PREMIUM FIBA-DEK - InnoArc

21
SMART CLIP FIXING INSTALLATION MANUAL DB14025 IMPORTANT : All INNOWOOD products must be installed in strict accordance with INNOWOOD’S latest (at time of installation) “INSTALLATION MANUAL” and “CARE AND MAINTENANCE GUIDELINES” which can be downloaded from our website : www.innowood.com. Failure to comply with these documents may void warranty and result in an unsatisfactory outcome. PREMIUM FIBA- DEK - INSTALLATION MANUAL - V4 - APR 2020 PREMIUM FIBA-DEK®

Transcript of PREMIUM FIBA-DEK - InnoArc

Page 1: PREMIUM FIBA-DEK - InnoArc

1

SMART CLIP FIXING INSTALLATION MANUAL

DB14025

IMPORTANT : All INNOWOOD products must be installed in strict accordance with INNOWOOD’S latest (at time of installation) “INSTALLATION MANUAL” and “CARE AND MAINTENANCE GUIDELINES” which can be downloaded from our website : www.innowood.com. Failure to comply with these documents may void warranty and result in an unsatisfactory outcome.

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

PREMIUM FIBA-DEK®

Page 2: PREMIUM FIBA-DEK - InnoArc

2

BEFORE YOU COMMENCE

It is the responsibility of the specifier or other party to ensure that the information in this manual is appropriate for the intended application and further design detailing may have to be made for specific applications that fall outside the scope of the manual.

Information contained on this document is the copyright of INNOWOOD Australia Pty Ltd. Use or copying of this document in whole or in part without the written permission of INNOWOOD Australia is not permitted.

PREMIUM FIBA-DEK SPECIFICATION

Please note that:

The Product is subject to natural variation* in finish as part of the manufacturing process. The purchaser or their installer/builder is responsible for inspecting, prior to installation, the colour, finish and size of the product, identifying whether the Product has any other defect or manufacturing fault, and for ensuring the Product meets surface appearance and product specification requirements. Subject to the terms of our warranty, INNOWOOD is not liable for claims made after the installation of the Product that relate to surface appearance and product specification.

*INNOWOOD product is made predominantly from timber waste, colour will vary up to +/-20% according to the timber used in itsmanufacture.

NOTE: *These are maximum spans howevershorter spans may be required dependenton region and wind load, please confirmw i t h s t r u c t u r a l e n g i n e e r p r i o r t oinstallation.

PRODUCT CODE

COVERAGE

SPAN CENTRES* RESIDENTIAL

SECTION

PROFILE

SPAN CENTRES* COMMERCIAL

HIDDEN CONNECTORS( CLIP CODE PL14025 )

STANDARD BOARD LENGTH

DB14025

146mm

400mm

350mm

4500mm

6mm gaps between boards

STARTER CLIP

FASCIA TRIM

ACCESSORIES

FINISHING TRIM

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 3: PREMIUM FIBA-DEK - InnoArc

3

New Patented Decking Solution

Premium FIBA-DEK System is a revolutionary composite product that utilises a new patented technology, which fuses two Fibre glass layers during the production process, within the co extruded wood composite material layers.

This patented technology enhances the rigidity, durability and toughness of the decking board to achieve better performance by significantly minimising the boards thermal movement at different temperatures. The graph below illustrates the thermal movement of Premium FIBA-DEK. These performance figures were generated from our factory testing results and show the superior minimal thermal movement of Premium FIBA-DEK. The results shown below might slightly vary depending on the external conditions.

Premium FIBA-DEK looks and feels like natural timber and is available in four colours with an embossed finish to aid in slip performance but also to create the beautiful surface expected in a premium quality timber decking .

Premium FIBA-DEK pre-finished boards are water, termite and fungus resistant with the added benefits of easy care and low maintenance.

Premium FIBA-DEK decking is perfect for rooftops, courtyards, walkways, Pool areas, Schools, Child Care, Aged Care, residential balconies and other public spaces.

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 4: PREMIUM FIBA-DEK - InnoArc

4

Circular Saw

Crosscut Mitre Saw Level & Chalk Line

Cordless Drill

Carpenters Square Tape Measure

Installation Tips and RequirementsINNOWOOD products can be worked with ordinary woodworking tools such as:

INNOWOOD boards should not be stored in the open or covered or wrapped with plastic sheet. INNOWOOD boards are a finished product, do not dump or drop when loading or unloading. Always handle with care.

INNOWOOD boards should be stored under cover and protected from the elements (including direct sunlight and rain) until ready to install. Remove any plastic wrap including shrink wrap and store on a dry and flat surface supported at max. 450mm centres.

