PREPARATION OF DER FOR SEWERAGE FOR ULBS
Transcript of PREPARATION OF DER FOR SEWERAGE FOR ULBS
SEWERAGE CIRCLE, THIRUVANATHAPURAM1
SEWERAGE CIRCLE, KOCHI2
SEWERAGE CIRCLE, TRICHUR3
SEWERAGE CIRCLE, KOZHIKODE4
SEWERAGE, PPD & WASCON - DETAILS OF OFFICES
3
SBM 2.0 - DER FOR MUNICIPALITIES
ERNAKULAM7•KOCHI•ALUVA
IDUKKI6•THODUPUZHA• KATTAPPANA
KOTTAYAM5•ETTUMANOOR•EARATTUPETTA
ALLAPUZHA4•ALLAPUZHA•CHERTHALA
PATHANAMTHITA3•PANDALAM•THIRUVALLA
KOLLAM2•KOTTARAKKARA•PARAVOOR
TRIVANDRUM1•NEYATTINKARA•VARKALA
KANNUR•PAYYANNUR•THALASSERY
WYANAD•SULTHAN BATHERI•MANANTHAVADI
KOZHIKODE•VATAKARA•KOYILANDY
MALAPPURAM10•MALAPPURAM•PONNANI
PALAKKAD9•PALAKKAD•PATTAMBI
THRISSUR8•THRISSUR •WADAKKANCHERY
KASARGOD•KASARAGOD•KANHANGAD
11
12
13
14
TVM
ERM
TCR
KZD
Reconnaissance Survey
Step One
Digitalization with levels from Google Earth
Step Three
Topographical Survey of salient/control points & social surveying.
Step Five
Detailed Estimate
Step Seven
Preliminary Engineering Report
Step Two
Preliminary design usingGIS data with SWMM.
Step Four
Final Design with SWMMand preparation of drawing.
Step Six
Final Preparation of DPR
with EIA
Step Eight
ACTIVITIES IN DER PREPARATION
10% 15%
25% 40%
60% 80%
100%90%
15.4.21
31.7.21
25.8.21
25.9.21
31.10.21
Reconnaissance
Survey & PER
Digitalization with levels from Google Earth & Preliminary design
using GIS data with SWMM.
Topographical
Topographical Survey of
salient / control points
and social surveying /
control point
Final Design with
SWMM and
preparation of drawing
Detailed Estimate &
Final Preparation of
DPR with EIA
Timeline of Main Activities
WHERE WE STAND NOW
05
04
03
02
01
Final Design, Detailed Estimate
Final Preparation of DPR with EIA
Social surveying
Topographical Survey of salient /
control points
Digitalization with levels from Google Earth Preliminary design using GIS data with SWMM.
Reconnaissance Survey & PER
0%
100%
45%
30%
0%
Roadmap and Issues which require focus
2016Detailed Estimate &
Final Preparation of
DPR with EIA
31.10.21
Final Design with
SWMM and preparation
of drawing
25.9.21 High End Laptops
required. Addressed HO
Topographical Survey
of salient / control
points and social
surveying
25.8.21AS for DGPS
Survey required.
Addressed RKI
Digitalization & Preliminary design using GIS data with SWMM drawing
31.7.21Reconnaissance
Survey & PER
15.4.21
STATUS OF LAND FROM LSGs
For STPs – 59 Nos For Collection Well / Lifting Station – 317 Nos
10
A- Resolution issued, B - Agreed in principle C - To discuss in council and finalise D - To discuss
ACS, LSGD addressed to issue direction to LSGs for issuing ResolutionPriority – Government land, Avoid wet land, Minimise land acquisition
CLICK FOR MORE DETAILS
SUGGESTIONS / ACTIONS NEEDED
• HIGH END COMPUTERS / LAPTOPS (33 Nos) REQUIRED– Addressed HO, Action Initiated
• DGPS SURVEY OF CONTROL POINTS TO BE OUTSOURCED– DPR prepared and submitted to RKI for AS, Recommended to HLC
• DIRECTION TO ISSUE RESOLUTION FOR LAND BY LSGD REQUIRED– Addressed ACS, LSGD for directing LSGs
• MORE TRAINING SESSION / AWARENESS REQUIRED – Choice of Appropriate Technology and Design of STP
– Preparation of EIA
• AE, KASARGOD TO BE FILLED– Included in draft list
11