PRECAST SUSPENDED SLABS

TECHNICAL DETAILS

Page 2: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 3: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

Precast Suspended Slabs

Design solutionsIncluded in this booklet, designers and engineers will find a design guide, load tables, and construction details for Heldenfels Enterprises Inc. precast suspended slab foundation systems. Suspended slab foundations are an excellent design solution for poor soil conditions where issues of shifting, uplift, and differential settlement are of concern or for a condition in which the end-user specifically desires a crawlspace for future flexibility and maintenance. A suspended foundation is placed above the existing material atop piers or piles. The loads applied to the foundation are transferred into the subterranean components through a direct bearing connection or pier/pile

caps. This design guide is a resource for designers to assist in meeting these requirements. In addition to these basic design parameters, our precast structural engineers will work with the designer. Sharing our precast design expertise with the Engineer-of-Record not only results in shared

responsibility, but also yields superior performance.

Construction solutionsThe Heldenfels Enterprises Inc. system facilitates speed of construction and minimizes trades and site congestion. By fabricating components during site preparation, our system leverages the inherent schedule advantages of precast construction. The ease of installation and all-weather constructability enhances site flow while minimizing quality issues and wasted time resulting in smoother, faster completion.

Owner solutionsOur system will allow for the design and construction of foundations that demonstrate superior performance. Stringent quality control paired with superior concrete mix design yields a vastly stronger, more durable structure than site cast concrete. Owners prefer our system solutions because they are affordable and reduce schedule risk. Long term owners value the benefits of crawlspace foundations for ease of maintenance and future adaptability.

Page 4: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 5: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

Section

Str

and L

ocations

20

24

28

32

36

40

44

48

52

26IT

34

10@

2.5

"16,0

54

11,4

54

8,7

54

6,8

54

5,5

34

4,7

34

--

-to

tal serv

ice load (

plf)

8@

4.5

"0.2

60.3

70.4

90.6

10.7

40.8

7-

--

cam

ber

at ere

ction

= 1

8 S

trand

0.2

20.2

90.3

40.3

60.3

30.2

5-

--

cam

ber

after

toppin

g w

eig

ht

0.2

70.3

20.3

20.2

50.1

7-0

.10

--

-final cam

ber

befo

re liv

e load

32IT

34

14@

2.5

"23,6

47

16,7

67

12,4

67

9,8

67

7,9

67

6,6

57

5,6

47

4,8

97

-

12@

4.5

"0.2

70.3

80.5

10.6

40.7

90.9

31.0

71.1

9-

= 2

6 S

trand

0.2

40.3

20.4

00.4

60.4

90.4

80.4

10.2

7-

0.3

10.3

90.4

50.4

60.4

10.3

10.1

3-0

.25

-

36IT

37

16@

2.5

"33,4

77

23,6

77

17,6

77

13,6

77

11,0

77

9,2

77

7,7

77

6,6

57

5,8

57

14@

4.5

"0.2

50.3

60.4

80.6

10.7

50.8

91.0

31.1

71.2

9

4@

4.5

"0.2

30.3

20.4

10.4

90.5

50.6

00.6

00.5

60.4

6

= 3

4 S

trand

0.3

00.4

00.4

90.5

60.5

80.5

50.4

30.3

60.0

7

Nt

LoadTableFoundationInvertedTeeBeams

Span (

feet)

Key

1)

f'c =

6,5

00 p

si, f'c

i =

3,5

00 p

si

2)2"compositetoppingw/f'c=3000psi.

3)Strand=1/2"

,270ksiLolax.

