Welcome to Webinar on Accelerated Bridge Construction Precast Substructures, Part 2 Comparison of Non-Seismic and Seismic Connection Details Sponsored by Accelerated Bridge Construction Center (ABC Center) at Florida International University Website: abc-utc.fiu.edu Email: [email protected] June 19, 2014 1:00 p.m. to 2:00 p.m. Eastern

Transcript of Precast Substructures, Part 2 Comparison of Non … Substructures, Part 2 – Comparison of...

Welcome to Webinar on

Accelerated Bridge Construction

Precast Substructures, Part 2 –

Comparison of Non-Seismic and

Seismic Connection Details

Sponsored by

Accelerated Bridge Construction Center

(ABC Center) at

Florida International University

Website: abc-utc.fiu.edu

Email: [email protected]

June 19, 2014 – 1:00 p.m. to 2:00 p.m. Eastern

Webinar Agenda

ABC Announcements (10 minutes)

Featured Presentation (35 minutes)

Precast Substructures, Part 2 –

Comparison of Non-Seismic and

Seismic Connection Details

M. Lee Marsh, Ph.D., P.E., President and CEO,

BergerABAM

Question and Answer (15 minutes)

Please post your questions in the chat box

2014 National Accelerated Bridge

Construction Conference

December 4-5, 2014 December 3 – workshops

Hyatt Regency, Miami, Florida

www.2014abc.fiu.edu

Conference at a Glance

- Conference is Co-Sponsored by 26 State DOTs

- U.S. Secretary of Transportation Anthony Foxx

invited keynote speaker

- Conference includes more than 170 technical

presentations

- Nine (9) workshops – Day before the

conference

- Opportunities exist for exhibits

Thursday Breakout Sessions – Early Afternoon Room A Room B Room C Room D Room E

Session #1 – Case Studies Session #2 – State Experience Session #3 – Bridge Deck Session #4 – Railroad

Session #5 – Guide, Specification, Tools

1:3

0 –

1:5

0

Folded Steel Plate Girder System Applications in Accelerated Bridge Construction - Part I Matthew Macey, CDR Bridge Systems LLC Carlos Duart, CDR Bridge Systems LLC

Prefabricated Bridge Construction Practice in Florida Robert Robertson, Florida Dept. of Transp. Thomas Andres, Florida Dept. of Transp. Jeffrey Ger, FHWA, Florida Division Dennis Fernandez, Florida Dept. of Transp.

Design and Construction of Prefabricated Steel Deck Ramps during the Alexander Hamilton Bridge Reconstruction Project, Bronx, New York

Bhadresh Patel, SJH Engineering, P.C. S Jayakumaran, SJH Engineering, P.C. Gary Dinmore, Halmar International, LLC

Making the Most of Traditional Techniques

Mansoor Ahsan, Bridgefarmer & Associates, Inc.

Comparing Total Cost of Bridge Construction Using ABC and Conventional Methods of Construction Mohammed Hadi, Florida International University Albert Gan, Florida International University

1:5

0 –

2:1

0

Application of Folded Plate Technology - Part II: Case of Boone County Nebraska Fouad Jaber, Nebraska Dept. of Roads Mark Traynowicz, Nebraska Dept. of Roads

Accelerated Bridge Construction in Utah - Owner Perspective Randy Park, Utah Dept. of Transp. Carmen Swanwick, Utah Dept. of Transp.

Deck Replacement with Full Depth Precast Post-Tensioned Panels: Challenges, Solutions, Prefabrication and Construction Performance

Jim Scoles, Morrison-Maierle, Inc. Hugh Boyle, H. Boyle Engineering, Inc. Lee Wegner, Hanson Structural Precast Eric Wells, Granite Construction

Inlet Centre Station Tunnel Jacking- Evergreen Line Rapid Transit Project, Vancouver, British Columbia, Canada Samson Chan, SNC Lavalin Inc.

Geotechnical and Foundation Opportunities for ABC Jerry DiMaggio, Applied Research Associates Inc.

2:1

0 –

2:3

0

Accelerated Bridge Construction: Implementation of GRS-IBS for 27th Street Bridge over Broad Branch Stream, Washington DC

Zahra Dorriz, DC Department of Transportation

Precast, Pretensioned, Rectangular Bent Caps Christopher Miller, Texas Dept. of Transp. John Holt, Texas Dept. of Transp. Victoria McCammon, Texas Dept. of Transp.

Overnight Deck Replacement of the I-190 Grand Island Bridge

Mark Horschel, Bergmann Associates Philip Gase, BGFMA

Practical Accelerated Bridge Construction for Railroad Bridge Project Delivery

Duncan Paterson, HDR Inc. Jon Winer, HDR Inc.

ABC, FHWA SHRP2 R04: Implementation across the USA

Finn Hubbard, Fish & Associates Inc.

2:3

0 –

2:5

0

Don’t Judge A Bridge By Its Length

William Castle, W.J. Castle, P.E. & Associates, P.C.

