Preparation for station five
-
Upload
leo-huffman -
Category
Documents
-
view
9 -
download
2
description
Transcript of Preparation for station five
![Page 1: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/1.jpg)
Takashi MatsushitaOn behalf of IC/Brunel team
Imperial College
T. Matsushita 1
Preparation for station five
Construction/bundling/connectorisation
![Page 2: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/2.jpg)
T. Matsushita 2
Bundling New comb ready:
Comb in use
Fibres trimmed on rubber sheet with cutter knife:- align centre fibre on horizontal white line- trim fibres along vertical white line
QA image for one connector(# of fibres in a bundle)
Cut surfacePolishedsurface
![Page 3: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/3.jpg)
T. Matsushita 3
Connectorisation Bridge ready:
Bridge in use
Fibre radius guide during connectorisation
QA image for one connector(# of fibres in a hole)
![Page 4: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/4.jpg)
T. Matsushita 4
Check sheet – in preparation
![Page 5: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/5.jpg)
T. Matsushita 5
Light source LED survey finished:
EG-5UV405-15 from ETG Inc.- Peak 405 nm, range 400-410 nm- 12 mW output
now in hand.
Optics:- spherical lens for collimation is ready- cylinder lens for focusing is ready- preparing mount for lens- needs mechanical slits
![Page 6: Preparation for station five](https://reader036.fdocuments.us/reader036/viewer/2022062719/5681321c550346895d987ca6/html5/thumbnails/6.jpg)
T. Matsushita 6
Mechanical Connector:
patch-panel connector for external waveguide revised to have gland
URGENT:- go-nogo gauge to be made- station connectors to be made
Carbon-fibre station- needs to be machined for connector holes
Doublet-layer- want the first doublet-layer as soon as it is ready so that we can start work during manufacturing of the second/third doublet-layers.
That’s all!