4)DeadLoads(noncomposite)

Beams=600plf,812.5plf,1023plf

Topping=25plf(nooverhangs)

5)SuperimposedDeadLoad(compositesystem)

D

ouble

Tees w

/ 2"

Toppin

g =

72 p

sf

26IT

34

32IT

34

36IT

37

OfficeBldg=15psf

Industrial=25psf

Parking=5psf

6)LiveLoads

OfficeBldg=100psf(reducible)

Industrial=150psf(nonreducible)

Parking=40psf

7)ApproximateDLandLLproportionsare:

OfficeBldg:DL=55%,LL=45%

Industrial:DL=40%,LL=60%

Parking:DL=65%,LL=35%

Parking:DL=65%,LL=35%

Note

s

cKsPROJECTNo.

DATE

P09001

5/10/2010

BY

SHEET

cK

IT-B

eam

s

5700IH35South,SanMarcos,TX78666,phone,512.396.2376,www.heldenfels.com

Held

en

fels

En

terp

ris

es, In

c.

HeldenfelsEnterprises

PrecastFoundations

Client

PROJECT

Page 6: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

Section

Str

and L

ocations

20

24

28

32

36

40

44

48

52

26LB

34

12@

2.5

"26,7

87

18,7

87

13,9

87

10,6

87

8,3

87

6,3

87

5,4

37

4,6

37

-to

tal serv

ice load (

plf)

10@

4.5

"0.2

90.4

10.5

40.6

90.8

51.0

21.1

81.3

4-

cam

ber

at ere

ction

6@

4.5

"0.1

60.2

20.2

60.3

40.4

50.7

80.8

40.8

5-

cam

ber

after

toppin

g w

eig

ht

= 2

8 S

trand

0.1

40.1

90.2

00.2

50.3

50.8

50.8

30.7

1-

final cam

ber

befo

re liv

e load

32LB

34

14@

2.5

"43,3

00

23,6

00

17,4

50

13,5

50

10,8

00

8,9

00

7,4

20

5,9

40

5,1

50

12@

4.5

"0.2

80.4

00.5

30.6

70.8

30.9

91.1

41.2

91.4

3

8@

4.5

"0.1

60.2

50.3

30.3

90.4

50.4

60.5

20.9

10.9

1

= 3

4 S

trand

0.1

50.2

60.3

20.3

60.3

80.2

90.2

80.8

90.7

5

36LB

37

16@

2.5

"47,0

32

33,4

32

24,6

32

18,8

32

15,0

32

12,2

32

10,2

32

8,6

32

7,4

32

14@

4.5

"0.2

60.3

60.4

90.6

20.7

60.9

11.0

61.2

11.3

4

10@

4.5

"0.1

40.1

80.2

40.3

10.3

50.3

90.4

30.4

50.4

2

= 4

0 S

trand

0.1

30.1

40.1

90.2

40.2

40.2

20.2

00.1

3-0

.04

Nt

LoadTableFoundationLBeams

Span (

feet)

Key

1)

f'c =

6,5

00 p

si, f'c

i =

3,5

00 p

si

2)2"compositetoppingw/f'c=3000psi.

3)Strand=1/2"

,270ksiLolax.

4)DeadLoads(noncomposite)

Beams=760plf,973plf,1205plf

Topping=25plf(nooverhangs)

5)SuperimposedDeadLoad(compositesystem)

D

ouble

Tees w

/ 2"

Toppin

g =

72 p

sf

26LB

34

32LB

34

36LB

37

OfficeBldg=15psf

Industrial=25psf

Parking=5psf

6)LiveLoads

OfficeBldg=100psf(reducible)

Industrial=150psf(nonreducible)

Parking=40psf

7)ApproximateDLandLLproportionsare:

OfficeBldg:DL=55%,LL=45%

Industrial:DL=40%,LL=60%

Parking:DL=65%,LL=35%

Parking:DL=65%,LL=35%

Note

s

cKsPROJECTNo.

DATE

P09001

5/10/2010

BY

SHEET

cK

L-B

eam

s

5700IH35South,SanMarcos,TX78666,phone,512.396.2376,www.heldenfels.com

Held

en

fels

En

terp

ris

es, In

c.