VDOT I-95 Accelerated Bridge Construction Project Scott Fisher, Virginia Dept. of Transp. Jorge Suarez, Michael Baker International Malcolm Kerley, NXL

Precast Prestresseed Full Depth Deck Panels for Bridge Decks over New and Existing Prestressed Concrete Girder Bridges

Terry Mackie, Tennessee Dept. of Transp.

Accelerated Bridge Construction for Busy Commuter Rail Service Matthew Paradis, HNTB Corp Patrick Kitto, Caltrain/SAMTRANS

Slide-In Bridge Construction Guide Michael Arens, Michael Baker International

2:5

0 –

3:1

0

Angus L. Macdonald Suspension Bridge: Erection Sequence And Major Erection Equipment

Dusan Radojevic, Buckland & Taylor Keith Kirkwood, Buckland & Taylor Jon Eppell, Halifax Harbour Bridges Peter Buckland, Buckland & Taylor

UDOT Experience Utilizing Slide-In Bridge Construction

Richard Hansen, Parsons Rebecca Nix, Utah Dept. of Transp.

Bayou Lafourche Bridge – A Cost-Effective Full Depth Precast Deck Solution

Eddie He, AccelBridge Justin Peltier, Huval & Associates Carl Gaudry, Louisiana Dept. of Transp. and Dev. Paul Vaught III, Louisiana DOTD

Rapid Replacement of Railroad Bridges

Using Heavy Lift Technology Darren Conboy, Jacobs Engineering Group Ernest Dobbs, Jr., Jacobs Engineering Group James Szczupaj, Jacobs Engineering Group

Development of Economical Short-Span Steel Bridge Standards

Karl Barth, West Virginia University Gregory Michaelson, West Virginia University Michael Barker, University of Wyoming Daniel Snyder, Steel Market Development Inst.

3:1

0 –

3:3

0

Interstate Accelerated Bridge Replacement in Utah: Minimizing User Impacts by Optimizing Construction Sequence and Methods Jim Higbee, Utah Dept. of Transp. Jason Klophaus, Klophaus and Associates Carmen Swanwick, Utah Dept. of Transp.

The Michigan Department of Transportation and the Implementation of Accelerated Bridge Construction Kyle Kopper, Michigan Dept. of Transp. Bradley Wagner, Michigan Depart. of Transp.

Innovative ABC System Using Steel and Concrete in Sandwich Form

Atorod Azizinamini, Department of CEE, Florida International University

Bridge Street ABC Railroad Bridge Replacement Project, Hartford Vermont

Adam Stockin, Parsons Brinckerhoff G. Keith Donington, Parsons Brinckerhoff

Accelerated Bridge Construction – The Minnesota DOT Experience Paul Rowekamp, Minnesota Dept. of Transp.

Thursday General Session Main Ballroom Main Ballroom

8:0

0

Welcome

Atorod Azizinamini, Director, ABC-UTC Mark Rosenberg, President, Florida International University AASHTO SCOBS Chair, AASHTO FHWA FDOT Secretary of Transportation, FDOT Kevin C. Womack, Associate Administrator, Research, Development and Technology, Office of the Assistant Secretary for Research and Technology, U.S. Department of Transportation

10:3

0

Contractor Perspective on Effective Implementation of ABC

Eric Wells, Granite Construction

10:5

0

Concrete Industry Perspective on Effective Implementation of ABC William Nickas, Precast/Prestressed Concrete Institute

8:3

0

Keynote Address

Anthony Foxx, U.S. Secretary of Transportation

11:1

0

Steel Industry Perspective on Effective Implementation of ABC

Bill McEleney, NSBA

9:0

0

Recognition of Travel Scholarship Contributors

Ed Power, HDR Carlos Duart, CDR Maguire

11:3

0

National Perspective on FHWA EDC1 & EDC2 Ben Beerman, FHWA

9:2

0

Moving Innovation into Practice Carmen Swanwick, Chair of T-4 Committee, AASHTO

11:5

0

Service Life Related Issues for ABC Bruce Johnson, Oregon Department of Transportation

9:4

0

History of ABC Mary Lou Ralls-Newman, Ralls Newman, LLC

12:1

0

Available ABC Resources Through University Transportation Center Atorod Azizinamini, Director, ABC-UTC

10: 00 – 10:30 Break

12: 20 – 1:30 Lunch

Thursday Breakout Sessions – Late Afternoon Room A Room B Room C Room D Room E

Session #6: Case Studies Session #7: Moving Technique &

Construction Session #8: Planning-Contract-

Outreach Session #9: Seismic

Session #10: Guide, Specification, Tools

4:0

0 –

4:2

0

U.S. Route 202 over Passaic River - Complete Bridge Replacement in 7 Days Using Accelerated Bridge Construction Techniques