When removing INNOWOOD boards from the pack, do not slide boards against each other, lift the boards and set them down carefully.

INNOWOOD boards should be carried on their edge for better support.

When handling INNOWOOD boards take care to avoid scratches, nicks and other damage to the boards.

NOTE:To ensure long- term performance, we recommend that a professional trade person carry out the installation. The installation MUST be carried out in accordance with these instructions including the use of all trims and accessories.

Thermal movementAny wood based products will expand and contract with changes in temperature. The amount of expansion varies according to the amount of change in temperature. Although thermal movements are reversible, these movements due to temperature change may vary by up to 1mm per meter on this Premium FIBA-DEK decking during the installation process. This might slightly vary depending on the external conditions.

INNOWOOD boards that have been exposed to direct sun for several hours, prior to installation will have expanded more than boards left in the shade. It is important to maintain an average consistent temperature for all boards as they are being installed.

Avoid installing in full sun if ambient temperature is above 30°C. However if this cannot be avoided ensure the boards are kept out of the sun until installed to limit the boards expansion prior to installation. Premium FIBA-DEK can tolerate a temperature range from -30°C to +80°C.

If the product is to be used in an environment outside of this temperature range, please consult INNOWOOD.

Please bear in mind that:

Where INNOWOOD boards are to be screw fixed, clearance holes must be pre-drilled before fixing (both INNOWOOD boards and accessories).

The clearance hole to be drilled must be slightly greater than the outside screw thread diameter.

Screws must be minimum 15mm but maximum 25mm away from board edges (unless noted otherwise)

INNOWOOD products must not be used for any structural purpose.

The cut surface must be sealed with a layer of protective coating such as a water based deck sealer before installation.

When exposed to direct sunlight, surface temperature may be significantly hotter than ambient temperature.

450mm

CTRS

UNDER COVER

Note : Please ensure to wear the safety glove and mask during the cutting process.

Site storage & Product Handling

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 5: PREMIUM FIBA-DEK - InnoArc

5

Design Considerations

Expansion/ Contraction - Premium FIBA-DEK boards will expand and contract slightly with changes in temperature. The maximum amount of expansion and contraction that may occur is 0.3-0.5mm per lineal metre of board. This should be taken into account when designing board layout.

For extreme temperatures, where the board temperature is above 80°C then please contact INNOWOOD for further details.

Screws

Screws must comply with AS 3566 Self Drilling Screws for the Building and Construction Industries.

Screws must have a minimum Class 3 corrosion resistance, suitable for external applications in mild, moderate industrial and marine environments and Class 4 or stainless steel for severe environments.

Screws with class 1 or 2 corrosion resistance may be used for internal use depending on the individual application.

Wafer Head

Decking/ Type 17

CountersunkHead

Self-drilling Self-tapping

Bugle Head

Framing Construction Requirements

All building codes and Australian Standards must be adhered to when building the structural support framing for any deck. Be sure to consult with a licensed builder, architect or engineer prior to designing or building your deck to ensure the regulations are met for such criteria as the stress grades, size and spans of posts, bearers and joists and other structural elements. For specification and design of commercial or industrial applications refer to AS1170: Dead and Live Loads and Load Combinations.

Premium FIBA-DEK should be fixed to seasoned timber joists or to a proprietary structural system.

Joist spacing for Premium FIBA-DEK is nominally set at 400mm centres max for residential and 350mm centres max for commercial applications in urban and non- cyclonic wind load areas. For higher wind-load areas reducing joists may be required. All boards must span across a minimum of 3 joists.

As with all decking products the adequacy of a proposed installation should always be checked by a qualified engineer.

Joists must have a face not less than 45mm for timber and 38 mm for steel.

Additional joists must always be set between the 1st & 2nd joist at each end of deck. Where butt joints occur, framing must be “Blocked Out “ with 190 x 45mm timber blocks with 190mm face upwards.

Timber Framing

The joints between posts, bearers and joists need to be able to transfer load efficiently through the structure, refer to AS1684 for design of these elements.

It is important to use adequately seasoned timber to minimise shrinkage and associated building movement which may damage the decking system.

Steel FramingSteel framing must comply with AS/NZS 4600: Cold- Formed Steel Structure or AS 3623: Domestic Metal Framing.

Where steel framing members are specified, use only corrosion resistant galvanized steel framing.Specific instructions for fixing to steel frames are included where appropriate.