HeldenfelsEnterprises

PrecastFoundations

Client

PROJECT

Page 7: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

Section

Str

and L

ocations

20

24

28

32

36

40

44

48

52

18R

B31

8@

2.5

"19,8

70

14,2

70

10,8

20

8,5

70

7,0

20

5,8

70

--

-to

tal serv

ice load (

plf)

8@

4.5

"0.3

20.4

60.6

20.7

90.9

81.1

8-

--

cam

ber

at ere

ction

6@

4.5

"0.2

70.3

50.4

20.4

50.4

40.3

5-

--

cam

ber

after

toppin

g w

eig

ht

= 2

0 S

trand

0.3

30.3

80.3

80.2

80.0

5-0

.36

--

-final cam

ber

befo

re liv

e load

22R

B31

10@

2.5

"24,3

99

17,3

49

13,0

49

10,2

50

8,3

49

7,0

29

6,0

00

--

10@

4.5

"0.3

30.4

60.6

20.8

00.9

91.1

91.3

9-

-

8@

4.5

"0.2

80.3

80.4

60.4

70.5

40.5

10.4

0-

-

= 2

8 S

trand

0.3

50.4

30.4

70.4

40.3

00.0

1-0

.47

--

26R

B31

12@

2.5

"28,2

29

20,0

29

15,0

29

11,7

79

9,5

29

8,0

49

6,7

59

5,9

29

-

12@

4.5

"0.3

20.4

60.6

10.7

90.9

71.1

71.3

61.5

6-

8@

4.5

"0.2

90.3

80.4

70.5

50.5

90.5

90.5

20.3

6-

= 3

2 S

trand

0.3

60.4

60.5

20.5

20.4

40.2

3-0

.14

-0.7

2-

32R

B37

14@

2.5

"42,9

22

30,3

22

22,7

22

17,7

22

14,2

72

11,8

22

10,0

22

8,6

22

7,5

52

14@

4.5

"0.2

60.3

70.5

00.6

40.7

90.9

51.1

11.2

71.4

2

12@

4.5

"0.2

40.3

40.4

30.5

20.5

70.6

70.7

00.6

80.6

2

= 4

0 S

trand

0.3

20.4

30.5

30.6

10.6

60.6

40.5

50.3

60.0

4

LoadTableFoundationRBeams

Span (

feet)

Key

1)

f'c =

6,5

00 p

si, f'c

i =

3,5

00 p

si

2)2"compositetoppingw/f'c=3000psi.

3)Strand=1/2"

,270ksiLolax.

4)DeadLoads(noncomposite)

Beams=581plf,710plf,840plf,1233plf

Topping=25plf(nooverhangs)

5)SuperimposedDeadLoad(compositesystem)

8

" H

ollow

core

w/ 2"

Toppin

g =

82 p

sf

18R

B31

22R

B31

32R

B37

OfficeBldg=15psf

Industrial=25psf

Parking=5psf

6)LiveLoads

OfficeBldg=100psf(reducible)

Industrial=150psf(nonreducible)

Parking=40psf

7)ApproximateDLandLLproportionsare:

OfficeBldg:DL=55%,LL=45%

Industrial:DL=40%,LL=60%

Parking:DL=65%,LL=35%

Parking:DL=65%,LL=35%

26R

B31

Note

s

cKsPROJECTNo.

DATE

P09001

5/19/2010

BY

SHEET

cK

R-B

eam

s

5700IH35South,SanMarcos,TX78666,phone,512.396.2376,www.heldenfels.com

Held

en

fels

En

terp

ris

es, In

c.