Mark Sheptock, AmerCom Corporation Atly Botas, AmerCom Corporation

Design and Construction Challenges in Converting a Construct-in-Place Bridge to a Bridge Moved into Place using a Lateral Slide

Hugh Boyle, H. Boyle Engineering Justin Wiatrek, Texas Dept. of Transp. David Griffin, Texas Sterling Construction

Managing Emerging Exposures in Accelerated Bridge Design and Construction

Robert Hughes, Ames & Gough

Seismic Performance of Precast Girder-to-Cap Beam Connections Designed for ABC

Sri Sritharan, Iowa State University Justin Vander Werff, Dordt College Robert Peggar, Iowa State University Ron Bromenschenkel, Caltrans

Modular Panel Bridges Used Adjacent To Existing Bridge For Temporary Detour During Bridge Replacement

Andrew Boorman, Mabey Inc.

4:2

0 –

4:4

0

Rural SW Montana County Utilizes ABC Techniques to Replace WPA Era Bridge with a 90-Foot Modular Steel Structure and Precast Abutments in Four Days

James Carpita, Beaverhead County

The Michigan Department of Transportation’s Use of Bridge Lateral

Slides Part I

Bruce Campbell, Parsons Corp.

Using the Design Build Process to Achieve a State of Good Repair on

“Typical” Bridges

Deborah Chase, Greenman Pedersen, Inc.

Caltrans Accelerated Bridge Construction

Barton Newton, CalTrans

Nondestructive Testing to Determine Existing Bridge Foundation Conditions

Paul Fisk, NDT Corporation

4:4

0 –

5:0

0

AASHTO Bulb-Tee Multi-Girder Bridge Supported on GRS-IBS Foundation System

Ahmad Faqiri, Pennoni Associates Inc.

The Michigan Department of Transportation’s Use of Bridge Lateral Slides Part II

Kyle Kopper, Michigan Dept. of Transp. Bradley Wagner, Michigan Dept. of Transp. Corey Rogers, Michigan Dept. of Transp.

An ABC Screening Process for Toll Roads in New Jersey

Thomas Zink, Gannett Fleming, Inc. Agnieszka Lapinski, Gannett Fleming, Inc.

State-of-the-Art Report on Seismic Design of Precast Concrete Bridges

Bijan Khaleghi, Washington State Dept. of Transp.

3D Design and Fabrication for Prefabricated Bridge Substructures

Changsu Shim, Chung-Ang University Sungjun Park, Chung-Ang University Sung-Woong Ji, Chung-Ang University

5:0

0 –

5:2

0

Accelerated Bridge Concepts for the Sprain Parkway Bridges over Route 119 for NYSDOT

David Weiss, WSP USA Corp.

P-954 Flyover Tied Arch Bridge

Natalie McCombs, HNTB Marwan Nader, T.Y. Lin International

CDR Maguire Engineering Practice on ABC Project Design and Construction Yihui Peter Wu, CDR Maguire Inc. Carlos Duart, CDR Maguire Inc.

Quasi-Static Experimental Testing of Emulative and Low-Damage Seismic Technologies for Accelerated Bridge Construction in Seismic Areas

Mustafa Mashal, University of Canterbury Alessandro Palermo, University of Canterbury

Tolerances for Prefabricated Bridge Elements

Michael Culmo, CME Associates, Inc.

5:2

0 –

5:4

0

New Jersey Route 10 over the Passaic River Superstructure Replacement using Accelerated Bridge Construction Systems

Gerard Kroner, Hatch Mott MacDonald Jeff Smith, Hatch Mott MacDonald

Slide-In-Replacement of the Skagit River Collasped Span

Christopher Vanek, Parsons Brinckerhoff Victor Ryzhikov, Parsons Brinckerhoff Charles Rudie, Parsons Brinckerhoff John Poulson, Parsons Brinckerhoff

VTrans Programmatic Approach to Planning and Public Outreach for Accelerated Bridge Projects

Kristin Higgins, Vermont Agency of Transp. Wayne Symonds, Vermont Agency of Transp.

Circular Concrete Filled Tube Bridge Pier Connections for Accelerated Bridge Construction in Seismic Zones

Max Stephens, University of Washington Dawn Lehman, University of Washington Charles Roeder, University of Washington

Recent Advancements in Accelerated Bridge Construction Applications in California

Paul Chung, CalTrans Jian Qiao Fang, CalTrans

Thursday Breakout Sessions – Evening Room A Room B Room C Room D Room E

Session #11: Case Studies Session #12: Moving Technique &

Construction Session #13: Research

Session #14: Planning-Contract-Outreach

Session #15: Guide, Specification, Tools

7:3

0 –

7:5

0

Innovative Crossroads: ABC Bridge Project Features Roundabouts (Pecos Street Bridge Replacement)

Tamara Hunter-Maurer, Colorado Dept. of Transp. Tom Melton, Wilson & Company, Inc. David Paris, Kiewit Infrastructure

The Bridges of Rocky Ford: A Comparison of Two Lateral Bridge Slide Methods Jeffrey Dobmeier, Jacobs Engineering

Strut-and-Tie Model and Design Guidelines of ABC Joints

Z. John Ma, University of Tennessee-Knoxville

How to Build the Perfect ABC Team Amalia Deslis, Somers-Jaramillo & Associates

GeoTechTools - Geotechnical Solutions for Accelerated Bridge Construction

Vernon Schaefer, Iowa State University Ryan Berg, Ryan R. Berg & Associates

7:5

0 –

8:1

0

Challenges of Designing a Two-span

Continuous Precast Concrete Accelerated Bridge Reconstruction Ryan Adams, Greenman-Pedersen, Inc. Scott Deeck, New Jersey Dept. of Transp.

