Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of...

7
Prepared by AHMED AL-MAIMOUNI

Transcript of Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of...

Page 1: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

Prepared byAHMED AL-MAIMOUNI

Page 2: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- OUTLINE -PROCESS OF CHANGING ALARM TE14

Introduction

Process Of Request Changing Alarm TE 14

Quality Tools Used For Improvement

Flow Chart Improvement

Page 3: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- Introduction -PROCESS OF CHANGING ALARM TE14

The purpose of this procedure is to assure that

a sufficient review is made when changes,

including additions or deletions, are proposed

for existing process control systems that affect

either the efficient operation of the plant, the

safety of personnel, or the protection of plant

equipment.

Page 4: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- Process Of Request Changing Alarm TE 14 -PROCESS OF CHANGING ALARM TE14

Page 5: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- Process Of Request Changing Alarm TE 14 -PROCESS OF CHANGING ALARM TE14

Initial ChangeRequest Form

TE14

Type of Change Required

Initiator fill Sec.1and route for required

Primary Contral Change approval

Area CS Engineer review the required

change and complete Sec.2

Route change form to analyzer or custody meter engineer for approval and

awareness (1)

Primary Control Change

Does the change involve

analyzer or custody meter?

Page 6: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- Quality Tools Used For Improvement -PROCESS OF CHANGING ALARM TE14

Brainstorming

Page 7: Prepared by AHMED AL-MAIMOUNI. - OUTLINE - PROCESS OF CHANGING ALARM TE14 Introduction Process Of Request Changing Alarm TE 14 Quality Tools Used For.

- Improvement FLOW CHART -PROCESS OF CHANGING ALARM TE14

Initial ChangeRequest Form

TE14

Type of Change Required

Initiator fill Sec.1and route for required

Primary Contral Change approval

Route the Form to area CS Engr. for review

Primary Control Change

Is the feasible and agreed up

on?

Return form to initiator