HeldenfelsEnterprises

PrecastFoundations

Client

PROJECT

Page 8: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

# o

f S

trand

Str

and L

ocations

28

32

36

40

44

48

52

56

60

62@

2"

279

219

177

147

125

109

92

82

-

2@

4"

0.5

70.6

90.8

00.8

90.9

30.9

20.8

40.6

7-

2@

6"

0.5

40.6

40.7

20.7

60.7

40.6

50.4

6-0

.17

-

0.6

70.7

60.7

90.7

50.5

90.2

80.2

1-0

.35

-

82@

2337

262

212

177

150

130

114

101

-

2@

4"

0.6

30.7

80.9

21.0

41.1

31.1

71.1

61.0

7-

2@

6"

0.6

00.7

30.8

30.9

10.9

40.9

10.7

90.5

7-

2@

10"

0.7

60.8

80.9

60.9

70.8

80.6

50.2

60.3

3-

10

2@

2"

392

305

245

202

171

147

129

114

102

tota

l serv

ice load (

psf)

2@

4",

2@

6"

0.6

70.8

30.9

91.1

31.2

51.3

21.3

51.3

11.1

9cam

ber

at ere

ction

2@

10"

0.6

40.7

80.9

01.0

01.0

61.0

60.9

80.8

10.5

3cam

ber

after

toppin

g w

eig

ht

2@

12"

0.8

10.9

61.0

61.1

01.0

50.8

70.5

40.0

2-0

.73

final cam

ber

befo

re liv

e load

12

2@

2",

2@

4",

459

355

284

235

199

170

148

130

117

2@

6",

2@

8"

0.7

20.9

11.0

91.2

71.4

31.5

51.6

41.6

71.6

7

2@

10"

0.6

90.8

61.0

11.1

41.2

41.2

91.2

71.1

80.9

8

2@

12"

0.8

91.0

71.2

11.3

01.3

11.2

10.9

60.5

5-0

.06

LoadTable10DT24FoundationDoubleTee

Span (

feet)

Key

1)

f'c =

6,0

00 p

si, f'c

i =

3,5

00 p

si

2)2"compositetoppingw/f'c=3000psi.

3)Strand=1/2"

,270ksiLolax.

4)DeadLoads(noncomposite)

DoubleTee=47psf

2"Topping=25psf

5)SuperimposedDeadLoad(compositesystem)

OfficeBldg=15psf

Industrial=25psf

Parking=5psf

DT

Cro

ss-S

ectional A

rea =

452 in

26)LiveLoads

OfficeBldg=100psf(reducible)

Industrial=150psf(nonreducible)

Parking=40psf

7)ApproximateDLandLLproportionsare:

OfficeBldg:DL=55%,LL=45%

Industrial:DL=40%,LL=60%

Parking:DL=65%,LL=35%

Note

s

cKsPROJECTNo.

DATE

P09001

4/26/2010

BY

SHEET

cK

10D

T24

5700IH35South,SanMarcos,TX78666,phone,512.396.2376,www.heldenfels.com

Held

en

fels

En

terp

ris

es, In

c.

HeldenfelsEnterprises

PrecastFoundations

Client

PROJECT

Page 9: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

# of

Stra

ndSt

rand

Loc

atio

ns28

3236

4044

4852

56

62@

2"27

921

917

714

712

510

992

82-

2@4"

0.57

0.69

0.80

0.89

0.93

0.92

0.84

0.67

-2@

6"0.

540.

640.

720.

760.

740.

650.

46-0

.17

-0.

670.

760.

790.

750.

590.

280.

21-0

.35

-8

2@2

337

262

212

177

150

130

114

101

-2@

4"0.

630.

780.

921.

041.

131.

171.

161.

07-

2@6"

0.60

0.73

0.83

0.91

0.94

0.91

0.79

0.57

-2@

10"

0.76

0.88

0.96

0.97

0.88

0.65

0.26

0.33

-10

2@2"

392

305

245

202

171

147

129

114

102

to

tal s

ervi

ce lo

ad (p

sf)

2@4"

, 2@

6"0.

670.

830.

991.

131.

251.

321.

351.

311.