Huey P. Long Bridge Innovative Truss Erection Method Hans Hutton, HNTB

Hybrid Fiber Reinforced Concrete Composites for Accelerated Bridge Column Construction Will Nguyen, CEE, UC Berkeley William Trono, CEE, UC Berkeley Claudia Ostertag, CEE, UC Berkeley

Accelerated Bridge Construction – A Design-Build Perspective Eddie He, Parsons Steve Haines, Parsons

Prefabricated Precast Structures Speed Accelerated Bridge Construction Scott Aston, Contech Engineered Solutions Anthony Rotondo, Jr., FHWA

8:1

0 –

8:3

0

Small Work Windows and Tight Schedule Equals ABC

Paul Berthiaume, Greenman-Pedersen, Inc.

Railing Smart-Transporter System for Replacement of an Existing Bridge in 4 Hours Jung-hyun Kim, KOBEC Kwang-Soo You, KOBEC Changsu Shim, Chung-Ang University Shigehide Noda, NODA CRANE

Earthquake Shake Table Testing of a Self-centering ABC Bridge

Islam Mantawy, University of Nevada Reno Travis Thonstad, University of Washington David Sanders, University of Nevada Reno John Stanton, University of Washington Marc Eberhard, University of Washington

Every Day Counts! Slide-In Bridge Construction Outreach and Training Travis Boone, URS Corporation Joshua Laipply, Colorado Dept. of Transp.

Utah and Arizona ABC / PBES – Get the “Nuts And Bolts” Right, or the Plan Won't Come Together as Planned Predrag Milosavljevic, Stanley Consultants, Inc. Eric Huskey, Stanley Consultants, Inc.

8:3

0 –

8:5

0

60 Hours: New Hampshire's First Interstate Use of Accelerated Bridge Construction Tom Kendrick, McFarland Johnson, Inc. Ron Kleiner, Jr., New Hampshire DOT

Cost Effective Slide-In Bridge Construction in Maine Tom Kendrick, McFarland Johnson, Inc. Kim Suhr, Wyman & Simpson, Inc.

Dimensional Stability of Prebagged Cementitious Grouts for Prefabricated Bridge Element and System Connections Igor De la Varga, SES-TFHRC Benjamin Graybeal, FHWA-TFHRC

Completing the ABC Package: Public Outreach Tactics Amalia Deslis, Somers-Jaramillo & Associates

Transition from 2D Drawings to 3D Models in Automated Concrete Detailing Alexander Mabrich, Bentley Systems

Friday Breakout Sessions – Early Morning Room A Room B Room C Room D Room E

Session #16: Case Studies Session #17: Repair Session #18: Service Life Session #19:Seismic Session #20: Guide, Specification, Tools

Montour Run Bridge No. 6 Replacement - Thanksgiving Weekend 2012

Mark Pavlick, HDR, Inc.

Rehabilitation of Historic Wells Street Moveable Bridge, Chicago, Illinois – Part I

Dipal Vimawala, AECOM

Using GFRP Rebar as a Cost Effective Solution to Extend the Service Life of New and Replacement Bridge Decks: A Case Study of the I-635 Bridge Deck Replacement for the KDOT

Ryan Koch, Aslan FRP

A Precast Concrete Bridge Bent System for ABC in High Seismic Regions

Olafur Haraldsson, Univeristy of Washington John Stanton, Univeristy of Washington Marc Eberhard, Univeristy of Washington Bijan Khaleghi, Washington State DOT Lee Marsh, BergerABAM Engineers

SHRP2 – Contribution to ABC

Finn Hubbard, Fish & Associates, Inc.

Merging Hybrid Composite Beams and GRS-IBS Technology for a Cost Effective Accelerated Bridge Construction Solution

Dipali Patel, Whitney Bailey Cox & Magnani, LLC Mike Izzo, Whitney Bailey Cox & Magnani, LLC

Wells Street Bascule Bridge Fast Track Construction Engineering – Part II

Stan-lee Kaderbek, Collins Engineers, Inc. Jason Schneider, Collins Engineers, Inc. Anastasia Kotsakis, Collins Engineers, Inc. Kevin Becker, Walsh Construction Company

Galvanized Steel for Bridge Longevity

Kevin Irving, AZZ Galvanizing Services

Damage-free Earthquake-resistant Deconstructible Columns for ABC

Sebastian Varela, Univ. of Nevada, Reno M. Saiid Saiidi, Dept of CEE, Univ. of Nevada, Reno

ABC Design and Construction Guide

Mike Culmo, CME Associates, Inc.

