Transcript of Pre proposal meeting - supervisory consultancy
Guyana Water IncorporatedWater Supply and Sanitation
Infrastructure Improvement Program
GY-L1040Pre- Proposal meeting with short listed Consultants
3rd July, 2015
Pre-ProposalSupervision and Mentoring Consultancy required for project execution phase for the Water Supply and Sanitation Infrastructure Improvement Program (WSSIIP)
WELCOME!
Programme Areas
Programme ObjectivesThe objective of WSSIIP is to enable the GWI to:1. Improve pressure, quality and continuity of
the water supply service in the program areas2. Reduce the level of Non-Revenue Water
(NRW) in the program areas3. Improve access to adequate sanitation in the
program areas4. Strengthen GWI performance in its
operational and management of water supply infrastructure
Component 1
Construction, rehab., & expansion of WTPs
Construction of 3 new WTPs inclusive of
transmission mains to/from new treatment
plant sites
Water treatment plant rehabilitated -
Shelterbelt, Central Ruimveldt & Sophia
Component 2
Non- revenue water program
One diagnosis and action plan for NRW reduction developed and implemented for each program area (including designs)
Network rehab. Works – transmission &
distribution mains
Installation of customer water meters.
Component 3
Institutional Strengthening of GWI
Activities to strengthen GWI administrative, financial and
commercial management
Capacity building activities on asset management & NRW
reduction
Activities to strengthen GWI’s water resource management &
Planning capabilities
Support for the implementation of a monitoring and evaluation
system to track the GWI performance in time
Activities to establish NRW functions within GWI
Component 4
Improved access to sanitation services
for low income households in the program areas
One thousand pit latrines upgraded to
efficient septic tanks.
At least three workshops held on
operation and maintenance of septic tanks.
Public Awareness campaign on
sanitation and hygiene
implemented.
Scope of Services1. Evaluation of bids and supervision of construction of three new water treatment plants, storage tanks, transmission and distribution mains within the treatment plant areas, and rehabilitation of one surface water plant at Shelterbelt based on the respective contract documents
Scope of Services Con’t2. Mentoring GWI staff on supervision of civil, mechanical and electrical works based on the works implemented under this program3. Development of standard operating procedures for new and upgraded systems4. Training of GWI staff on:Design of WTP’s (inclusive of process design)Operation and maintenance of the new systemContract and construction management,
environmental and social issues and water quality monitoring
General InfoProcurement method: QCBSProposals must be submitted no later than the following date & time:Date: July 21, 201509:00hrsThe proposal submission address is:
The Chairman National Procurement & Tender Admin Board
Ministry of FinanceMain & Urquhart Streets
Georgetown, Guyana.
Expected commencement date for consulting services: October 26, 2015
Duration of Services: 42 months
Special Emphasis – Evaluation CriteriaSpecific experience of the Consultants
relevant to the assignment: 10 Adequacy of the proposed methodology and
work plan in responding to the Terms of Reference: 25
Key professional staff qualifications and competence for the assignment: 45
Suitability of the transfer of knowledge (training) program: 10
Participation by nationals among proposed key staff: 10
Minimum technical score required to pass: 70 points
General DiscussionQuestions - ?
Comments - …..
Concerns - ……