Preliminary Design Options - New Hope-Solebury Middle School · 2014. 2. 20. · GODSHALL KANE...

11
GODSHALL KANE O’ROURKE ARCHITECTS, LLC 12 East Butler Avenue, Suite 205, Ambler, PA 19002 T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com New Hope-Solebury School District High School Revitalization Plan Preliminary Design Options February 17, 2014

Transcript of Preliminary Design Options - New Hope-Solebury Middle School · 2014. 2. 20. · GODSHALL KANE...

  • GODSHALL KANE O’ROURKE ARCHITECTS, LLC

    12 East Butler Avenue, Suite 205, Ambler, PA 19002

    T: 215.646.2003 F: 215.646.5707 www.gkoarchitects.com

    New Hope-Solebury School District

    High School Revitalization Plan

    Preliminary Design

    Options February 17, 2014

  • Page: 2

    New Hope-Solebury School District Design Options

    Existing Building:

    Lower Level

  • Page: 3

    New Hope-Solebury School District Design Options

    Existing Building:

    Upper Level Plan

  • Page: 4

    New Hope-Solebury School District Design Options

    Design Option 1:

    Lower Level Plan

    New Gymnasium / Fitness

    Center / Wrestling Room

    Improved & Secure Public

    Access

    Secure Entrances

    No Exterior Circulation for

    Students

    New Large Group

    Instruction

    Expanded Art Room

    Moves one Music Room

    Infrastructure

    Improvements

  • Page: 5

    New Hope-Solebury School District Design Options

    Design Option 1:

    Upper Level Plan

    Additional Second Floor

    Classrooms

    Replace existing

    rooms that are not

    accessible

    New Computer Lab

    New TV Studio

    Instructional Planning

    Centers

  • Page: 6

    New Hope-Solebury School District Design Options

    Design Option 2:

    Lower Level Plan

    New Fitness Center /

    Wrestling Room

    No Exterior Circulation

    for Students

    Infrastructure

    Improvements

    No improvement to:

    Size of MS Gym

    Public Access

    Security of Entry

    Large Group Instruct.

    Non-accessible CRs

    Music Room

  • Page: 7

    New Hope-Solebury School District Design Options

    Design Option 3:

    Lower Level Plan

    Enclose Link

    Infrastructure

    Improvements

    No other improvements

    to the Building

  • Page: 8

    New Hope-Solebury School District Design Options

    Other Design Options

    Range of Options

    Various Sizes of new

    Gymnasium

    Different placement and

    layout of Secure

    Administration Suites

    Different Scope of Interior

    Renovations

  • Page: 9

    New Hope-Solebury School District Budgets

    Preliminary Budget Estimates:

    Option 1: $30-35 million (includes 10% Contingency & 20% Soft Costs)

    Sitework - $2,900,000

    New Construction - $13,300,000

    Renovations - $2,600,000

    Infrastructure - $7,500,000

    Option 2: $ 18-20 million (includes 10% Contingency & 20% Soft Costs)

    Sitework - $750,000

    New Construction - $4,400,000

    Renovations - $1,800,000

    Infrastructure - $7,400,000

    Option 3: $14-15 million (includes 10% Contingency & 20% Soft Costs)

    Sitework – (infrastructure only)

    New Construction - $2,500,000

    Renovations - $1,000,000

    Infrastructure - $7,400,000

  • Page: 10

    New Hope-Solebury School District Budgets

    Preliminary Budget Estimates:

    Other Considerations

    PDE Reimbursement currently in Moratorium

    Project must comply with Act 34

  • Page: 11

    New Hope-Solebury School District Closing

    Discussion