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 6: PREMIUM FIBA-DEK - InnoArc

6

Framing Design Requirements

* TYP= MAXIMUM 350mm (COMMERCIAL) MAXIMUM 400mm (RESIDENTIAL)

TOP VIEW

190 x 45mm TIMBER BLOCK

# 14 x 100mm BUGLE HEAD SCREW x 4EA PER BLOCK

JOIST

45 mm

BUTT JOINT LOCATION

TIMBER BLOCK AT ALL BUTT JOINT LOCATIONS

A A

(TYP ÷2) (TYP ÷2) (TYP ÷2) (TYP ÷2)

ADDITIONAL JOIST AT EACH END OF DECK

TYP TYP TYP TYP TYP TYP TYP

JOIST

SECTION A-A

190

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 7: PREMIUM FIBA-DEK - InnoArc

7

Allowable long term uniformly distributed load (kPa), is limited by the allowable bending strength of the Premium FIBA-DEK and should not exceed the loads per support span, as shown in the table below.

The allowable concentrated live load (kN), is limited by the deflection of the Premium FIBA-DEK between the supporting joists, and should not exceed the maximum loads, as shown in table.

Refer AS/NZS 1170.1 section 3

Joist Spacing and Loading

Joist or batten spacing for Premium FIBA-DEK is nominally set at maximum 400mm centres for residential and 350mm centres for commercial.

Dimensions Table:

Uniformly Distributed Load (kPa)

3

Concentrated Load (kN)

1.8

Description

“a” min dis. to solid structure

Millimetres

2mm

“b” max joist centres

“c” min ground clearance

“d” min dis. to solid structure at board end

350mm Commercial 400mm Residential

50mm

2mm

“e” gap at butt joints 2.5-3mm

e

* VentilationPremium FIBA-DEK requires ventilation, which can be achieved by allowing a min. 50mm ground clearance. This will prevent the decking from over heating and causing any distortion to the boards.

d

c

a

b÷2 b

TYPICAL

TIMBER BLOCK AT ALL BUTT JOINTS

50mm MIN GROUND CLEARANCE FOR AIR CIRCULATION

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 8: PREMIUM FIBA-DEK - InnoArc

8

Butt Joint Requirements

- All butt joints must be set as indicated in the fig. above.- Butt joints must always be blocked out underneath with a 190 x 45mm timber block and

be fixed of with connectors as shown.- Failure to follow the above may result in excessive movement and / or board distortion.

2.5-3mm

190 x 45mm TIMBER BLOCK

BUTT JOINT LOCATION

IN CENTRE OF BLOCK

HIDDEN CONNECTOR

SINGLE CLIP AT BUTT JOINT

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 9: PREMIUM FIBA-DEK - InnoArc

9

CHOOSE STARTER / FRAMING OPTION 1STEP

Considerations

- All boards must be full width boards (no rippedboards) otherwise finishing trim must be used onripped boards.

- Can be used around full Perimeter of deck.

- if being used up against wall then decking must startfrom wall & work out. Also in this case bottom 2 legsof trim must be removed (for trim against wall only).

- Allows Seamless transition with fascia boards.

- When used against board ends small leg must first beremoved.

- Must be installed before boards.

WALLFASICA TRIM

FINISHING TRIM ( 2 PEICE )

Remove these 2 legs if using up against a wall

Remove this leg when using against board ends

Remove this leg when using against final board

OPTION 1: FASCIA FRAMING

Considerations

- Can be used around full perimetre including rippedboards and irregular shapes.

- Does not accommodate fascia boards.

- Must be installed after boards.

- Can be used in conjunction with fascia trim eg. fasciatrim on 3 sides & finishing trim on the wall side.

OPTION 2: STANDARD FRAMING

WALL FINISHING TRIM

JOIST / FRAMING

FINISHING TRIM

Considerations

- Can be used on starting side only (including if startingagainst wall).

- Clips are approx 45mm long (not continuous)

- Must be used at every joist position for starting board.

- Finishing board must incorporate fascia or finishingtrim or alternatively by face fixed at max 400mmcentres.

OPTION 3: STARTER CLIP

WALLFINAL BOARD

JOIST / FRAMING

FIRST BOARD

STARTER CLIP

FACE FIX SCREW

20-25mm

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 10: PREMIUM FIBA-DEK - InnoArc

10

Cut fascia trim to form a frame around 3 sides of deck using mitre cuts at corners.

For fascia trims at ends of deck only remove short horizontal leg of fascia trim by holding with vice grips & tearing away as shown in Fig A .

Pre-drill & countersink trims at maximum 400mm centres to suit structure & screw down taking care to sink screws as flush as possible.

1.

