Pre-installed cable bolts for two-pass installation roads
Ross Seedsman
![Page 2: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/2.jpg)
Outline • Previous controversial ideas. • Accepted wisdom on cable
bolts. • Ground characteristic and
support reaction. • Case study - Two-pass
longwall installation road. – Application of some
simple tools. • Recommendation - debond.
Top of potential spanning unit
Height of compressive failure
![Page 3: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/3.jpg)
Some 2014 controversies
0 2 4 6Height of softening (m)
0
20
40
60
80
100
Dis
plac
emen
t (m
m)
0 20 40 60 80 100Displacement (mm)
0
2
4
6
Hei
ght o
f sof
teni
ng (m
)1. Preinstalled cables may rupture
2. Roof displacement is the dependent variable
![Page 4: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/4.jpg)
Stress-induced boundary crushing
• Cover page, • Page 254
It should be noted in any case that cablebolts are unlikely to arrest the onset of rock failure under high stress, and may do little to alter the progression of such failure into the rockmass. The objective here is to hold the failed material in place so that the broken rock itself can generate the necessary confinement to reduce the extent of progressive damage and instability. In highly plastic (deformable) rockmasses under high stress, it is also unlikely that cables will be effective in arresting the progression of failure. In addition, in these environments, the induced displacements may be too great for the system to handle and cable strand rupture may be inevitable in pre-installed systems.
![Page 5: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/5.jpg)
Stress shadowing and relaxation Low stresses can pose as much a risk as high stresses in a fractured or jointed rock mass. While even modest stresses across a back or sidewall can serve to clamp the rockmass blocks in place…. gravity will dominate once these stresses decrease. In an elastic model….. Zones of “tension” or zones of near-zero stress in, for example in a stope wall indicate potential problem areas. Zones of relaxation pose additional hazard for cablebolting. … stress decreases across a cable array can seriously impair the bond strength of plain strand cablebolts. Rockmass stiffness is also dependent on confinement in fractured rockmasses and decreases with relaxation. This has a compounded detrimental effect on cable capacity - just when bond strength is needed the most. It is for this reason that plating and the use of modified strand cablebolts are recommended in fractured-destressed rock
![Page 6: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/6.jpg)
The relaxing/debonding problem
Har
d ro
ck
Soft
rock
Hei
ght
Imposed stress normal to borehole wall
Gro
ut
Gro
ut
![Page 7: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/7.jpg)
Ground reaction curve in the Logical Framework
Displacement
Supp
ort p
ress
ure
Preinstalled
Partial debond
Pretensioned, fully grouted
Gravity collapse – suspension – horizontal line
Suspension
![Page 8: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/8.jpg)
Possible application to installation roadways
…..the cablebolts installed normal lo the laminations covering the span area should be designed as stiff reinforcement within the zone of rock equivalent in thickness to a self supporting beam as calculated in this analysis…..Beyond this limit, an optimum cable array should have a more ductile response to allow the beam to deflect a small amount to generate the required compression for stability . Beyond this should be a suitable anchorage length. If the cables can hold the weight of this beam then stability should be assured. This result is usually more efficient than a pure deadload estimate on a relaxing hangingwall (no beam formation)
![Page 9: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/9.jpg)
![Page 10: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/10.jpg)
Case study
• 260 m depth. • In-situ horizontal/vertical stress = 1.8. • Stress-relieving roadway at 14 m
offset. • 11 of 2.1m X grade bolts @ 1m. • 3 of 8m fully grouted 60 tonne cables
on first pass @ 2m. • No movement on the first pass. • 1 additional fully 8m cable @2m on
second pass. • >100 mm surge, 30 mm - 40 mm at
1.8 m horizon on the second pass. • No loads on cable plates. • Loads on some bolt plates. • Loud, sharp bangs in the roof.
![Page 11: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/11.jpg)
Phase2 model suggests failure of the low strength siltstones
2.823
Strength Factor0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
86
42
0
-2 0 2 4 6
3.800
Strength Factor0.00
0.10
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
86
42
0
-2 0 2 4 6 8
![Page 12: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/12.jpg)
Stress-relief assisted on the first pass
Stress relief
First pass
Second pass
![Page 13: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/13.jpg)
Possible explanations (#1 & #2)
Contours - either breaking of cables due to strain incompatibility during compressive failure
or de-bonding due to stress relaxation after compressive failure
Cross hatch indicates
suspended load
Hei
ght
Imposed stress normal to borehole wall
Enough debonded length to accommodate displacements
![Page 14: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/14.jpg)
A 0.35 m thick layer of the medium-grained sandstone can explain alot
0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8Beam thickness (m)
0.1
1
10
100
Cen
trelin
e de
flect
ion
(mm
)
0.603
1.08
3.34
8.6
16
1.64
0.637
1.63
0.898
3.73
8.75
1.19
5.2 m spans9 m spans
Numbers are stability factors
![Page 15: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/15.jpg)
The ground characteristic of a voussoir beam
0
10
20
30
40
50
60
70
80
90
100
0 10 20 30 40 50 60 70 80
Supp
ort p
ress
ure
(kPa
)
Deflection (mm)
0.4m thick unit
0.2m thick unit
0.3m thick unit
![Page 16: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/16.jpg)
Cable reaction depends on un-bonded length
INCR
EASI
NG
EN
ERGY
AB
SOPT
ION
![Page 17: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/17.jpg)
Support efficiency when cables loaded eccentrically
First pass Second pass
![Page 18: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/18.jpg)
Ground reaction patterns for installation roadway
![Page 19: Pre-installed cable bolts for two- pass installation roadsbbugs.org.au/.../3.-Ross-Seedsman_FINAL-BBUGS-Cable-bolting-in-lo… · Pre-installed cable bolts for two-pass installation](https://reader033.fdocuments.us/reader033/viewer/2022051723/5aad91c57f8b9a59658e7dec/html5/thumbnails/19.jpg)
Recommendations for cables: Plate and debond
Top of potential spanning unit
Height of compressive failure