ABC Techniques in Rural Montana – 3 Replacement Bridges on the Lewis & Clark Highway

Jim Scoles, Morrison-Maierle, Inc. Andy Cullison, Morrison-Maierle, Inc. Keely Matson, Morrison-Maierle, Inc. Kent Barnes, Montana Dept. of Transp.

Accelerated Repair of the Eggner’s Ferry Bridge

Aaron Stover, Michael Baker International

Standardized Steel Orthotropic Decks for

Improved Manufacturability, Accelerated Construction and 100 Years’ Service Life

Soguata Roy, Lehigh University Soham Mukherjee, Lehigh University

An ABC Bridge Bent that Self-centers After an Earthquake

Travis Thonstad, University of Washington Olafur Haraldsson, University of Washington John Stanton, University of Washington Marc Eberhard, University of Washington

NCHRP ABC Research Products

Waseem Dekelbab, National Cooperative Highway Research Program, Transportation Research Board

ABC Solutions for the Colorado River Pathway Bridges

Jared Olsen, Horrocks Engineers Larry Reasch, Horrocks Engineers Matt Horrocks, Horrocks Engineers Dave Dillman, Horrocks Engineers

Well Road Bridge Replacement Using Self-Propelled Modular Transporters

Rachel Mertz, Modjeski and Masters, Inc. Mark Bucci, Louisiana Dept. of Transp. and Dev.

Corrosion Protection Plan Requirements in APD: Toward a Best-Practice Approach

Peter Elza, Parsons Corporation

Extending Application of SDCL in Seismic Areas

Ramin Taghinezhad, Dept of CEE, FIU Alireza Mohammadi, Dept of CEE, FIU Atorod Azizinamini, Dept of CEE, FIU

Developing next generation of ABC decision-making tools

Ben Tang, Oregon Department of Transportation

New York’s I-84 Bridge Slide: Design Challenges and Lessons Learned

Bala Sivakumar, HNTB Corp Steven Lin, HNTB Corp Cristina Brosio, HNTB Corp

Implementation of Accelerated Construction Methods for the Rehabilitation of New York Avenue Bridge Over Railroad Tracks

Inmar Badwan, T.Y. Lin International Amir Arab, T.Y. Lin International Ali Shakeri, DDOT IPMA Bijan Naderi, Fort Myer Construction Corporation

Performance of Post-Tensioned Curved-Strand Connections in Transverse Joints of Precast Deck

Zane Wells, Utah State University Paul Barr, Utah State University Patrick James, Utah State University Marv Halling, Utah State University

An Earthquake-Resistant Column Base Pipe Pin Connection for ABC

Ali Mehrsoroush, Dept. of CEE, UNR M. Saiid Saiidi, Dept. of CEE, UNR

Data Base as a Tool for Selecting Best ABC Alternative

Mohamadreza Shafieifar, Dept of CEE, FIU Jawad Gull, Dept of CEE, FIU Atorod Azizinamini, Dept of CEE, FIU

Accelerated Bridge Construction Techniques, Considerations, and Lessons Learned for Rapid Replacement of Bascule Bridge Spans

Timothy Davis, PCL Civil Constructors, Inc.

Accelerated Bridge Construction

Methods Employed in the Rehabilitation of the Pulaski Skyway

Andrew Foden, Parsons Brinckerhoff Christopher Gentz, Parsons Brinckerhoff Nat Kasbekar, New Jersey Dept. of Transp. Scott Thorn, New Jersey Dept. of Transp.

Development of Service Life Design

Guide for ABC Projects

Jawad Gull, Dept. of CEE, FIU Atorod Azizinamini, Dept. of CEE, FIU

Seismic Performance of Grouted Splice Precast Column Joints with Shifted Plastic Hinge Mechanisms

Haider Al-Jelawy, Dept. of CECE, UCF Zachary B. Haber, Professional Service Industries Kevin R. Mackie, Dept. of CECE, UCF

The Genetic Makeup of Accelerated

Bridge Technology

Mark Joosten, Acrow Corporation of America Eugene Sobecki, Acrow Corporation of America

Friday Breakout Sessions – Late Morning Room A Room B Room C Room D Room E

Session #21: Case Studies Session #22: Research Session #23: State Experience Session #24: New ABC Systems Session #25: Tappan Zee Bridge

10:3

0 –

10:5

0

Milton Madison Bridge Replacement - Part 1 Murray Johnson, Buckland & Taylor Tom Bolte, Burgess & Niple Inc.

