PRECINCT STRUCTURE PLAN - Amazon Web Services · december 2013 The Metropolitan Planning Authority...

2
Landowner Update The Metropolitan Planning Authority (MPA) is working with Mitchell Shire Council to prepare a Precinct Structure Plan (PSP) for the Beveridge North West Precinct. A PSP is a ‘big picture’ plan that sets the vision for the use and development of new urban communities within the growth areas of Melbourne. The Beveridge North West precinct covers 1,250 hectares in Beveridge. The precinct is located west of the Hume Freeway, north of Camerons Lane and east of Old Sydney Road. It is identified as a future residential area in the Victorian Government’s Growth Corridor Plan. Beveridge North West PRECINCT STRUCTURE PLAN NORTH GROWTH CORRIDOR PLAN The MPA released the Growth Corridor Plans for Melbourne’s growth areas in June 2012. The Growth Corridor Plan sets out the strategic direction by identifying integrated land use and transport plans that provide a framework to guide planning of new communities in each growth area. The Beveridge North West precinct is located in Melbourne’s North Growth corridor. The north growth corridor is forecast to provide houses for up to 330,000 people and provide between 83,000 to 105,000 jobs. The North Growth Corridor Plan identifies the land within Beveridge North West as predominantly residential with important landscape values (including hilltops and ridgelines). The Growth Corridor Plans highlight the need to consider housing types, water management, character and identity, transport links and landscape values. The Growth Corridor identifies: Key north-south and east-west roads (both new and upgrades to existing roads); Regional active open space; Investigation of the Camerons Lane and Hadfield Road interchange with the Hume Freeway/Northern Hwy; Landscape values. For further information on the Growth Corridor Plans visit: http://www.mpa.vic.gov.au/planning-activities/ greenfields-planning/growth-corridor-plans DECEMBER 2013

Transcript of PRECINCT STRUCTURE PLAN - Amazon Web Services · december 2013 The Metropolitan Planning Authority...

Page 1: PRECINCT STRUCTURE PLAN - Amazon Web Services · december 2013 The Metropolitan Planning Authority is always interested in your views about our programs and initiatives, and the issues

Landowner UpdateThe Metropolitan Planning Authority (MPA) is working with Mitchell Shire Council to prepare a Precinct Structure Plan (PSP) for the Beveridge North West Precinct. A PSP is a ‘big picture’ plan that sets the vision for the use and development of new urban communities within the growth areas of Melbourne.

The Beveridge North West precinct covers 1,250 hectares in Beveridge. The precinct is located west of the Hume Freeway, north of Camerons Lane and east of Old Sydney Road. It is identified as a future residential area in the Victorian Government’s Growth Corridor Plan.

Beveridge North West

PRECINCT STRUCTURE PLAN

NORTH GROWTH CORRIDOR PLANThe MPA released the Growth Corridor Plans for Melbourne’s growth areas in June 2012. The Growth Corridor Plan sets out the strategic direction by identifying integrated land use and transport plans that provide a framework to guide planning of new communities in each growth area.

The Beveridge North West precinct is located in Melbourne’s North Growth corridor. The north growth corridor is forecast to provide houses for up to 330,000 people and provide between 83,000 to 105,000 jobs.

The North Growth Corridor Plan identifies the land within Beveridge North West as predominantly residential with important landscape values (including hilltops and ridgelines).

The Growth Corridor Plans highlight the need to consider housing types, water management, character and identity, transport links and landscape values. The Growth Corridor identifies:

• Key north-south and east-west roads (both new and upgrades to existing roads);

• Regional active open space;

• Investigation of the Camerons Lane and Hadfield Road interchange with the Hume Freeway/Northern Hwy;

• Landscape values.

For further information on the Growth Corridor Plans visit:http://www.mpa.vic.gov.au/planning-activities/greenfields-planning/growth-corridor-plans

DECEMBER 2013

Page 2: PRECINCT STRUCTURE PLAN - Amazon Web Services · december 2013 The Metropolitan Planning Authority is always interested in your views about our programs and initiatives, and the issues

The Metropolitan Planning Authority is always interested in your views about our programs and initiatives, and the issues covered in this newsletter.

If you would you like to receive regular email updates on the work of the MPA, please register via our website www.mpa.vic.gov.au

CONTACT USMETROPOLITAN PLANNING AUTHORITY

Level 29, 35 Collins Street, Melbourne, 3000 | Phone: (03) 9651 9600 | Fax: (03) 9651 9623 | [email protected] | www.mpa.vic.gov.au

PROGRESSION OF THE BEVERIDGE NORTH WEST PRECINCT STRUCTURE PLANOver the past 6 months, the MPA has engaged a number of consultants to complete background studies to inform the urban structure for the precinct. The background studies commenced are:• Arboriculture Assessment;• Scattered Tree Assessment;

• Heritage Assessment;• Land Capability, and• High Level Servicing.

Draft Arboriculture and Scattered Tree Assessments have already been released to landowners for feedback. The MPA will continue to release the draft assessments. Finalised reports will be uploaded on the MPA website. http://www.mpa.vic.gov.au

FOR MORE INFORMATION PLEASE CONTACT

precinct boundary

urban growth boundary

existing road

OLD

SYD

NEY

RO

AD

RAIL

WAY

BEVERIDGE ROAD

CAMERONS LANE

NO

RTH

HIG

HW

AY

HUM

E FR

EEW

AY1000 1500m0 200 500

2 DEC 2013Date: 1:25,000 @ A3

beveridge northwest precinct structure planstructure plan area

Scale:

Fiona McDougall Senior Structure Planner Metropolitan Planning Authority Phone: 03 9651 9636 Email: [email protected]

Amy Reynolds Senior Strategic Planner Mitchell Shire Council Phone: 03 5734 6310 Email: [email protected]