19

cam

ber a

t ere

ctio

n2@

10"

0.64

0.78

0.90

1.00

1.06

1.06

0.98

0.81

0.53

ca

mbe

r afte

r top

ping

wei

ght

2@12

"0.

810.

961.

061.

101.

050.

870.

540.

02-0

.73

fin

al c

ambe

r bef

ore

live

load

122@

2", 2

@4"

,45

935

528

423

519

917

014

813

011

7

f'ci >

350

0psi

requ

ired

2@6"

, 2@

8"0.

720.

911.

091.

271.

431.

551.

641.

671.

67

Span

(fee

t)

2@6"

, 2@

8"0.

720.

911.

091.

271.

431.

551.

641.

671.

672@

10"

0.69

0.86

1.01

1.14

1.24

1.29

1.27

1.18

0.98

2@12

"0.

891.

071.

211.

301.

311.

210.

960.

55-0

.06

1) f'

c =

6,00

0 ps

i, f'c

i = 3

,500

psi

DT

Cro

ss-S

ectio

nal A

rea

= 45

2 in

2

To

ppin

g Th

ickn

ess

= 2

in

Not

es

cK

/JT

10D

T24-

2"

Hel

denf

els

Ent

erpr

ises

, Inc

.

cK

/JT

10D

T24-

2"

Hel

denf

els

Ent

erpr

ises

, Inc

.

Page 10: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers

# of

Stra

ndSt

rand

Loc

atio

ns28

3236

4044

4852

56

62@

2"29

423

118

815

713

411

610

0-

-2@

4"0.

570.

690.

800.

890.

930.

920.

842@

6"0.

520.

610.

670.

690.

640.

510.

270.

620.

690.

690.

600.

380.

00-0

.32

82@

235

928

022

718

816

013

812

010

1-

2@4"

0.63

0.78

0.92

1.04

1.13

1.17

1.16

1.07

2@6"

0.58

0.70

0.79

0.84

0.84

0.77

0.60

0.32

2@10

"0.

710.

810.

850.

820.

670.

37-0

.09

-1.1

410

2@2"

414

323

260

216

182

157

134

112

96

tota

l ser

vice

load

(psf

)2@

4", 2

@6"

0.67

0.83

0.99

1.13

1.25

1.32

1.35

1.31

1.19

ca

mbe

r at e

rect

ion

2@10

"0.

620.

750.

860.

930.

960.

920.

800.

570.

21

cam

ber a

fter t

oppi

ng w

eigh

t2@

12"

0.76

0.88

0.95

0.94

0.83

0.59

0.19

-0.2

6-1

.25

fin

al c

ambe

r bef

ore

live

load

122@

2", 2

@4"

,48

537

730

325

021

118

115

213

011

1 f

'ci >

350

0psi

requ

ired

2@6"

, 2@

8"0.

720.

911.

091.

271.

431.

551.

641.

671.

62

Span

(fee

t)

2@6"

, 2@

8"0.

720.

911.

091.

271.

431.

551.

641.

671.

622@

10"

0.68

0.83

0.97

1.08

1.14

1.16

1.09

0.93

0.66

2@12

"0.

840.

991.

101.

151.

100.

930.

610.

26-0

.20

1) f'

c =

6,00

0 ps

i, f'c

i = 3

,500

psi

DT

Cro

ss-S

ectio

nal A

rea

= 45

2 in

2

To

ppin

g Th

ickn

ess

= 3

in

Not

es

JT

10D

T24-

3"

Hel

denf

els

Ent

erpr

ises

, Inc

.

JT

10D

T24-

3"

Hel

denf

els

Ent

erpr

ises

, Inc

.

Page 11: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 12: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 13: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 14: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 15: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 16: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 17: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 18: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 19: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers
Page 20: PRECAST SUSPENDED SLABS - Heldenfels …heldenfels.com/wp-content/uploads/FoundationDesignGuidelines.pdfPrecast Suspended Slabs Design solutions Included in this booklet, designers