Strengthening Transverse Connections of Prefabricated Concrete Hollow Core Slab Beam Bridges using Transverse Post-tensioned Bars Yanling Leng, New Mexico State University Jinquan Zhang, RIOH, Ministry of Trans China Ruinian Jiang, New Mexico State University Sonya Copper, New Mexico State University Haifang He, RIOH, Ministry of Trans, China

Upcoming ABC initiative in Pennsylvania Tom Macioce, PennDOT

Hydro-Brace Steel Pile Repair System

William Castle, W.J. Castle, P.E. & Associates, P.C.

Precast Pile Tub Foundations Design for Tappan Zee Bridge (Part 1) Nicholas Burdette, HDR Inc.

10:5

0 –

11:1

0

Milton Madison Bridge Replacement: Part 2 Murray Johnson, Buckland & Taylor Tom Bolte, Burgess & Niple Inc.

Strength and Fatigue Resistance of Clustered Shear Studs

Jason Provines, PSI, Inc. Justin Ocel, Federal Highway Administration

Upcoming ABC Initiative in Oklahoma

Bob Rusch, Oklahoma Dept. of Transp.

Development of a Press-Brake-Formed Modular Steel Tub Girder for Accelerated Bridge Construction

Karl Barth, West Virginia University Gregory Michaelson, West Virginia University Lindsay Kelly, West Virginia University Michael Barker, University of Wyoming Daniel Snyder, Steel Market Development Institute

Precast Pile Tub Foundations Details for Tappan Zee Bridge (Part 2) Nick Hatinger, HDR Inc.

11:1

0 –

11:3

0

Accelerated Bridge Construction of Martin Luther King Jr. Memorial Bridge – City of Bluefield, WV Faheem Ahmad, E. L. Robinson Engineering Co. Ahmed Mongi, West Virginia Division of Highways

Field-Cast Connections for Prefabricated Bridge Elements Jiqiu Yuan, PSI, Inc., Turner-Fairbank HRC Benjamin Graybeal, FHWA, Turner-Fairbank HRC Sorin Marcu, PSI, Inc., Turner-Fairbank HRC

Re-Decking of I-84 Bridges over UPRR and Northside Blvd. in Nampa, Idaho

Kenneth Clausen, Idaho Transportation Dept.

Rapidly Deployable Plate and Tube Modular Workhorse Bridges of 120 ft or Less in Length Christopher Hahin, Illinois Dept. of Transp.

Precast Pier Cap Design for Tappan Zee Bridge (Part 1)

Mike Lamont, HDR Inc.

11:3

0 –

11:5

0

Accelerated Bridge Construction for the Replacement of the Bridge on Route 10 over the Manhan River in Easthampton, Massachusetts

Paul White, Lafarge

Pile-to-Pile Cap Connections for Accelerated Bridge Construction Justin Dahlberg, Bridge Engg. Center - ISU James Nelson, Iowa Dept. of Transp. Ahmad Abu-Hawash, Iowa Dept. of Transp. Brent Phares, Bridge Engg. Center - ISU

Prefabricated Decked Girders for Accelerated Bridge Construction in Washington State Lara Khaleghi, Parsons Transportation Group, Irvine, California

The Design of Prefabricated SPS Bridge Decks for US Bridges Angelo Ferro, Intelligent Eng. (Canada) Ltd. Alain-Philippe Beauger, Intelligent Eng. (Can) Ltd. Zachary McNeil, Intelligent Eng. (Canada) Ltd.

Precast Pier Cap Details for Tappan Zee Bridge (Part 2)

Sreenath Kotamala, HDR Inc.

11:5

0 –

12:1

0

Examining Accelerated Bridge Construction Techniques in the Clayton Street Bridge Replacement Aboud Alzaim, The Louis Berger Group, Inc. Malek Al-Khatib, The Louis Berger Group, Inc. Daniel Deng, The Louis Berger Group, Inc.

Laboratory Investigation of ABC Connection Details using Grouted Couplers Travis Hosteng, Bridge Engg. Center - ISU Brent Phares, Bridge Engg. Center - ISU Ahmad Abu-Hawash, Iowa Dept. of Transp. Dean Bierwagen, Iowa Dept. of Transp.

I-40 Inner Loop Bridges in Downtown Nashville Accelerated Bridge Construction Project utilizing CM/GC Project Delivery

Lia Obaid, Tennessee Dept. of Transp. Terry Mackie, Tennessee Dept. of Transp. Ted Kniazewycz, Gresham, Smith and Partners

Dorland J. Henderson Memorial Bridge/Manahawkin Bay Bridge Rehabilitation with Fast Curing MMA Polymer Materials Michael Stenko, Transpo Industries Inc.

Precast Concrete Deck Panels for Tappan Zee Bridge Mike LaViolette, HDR Inc.

Friday Breakout Sessions – Afternoon Room A Room B Room C Room D Room E

Session #26: Case Studies Session #27: State Experience Session #28: Moving Techniques

and Construction Session #29: New ABC Systems

Session #30: Light Weight and High Performance Concrete

1:1

0 –

1:3

0

New Jersey Route 36 Highlands Bridge Replacement: True Accelerated Bridge Construction.

