Preliminary Hydrogeologic Evaluation Part #1
Cedar Ridge EstatesApplication for Comprehensive Permit
Under MGL Ch40B Residential Development
www.greenviewrealty.com
Green View Realty, LLC189 Hartford Avenue, Suite 2-1
Bellingham, MA 02019
Owner/Project Manager:Green View Realty, LLC
Bellingham, MA
Architect:Egnatz Associates, Inc.
Bolton, MA
Attorney:Rubin & Rudman LLP
Boston, MA
Engineer:Coler & Colantonio, Inc.
Norwell, MA
www.greenviewrealty.com
Preliminary Hydrogeologic Study
Completed Tasks:
• Town Records, Multiple Departments
• DEP File Review
• Historic Bird Property Reports
Projected Tasks:
• Installation of monitoring wells in proposed treatment area,
• Survey of existing wells (on both the Former Bird Property and surrounding properties),
• Sampling of new and some of the surrounding wells, and
• Development of a groundwater flow & projected mound analysis models.
Page 3, Paragraph (g)
Taken from: Mass GIS Oliver
Site Boundaries & WWTF Location Approximate
Well No. 4 ~1.7 miles from Site Well No. 3
~1.9 miles from Site
LocusCEDAR RIDGE ESTATES
Locus PlanHolliston, Massachusetts
B1
B10
B9
B2
B3
MW-1
B6
B
B’`
B8
5
iEP Inc. 1988 Groundwater Quality Monitoring Wells of
the Cedar Brook Aquifer
Well No. 4 ~1.7 miles from Site Well No. 3
~1.9 miles from Site
B1
B10
B9
B2
B3
MW-1
B6
B7
B4
iEP Inc. 1988 Groundwater Quality Monitoring Wells of
the Cedar Brook AquiferA
B
B’`
Bedrock
Sand & Gravel
Water Table Elevation
B1MW-1Town
Well 4
B8
B5B5
B8
B6B7 B9
B3
B10B1
Town Well 4 Town
Well 3
BedrockSand & Gravel
Peat
Water Table Elevation
• All 10 monitoring wells installed by iEP were sampled for VOCs in July and October 1988
• No VOCs were detected in any of the wells except B2
• iEP concluded that the low levels of TCE and toluene in B2 were most likely attributable to a nearby septic system
• Method 3 Risk Characterization prepared by Weston & Sampson Engineers, Inc. in 2001 for the Town of Holliston Marshall Street Landfill
• An elevation survey of 4 wells located in the vicinity of the landfill, indicated that groundwater flow is easterly toward the wetlands
• VOCs were not present above detection limits, except for 1,2,4-trimethylbenzene which was detected in only one of the wells
B1
B10
B9
B2
B3
MW-1
B6
B7
B4
iEP Inc. 1988 Groundwater Quality Monitoring Wells of
the Cedar Brook AquiferA
B
B’`
B8
B5