PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

53
PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011

Transcript of PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Page 1: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

PRACTICAL SEAMANSHIP

SAR Crew ManualChapter 05

DEC 2011

Page 2: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.
Page 3: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Seamanship

• Seamanship is covered by three fundamental principles

1. Order - every to be kept in its place so it can be easily found when required

2. Redundancy - critical systems doubled up - actions and procedures double checked

3. Habit - ingraining habits e.g. lines are coiled, closed loop communication is used, and correct helm orders are used

Page 4: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Ropes

Page 5: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Types of Rope Lay

• Cable laid (Left hand)

• Hawser laid (Right hand)

• Plaited

• Braided

Page 6: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Types of Rope Lay

• Cable (Left Hand) Laid• In this example three right laid ropes (top) are turned into the cable laid rope (bottom).

Page 7: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Types of Rope Lay

• Hawser (right hand) laid

Page 8: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Types of Rope Lay

• Plaited

Page 9: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Types of Rope Lay

• Braided

Page 10: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Components of a Line

Page 11: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Parts of a Line

Page 12: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Rope Materials

Page 13: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Rope Materials

• Ropes may be made out of many materials.

• Natural fibres - sisal, manilla, hemp, and cotton - not generally used on rescue vessels

• Artificial fibres - polypropylene, nylon, polythene, polyester and certain proprietary materials.

Page 14: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Rope Materials

• There are other sorts of artificial fibre rope such as Kevlar, Bahamas, Tendon, Kapron, which have their own properties.

Page 15: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Polypropylene• The most common rope in use is

polypropylene. It melts at 160 degrees celcius and therefore has the lowest melting point of the artificial fibre ropes.

• If you are putting a wet polypropylene rope under tension, if you see rising steam from it, stand back as it could be about to break.

• It is light and it floats.• It is susceptible to ultra violet damage.

Page 16: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Line Handling

Page 17: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Line Handling• Line handling is carried out by the crew. This

involves:

1. crew safety in their part of the vessel

2. ensure that the docking/undocking plan is clear

3. inspecting lines are in good condition

4. stow away loose gear and coil lines

5. keep colleagues safe by warning of bights and lines under tension

Page 18: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Line Handling

6. keep lines clear of the propeller and warn coxswain when they are not

7. give feedback on progress of operations involving lines

Page 19: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Coiling a Rope

Page 20: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Samson Posts

• When making fast a line on a samson post, first make one full turn, before starting belaying the line around the staghorns.

Page 21: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Samson Posts

• On turning up on a samson post or tow post, locking tucks are not to be used.

Page 22: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Heaving Lines

Page 23: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Heaving Line Use

• Ensure line’s bitter end is secure to own vessel. • The best way to prepare a heaving line is to

make a small diameter (18”) coil. Once enough line has been coiled, split the coil in two, holding half the coil and heaving line knot in the right hand, and the other half of the coil in the left hand.

Page 24: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Heaving Line

• Extend both arms to your right, look at where you are throwing.

• Swing the heaving line coils anti clockwise and upwards at about 30 degrees, releasing both parts of the coil when on line with the target.

Page 25: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Heaving Line

Page 26: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Line Inspection

Page 27: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Line Inspection

• All lines should be checked regularly along their length for:

1. Broken fibres, cuts, abrasion, unlaying, reduction in diameter, all of which mean a reduction in strength.

2. Powder within the lay which can be a sign of excessive wear.

3. Absorption of oils or chemicals that may adversely affect the rope.

Page 28: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Signs of Overload during Use• Warning signs

1. Groaning, creaking or popping sounds

2. Rotating and/ or stretching

3. Shrinking in diameter

4. Loss of shape

5. Yarns or fibres (and ultimately strands) breaking and peeling

6. Steam rising from a wet rope (polypropylene)

Page 29: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Dangers of Overload

• The biggest danger with overload of a artificial fibre lines, where they have a larger capacity for stretching or shock absorbency, when they do break they will return instantly to their unloaded length, causing a severe whip lash.

• This can injure an inattentive crew member.

Page 30: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Danger Zone

Page 31: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Knots

Page 32: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Knots

• All good knots should

1. Be easy to tie

2. Be easy to undo after being loaded

3. Be safe when properly used

• Knots in ropes will reduce the breaking strain of that rope in way of the knots, by about 50%

Page 33: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Reef Knot

Used for joining two ropes of the same size together

Not to be used for lines under load

Page 34: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Clove Hitch

Perhaps the most widely used of the hitches is the clove, or ratline, hitch. It is especially practical for making a rope fast to a pole or similar object.

Page 35: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Round Turn and Two Half Hitches

This is a very useful knot for tying a rope to a post. It can be tied in a rope that is under tension making it useful for boat mooring

Page 36: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Figure of Eight

This knot is best when acting as a stopper knot, tied at the end of a line to stop it being pulled through an eye.

Page 37: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Bowline

The Bowline is by far one of the best-known and oft used knots. Used to form a fixed loop at the end of a line, the Bowline can be tied with one hand, does not jam and is reasonably secure.

Page 38: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Sheet Bend

• The sheet bend is very fast to tie and when slipped, is one of the easiest bends to work with. It is also useful when joining two ropes of different diameters. In this example the red line would be the smaller diameter.

Page 39: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Mooring and Securing the Vessel

Page 40: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Mooring Lines

Page 41: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Mooring Lines

When one end of the mooring line is made fast on the vessel, and is to be a slip rope, the line is to be passed under the object on the dock before returning on board and making fast.

Page 42: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Cleats

Mooring rope should be belayed on a cleat, without use of any locking tuck

Page 43: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Anchors

Page 44: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor

Stock

Shank

Fluke

Crown

Page 45: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor• Shank - aids in

setting and weighing the anchor

• Flukes - dig into the bottom to increase holding power

Shank

Fluke

Page 46: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor• Crown - the swivel

between flukes and shank

• Stock - the part of the anchor to discourage toppling or turning of the anchor

StockCrown

Page 47: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor• At the top of the anchor

shank, there is a swivel and then a length of chain, normally the length of the boat, to which is attached the anchor line.

• The chain adds weight to the anchor and also takes the chafing of the sea floor.

Page 48: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor• Once the chain or rode

is shackled to the anchor, the shackle must be moused with a wire to stop the pin coming out.

Page 49: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

The Anchor

Page 50: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Anchoring• Anchoring is a process with steps that cannot

be skipped.• If you wish to do it right the first time, double

check your gear.• The bitter end of the anchor line must be tied

to the boat, generally with a weak link - a line of lesser diameter and strength to the rode.

• Know the type of sea floor where you are intending to anchor - rocks, sand, or mud.

Page 51: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Anchoring

1. Check the anchor and chain are made fast to the line, and line is made fast to the boat.

2. Approach spot slowly, and when over the spot, go astern to take off headway.

3. Start lowering the anchor and when starting to move astern, lower the anchor to the bottom.

Page 52: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Anchoring

4. Take a turn around the post, and take a little weight to dig in the anchor and then lower the rest of the line to the required scope.

5. Go neutral and stop the engines.

6. When weight comes off the chain, you are anchored.

7. Make a note of the position, and periodically check that position.

Page 53: PRACTICAL SEAMANSHIP SAR Crew Manual Chapter 05 DEC 2011.

Weighing Anchor

1. Start engines, and go slowly ahead to take weight off anchor and line.

2. Pull in the slack of the line.

3. When over the anchor, lift remaining line, chain and anchor into the boat.

DO NOT allow boat to overshoot, and come ahead of the anchor and allow line to get into the propellers.