NOTE:Ensure all butt joints are blocked with 190 x 45mm timber as indicated under “ framing design requirements.” Butt joints must be positioned in centre of block as indicated under “butt joint requirements” .

INSTALLATION PROCEDURENote: - The example show is a 3 sided deck which finishes up against a wall

STEP 2

INSTALLING FASCIA TRIM

2.

3.

JOISTS

1/2

TYPICALTYPICAL

TYPICAL

FASCIA TRIM

MITRE CUT AT CORNER

WALL

A

A

FASCIA TRIM

SECTION A-A

REMOVE THIS LEG FOR TRIM AT ENDS OF DECK

FIG. A

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 11: PREMIUM FIBA-DEK - InnoArc

11

INSTALLNG FIRST BOARD

3STEP

FIRST BOARD

SCREW TYPES REQUIRED:

Metal

Seasoned Timber

Continuous Alum Trim & Starter Clip Screw

#8 x 20mm CSK Self-drilling Screw

8g ×25mm CSK Timber Screw

Joist Type Hidden Connector Screw

#7 Screws as supplied by INNOWOOD

#7 Screws as supplied by INNOWOOD

Face Fix Screw

#10 x 40mm Self-drilling CSK Wing Tip Screw

#10 x 50mm CSK Type 17 Screw

Cut first board to required length using dropsaw observing required clearances as show on Page 7.

Set board on joists an push hard up against outside fascia trim.

Align hidden connectors with each joist and press into board groove until fully engaged.

Insert screws into connectors however do not fully tighten at this stage.

5.

6.

4.

7.

NOTE:Connectors must always be used at all joist and butt joint locations.

HIDDEN CONNECTORCODE: PL14025

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 12: PREMIUM FIBA-DEK - InnoArc

12

INSTALLING SECOND BOARD

Cut & sit 2nd board in position & then press into hidden connectors until fully engaged.

Align the next row of hidden connectors with joists & press into board groove until fully engaged.

Insert screws into hidden connectors however do not tighten.

Now tighten hidden connectors between 1st & 2nd board.

4STEP

8.

9.

10.

11.

PREMIUM FIBA-DEK DB14025

WALL

HIDDEN CONNECTORPL14025

FASCIA TRIM

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 13: PREMIUM FIBA-DEK - InnoArc

13

INSTALLING REMAINING BOARDS

Repeat step 4 until only last board is to be installed.12.

5STEP

SINGLE CONNECTOR AT ALL BUTT JOINTS

TIMBER BLOCK AT ALL BUTT JOINTS

NOTE:Ensure all butt joints are blocked with 190 x 45mm timber as indicated under “ framing design requirements.” Butt joints must be positioned in centre of block as indicated under “butt joint requirements” .

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 14: PREMIUM FIBA-DEK - InnoArc

14

INSTALLING LAST BOARD

Cut last board to length and rip down in width if required leaving a 16-18mm gap between board edge & wall.

Sit last board in position & press into last row of hidden connectors until fully engaged.

13.

14.

6STEP

LAST BAORD

16-18mm

RIP LAST BOARD DOWN IF REQUIRED

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 15: PREMIUM FIBA-DEK - InnoArc

15

INSTALL FINISHING TRIM AGAINST WALL

7STEP

Cut both sections of finishing trim to length to fit neatly neatly between end fascia trims.

Pre-drill and screw ( at max 400mm CTRS ) base of finishing trim to joists with horizontal leg sitting on top of final board.

Press cover strip of finishing trim into base until it clicks in & is fully engaged.

15.

16.

17.

FINISHING TRIM COVERWALL

FINISHING TRIM SCREW

400mm

TRIM BASE FINISHING

FINISHING TRIM

FINISHING TRIM BASE

LAST BOARD

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 16: PREMIUM FIBA-DEK - InnoArc

16

INSTALL FASCIA BOARDS - OPTION 1

8aSTEP

For any 90º fascia corners it is best to use the fascia trim vertically as shown in Fig 1.Be sure to fix these vertical fascia trims prior to fascia boards.

To install 1st fascia board cut to length & press upwards until hard up against fascia trim.

Now insert & screw off hidden connectors to bottom edge of fascia board ( do not tighten ).

Add each subsequent fascia board in this same sequence until complete leaving 15mm clearance below bottom edge of final fascia board to allow clearance for finishing trim.

Install finishing trim as per step 7 below final fascia board mitre cutting around any corners.

18.

19.

20.

21.

22.

FASCIA TRIM USED VERTICALLY

- TOP OF LEGS WILL NEED TO BE NOTCHED 26-30mm TO AVOID LEGS ON HORIZONTAL FASCIA TRIM.