Suhail Albhaisi, Jacobs Engineering Satsih Patel, Jacobs Engineering

Emergency Replacement of Bridges Geetha Chandar, Texas Dept. of Transp. John Holt, Texas Dept. of Transp. Jamie Farris, Texas Dept. of Transp. Mark Steves, Texas Dept. of Transp.

Quick Railing Installation system SMART LIFTER Shigehide Noda, NODA CRANE Nobuyuki Noda, NODA CRANE

A New Type of Precast Bridge Deck Connection

Dong-Ho Shin, Daewoo Inst. of Const. Tech. Se-Jin Park, Daewoo Inst. of Const. Tech. Hyun-Chul Oh, Daewoo Inst. of Const. Tech. In-Kyu Kim, Daewoo Inst. of Const. Tech. Young-Jin Kim, Daewoo Inst. of Const. Tech.

Hodder Avenue Underpass – An Innovative Modular Construction Approach with Ultra-High Performance Fibre-Reinforced Concrete

Eileen Li, Hatch Mott MacDonald Liang Guo, Hatch Mott MacDonald Biljana Rajlic, Hatch Mott MacDonald Philip Murray, Hatch Mott MacDonald

1:3

0 - 1

:50

Meeting the Goals of ABC with Buried Bridges

Matthew Richie, Simpson Gumpertz & Heger Jesse Beaver, Simpson Gumpertz & Heger

Korean National Modular Bridge Research Project Chan-Hee Park, RIST Gwang-il Cho, RIST Pil-Goo Lee, RIST

Replacement of the BNSF Approach Spans over the Mississippi River

David Rogowski, Genesis Structures Inc. Josh Crain, Genesis Structures Inc.

Precast GFRP-bar Reinforced Bridge System for Accelerated Bridge Construction

Zhibin Lin, North Dakota State University Mostafa Fakharifar, Missouri Univ. of Sci. & Tech. Fujian Tang, Missouri Univ. of Sci. & Tech. Genda Chen, Missouri Univ. of Sci. & Tech.

Internal Curing with Lightweight Aggregate for ABC Projects

Reid Castrodale, Expanded Shale Clay and Slate Institute

1:5

0 - 2

:10

Accelerated Construction of a Prefabricated Structural Deck for a Runway Safety Area Extension over Boston Harbor

Darren Conboy, Jacobs Engineering Group Stephen Berkeley, Jacobs Engineering Group Steven Halloran, Jacobs Engineering Group

Precast Bent Caps and Full Depth Deck Panels for US90 over Little River and Hurricane Creek Steven Nolan, Florida Dept. of Transp.

Construction Techniques - ABC Lateral-Slide Method Vincent Siefert, Siefert Associates, LLC Kevin O'Neill, Siefert Associates, LLC Chuck Neth, Siefert Associates, LLC

Innovative Precast Concrete Adjacent-Box-Beam System Implemented in St. Clair Bridge Chuanbing Sun, eConstruct.USA Amgad Girgis, eConstruct.USA Maher Tadros, eConstruct.USA Kyle Kopper, Michigan Dept. of Transp. Talia Belill, DLZ

Recent ABC Projects using Lightweight Concrete

Reid Castrodale, Expanded Shale Clay and Slate Institute

2:1

0 –

2:3

0

Sabula Accelerated Bridge Construction Case Study: US 52 Over Mississippi River Overflow James Nelson, Iowa DOT

Accelerated Bridge Construction (ABC) Gaining Momentum

Jugesh Kapur, Burns & McDonnell

Bridge Designer/Heavy Lift Coordination for Accelerated Bridge Construction Projects

Steve Haines, Parsons Matt Boben, Mammoet USA

NU Precast Deck Second Generation Fouad Jaber, Nebraska Department of Roads

Durability of Lightweight Concrete for ABC Reid Castrodale, Expanded Shale Clay and Slate Institute

2:3

0 –

2:5

0

A Signature Bridge on the Fast Track Theodore (Tad) Molas, Parsons Brinckerhoff Adrian Moon, Parsons Brinckerhoff

VTrans Fast 4 on VT Route 73 - Using Accelerated Bridge Construction and Road Closures to Expedite Project Delivery in Rural Communities

Jennifer Fitch, Vermont Agency of Transportation Scott Burbank, Vanasse Hangen Brustlin, Inc. Greg Goodrich, Vanasse Hangen Brustlin, Inc.

Accelerated Bridge Construction for the Skagit River Truss Bridge Collapse and Rebuilt

Bijan Khaleghi, Washington State Dept. of Transp.

New Processing Equipment Allows Bridge Construction 12 Months a Year

Charles Smail, Shelter Structures, Inc.

