower Control Limit (average -3)
Centerline (process average or average variability)
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Data Trending Downward or UpwardSix or More Data Points in a Row
A Run of Nine or More Data Points in a RowOn Either Side of the Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
One or More Data PointsAbove The UCL or Below the LCL
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Centerline
Upper Control Limit
Lower Control Limit
Process Out of Control … Assignable Cause Events
0 10 20
0
1
2
3
Sample Number
Sa
mp
le C
ou
nt
U=1.189
3.0SL=2.345
-3.0SL=0.03241
0 10 20
0
1
2
3
Sample Number
Sa
mp
le C
ou
nt
U=1.189
3.0SL=2.345
-3.0SL=0.03241
Continuous Data Discrete Data
Product Quality vs Goal
100% 100.00%
93.00%
88%
90%
92%
94%
96%
98%
100%
June July Aug Sep
Pro
d Q
ual
% Prod Qual
Goal
0
25
60 75
90
On-Time Shipment
100
Now
Goal
Communications
0
25
60 75
90
Product Quality
100NowGoal
g GE Electromaterials Altron Dashboard
0
25
60 75
90
Documentation
100
Now
Goal
0
25
60 75
90
Packaging
100Now
Goal
On-Time Shipment Trend Documentation Trend Packaging Trend Product Quality Trend
Fail
Pass
Key
On-time( +5,0)
GETEK®
Pre-preg
GETEK®
M/L
Vacuum
Quantity
Meet Spec
Prepeg Test Dates
Color
Consistency
• Thickness• Copper
• Stamping• Diametric
Correct Mat’l
Certs (CSC)
Labels
Customer
Service
• Response Time
• Confirmation by 3:00pm
• Responsiveness
39%
Aug 1997
36 59
19 24
17 35
59
59
59
1
0
0
59
59
0
0
59
59
0
0
59
59
0
4
98.5%
100%
Issue Resolution
Corrective Actions (CAR)
Process Owner Status
1. On-Time Delivery 2. Labels
NoonanFerguson
In Process
In Process
Tech
Service
93%
OTS vs Goal
29%33.00%
39.00%
0%
20%
40%
60%
80%
100%
June July Aug Sep
OT
S % OTS
Goal
Documentation vs Goal
100%
92.00%
98.50%
88%
90%
92%
94%
96%
98%
100%
June July Aug Sep
Do
cum
enta
tio
n % Document
Goal
Packaging vs Goal
100%
92.00%
100.00%
88%
90%
92%
94%
96%
98%
100%
June July Aug Sep
Pac
kag
ing
%
Packaging
Goal
Customer Dashboards