- SHORT LEGS WILL NEED TO BE REMOVED.- CUT 25mm SHORT OF DESIRED FINISH POINT AT UNDERSIDE OF

FINISHING TRIM.

25mm

FASCIA BOARD

DECKING BOARDS

FINISHING TRIM

FASCIA TRIM

FIG. 1

FASCIA TRIM

1ST FASCIA BOARD

HIDDEN CONNECTOR

15mm

FINISHING TRIM

26-30mm

NOTCH BOTH TOP LEGS

With aluminium fascia trim & finishing trim

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 17: PREMIUM FIBA-DEK - InnoArc

17

#10x65mm DECKING SCREW AT MAX 350mm CTRS

FASCIA BOARD

DECKING BOARD

#10x65mm DECKING SCREW AT MAX 350mm CTRS

DECKING CLIP & SCREW @ MAX 350mm CTRS TYPICAL

TIMBER FRAMING

28mm

45mm

28mm 2mm

INSTALL FASCIA BOARDS-OPTION 2

8bSTEP

Tradition face fixed fascia

INSTALL FASCIA BOARDS-OPTION 3 With aluminium angle capping trim

#10x65mm DECKING SCREW AT MAX 350mm CTRS

35x35x2mm (OR 40x40x3mm) ALUMINIUM ANGLE CAPPING TRIM

DECKING BOARD

DECKING CLIP & SCREW @ MAX 350mm CTRS TYPICAL

TIMBER FRAMING

28mm

45mm

Min 6mm Cover

2mm

FASCIA BOARD

FACE FIXED ALUMINIUM ANGLE CAPPING TO FASCIA BOARD

CONSTRUCTION ADHESIVE

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 18: PREMIUM FIBA-DEK - InnoArc

18

As the FIBA-DEK decking is a finished product, it must be protected from scratches and marks during and after installation and from any other site construction activity.

We recommend the following during construction where possible:

• All foot traffic is avoided or limited to only clean footwear that is free from abrasive objects such as

dirt, sand, rocks, glass etc.

• If foot traffic cannot be avoided, then the deck should be swept clean to remove dirt and other

abrasive material and a breathable membrane cover be place over the deck but there must be

adequate ventilation between the covering and decking. Do not completely seal the covering to the

deck and if possible, the covering should be removed daily.

• Do not drag or place heavy items or construction materials on the deck.

We recommend the following during use:

• Always protect the deck from furniture legs etc by using protective pads such as self-adhesive pads.

• Sweep regularly to remove dirt, sand and other abrasive materials.

• Beware of rocks or glass that can be lodged in the soles of shoes that can cause significant

scratches.

• Never drag objects across the surface, always lift and set them back down.

• Hard plastic wheels on furniture or appliances can scratch if they are not pushed in the correct

direction.

STEP 9

PROTECTION & PRECAUTIONS

ENSURE CLEAN FOOTWEAR ONLYLIMIT FOOT TRAFFIC PROTECT BUT ALLOW TO BREATHE

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 19: PREMIUM FIBA-DEK - InnoArc

19PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

INNOWOOD PREMIUM FIBRE DECK

Butt Joint Requirements

- Face Fix Install

- All butt joints must be set as indicated in the fig. above.- Butt joints must always be blocked out underneath with a 190 x 45mm timber block and be

fixed of with connectors as shown.- Failure to follow the above may result in excessive movement and/or board distortion.

FIXING DETAIL AT WALL

2.5-3mm

190 x 45mm TIMBER BLOCK

BUTT JOINT LOCATION IN CENTRE OF BLOCK

FACE FIXING SCREW

350mm CTRS

25mm15-

30mm

A

A30mm

30mm

30mm

15-25mm

SECTION A-AButt Joint Detail

190 x 45mm TIMBER BLOCK

# 14 x 100mm BUGLE HEAD SCREW x 4EA PER BLOCK

JOIST

45 mm

WALL

JOIST / FRAMING

FINAL BOARD

FACE FIX SCREWFIRST BOARD

30mm3mm Gap3030

NOTE:All screws must be pre-drilled and countersunk.

30m

m

30m

m

Page 20: PREMIUM FIBA-DEK - InnoArc

20

NOTES

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020

Page 21: PREMIUM FIBA-DEK - InnoArc

21

FOR MORE INFORMATION, PLEASE VISIT INNOWOOD AT

WWW.INNOWOOD.COMOR CALL 1300 787 717

PREMIUM FIBA-DEK - INSTALLATION MANUAL - V4 - APR 2020