Hodder Avenue Underpass – Different Applications of Ultra High Performance Concrete (UHPC) Result in a first-of-its-kind Bridge

Kyle Nachuk, Lafarge

2:5

0 –

3:1

0

King Road Grade Separation Bridge Jacking Jeffrey Long, Hatch Mott MacDonald Jeb Pittsinger, Hatch Mott MacDonald

Eastbound Nalley Valley Interchange Marketing Substructures for Precast Bridge Elements Patrick Gallagher, Washington State DOT

Jacking of Railroad Bridges/ Underpasses without Stopping Trains

Riccardo Castracani, Petrucco USA LLC

A New Steel Solution for Short Span ABC Bridge Replacements in Massachusetts Thomas Zink, Gannett Fleming, Inc. Agnieszka Lapinski, Gannett Fleming, Inc.

Illinois’ First Precast Deck Panel Bridge with UHPC Joints

David Liu, TranSystems Jayme Schiff, Bureau of Bridges and Structures,

Illinois Department of Transportation

Visit www.2014abc.fiu.edu To see list of 170 technical

presentations and speakers

Nine 4-hour Workshops – December 3

1 - GeoTechTools – Geotechnical Solutions for ABC

2 - GRS-IBS – Geosynthetic Reinforced Soil Integrated Bridge System

for ABC

3 - Lightweight Concrete – A Tool for ABC, Part I

4 - Lightweight Concrete – A Tool for ABC, Part II

5 - Design Management (DM) Guide for Design-Build (DB) and

Construction Manager / General Contractor (CM/GC) Projects

6 - Rapid Replacement of Bridges using the SHRP2 R04 ABC Toolkit

7 - Lateral Slide Bridges: Overview for Owners, Designers, and

Contractors

8 - Design of Concrete bridges using AASHTO LRFD Bridge Design

Specification

9 - Design of Steel bridges using AASHTO LRFD Bridge Design

Specification

Awards to be given at the Conference

- An ad-hoc award committee – Five State bridge

Engineers to be the judge

- More detailed information – July 2014 webinar

www.2014abc.fiu.edu

Hotel Reservations

- A block of rooms at the Miami Hyatt Regency, at

a special Conference rate, is available

www.2014abc.fiu.edu

Registration Information

- Please visit www.2014abc.fiu.edu to:

- Register online

- Make your hotel reservation

- View complete conference and workshop

descriptions

- Information for exhibiting

- How to contribute to development of travel

scholarship

www.2014abc.fiu.edu

Automated Procedure

Issuing PDH Certificate

Notification Email:

Additional Certificate Form

Notification Email:

ENGINEERING NEWS-RECORD

(ENR) REGIONAL BEST PROJECTS

2014 AWARDS PROGRAM

Best Projects in the U.S. & Puerto Rico

Projects completed July 1, 2013 – June 30, 2014

Call for Entries Deadline: June 30, 2014

http://enr.construction.com/bestprojects/2014/

NCSEA 17TH ANNUAL

EXCELLENCE IN STRUCTURAL

ENGINEERING AWARDS PROGRAM

Projects completed Jan. 1, 2011 – Dec. 31, 2013

Bridge categories:

New Bridge and Transportation Structures

Forensic/Renovation/Retrofit/Rehab Structures

Call for Entries Deadline: July 11, 2014

http://www.ncsea.com/awards/

excellenceinstructuralengineeringawards/

2015 TRB Annual Meeting

Call for ABC Papers – due August 1

http://www.trb.org/AnnualMeeting2015/

AnnualMeeting2015.aspx

Lateral Slide Showcase August 14, 2014

US-131 North/Southbound bridge over 3 Mile Road

(Grand Rapids)

Julia Tanner/MDOT

517.335.2177

http://www.ctt.mtu.edu/sites/ctt/files/flyers/2014_BridgeSlideShowcase.pdf

MassDOT LRFD Bridge Manual – Part III

Prefabricated Bridge Elements

Ch. 1 – Precast Abutments

Ch. 2 – Precast Integral Abutments

Ch. 3 – Precast Approach Slabs

Ch. 4 – Precast Piers

Ch. 5 – Precast Concrete Deck Panels

Ch. 6 – Precast Tolerances

Web Search: “MassDOT Manual Part III”

Please visit

abc-utc.fiu.edu

for other ABC-related news and

events

Next Webinar

Tuesday, July 29, 2014 (1:00 – 2:00 p.m. Eastern)

Featured Presentation

Performance of ABC Bridges in Utah

by

Carmen Swanwick, P.E.,

Chief Structural Engineer,

Utah Department of Transportation

To register, visit: www.abc-utc.fiu.edu

Webinar Agenda

ABC Announcements (10 minutes)

Featured Presentation (35 minutes)

Precast Substructures, Part 2 –

Comparison of Non-Seismic and

Seismic Connection Details

M. Lee Marsh, Ph.D., P.E., President and CEO,

BergerABAM

Question and Answer (15 minutes)

Please post your questions in the chat box