Practical Measures to Tackle Climate Chaos
David Somervell, Energy & Sustainability Manager
University of Edinburgh – Estates & Buildings Department13 Infirmary Street, Edinburgh EH1 1LT Tel 0131 650 2073 http://www.eso.ed.ac.uk [email protected]
Universities and Colleges
1. Crisis? What Crisis? [It is for real]
2. How will this affect our institution?
3. Developing a Strategic Approach
4. Invest now in Utilities Infrastructure
5. Decentralised Energy on Campus
By 2050 we must cut CO2 emissions by 7 GtC with a 1.3 GtC cut by 2025, against projected ‘Business as Usual’.
1990
550 ppm
450 ppm
6 -
5 -
4 -
3 -
2 -
1 -
°C
Glo
ba
l C
arb
on
Em
iss
ion
s,
GtC
WRE 1000 (IPCC)WRE 550 (IPCC)WRE 450 (IPCC)
1000 ppm
2100
ran
ge
Fu
rth
er r
ises
to
230
0
205020402030202020102000
6
8
10
4
12
14
16
2
2000 2010 2020 2030 2040 2050
9
11
13
7
Glo
ba
l C
arb
on
Em
iss
ion
s,
GtC
20251.3 GtC reduction
Facts & TrendsIPCC Scenarios
20506-7 GtC reduction
Facts & Trends9 GtC world
BAUPathways to 2050
Projections & Required Reductions
Extreme droughts will plague sub-Saharan Africa. Children stand behind one of thousands of livestock that died from thirst in southern Ethiopia. [REUTERS March 2006]
What’s needed?
1. Interested, Enthusiastic People2. Senior Management Support 3. Allocation of Resources (Money)
PLUS … Some Measure of Luck / Timing!
Edinburgh:
“University
in the City”
… invested
£12million in
Decentralised
Energy / CHP
2002-2005
Pollock Halls 526kWe CHP
King’s Bldgs 2.7MWe CHP
George Sq 1.6MWe CHP
Edinburgh’s 3 CHP Projects
1. Pollock Halls: 526kWe engine serving student residences as lead boiler – 2003
2. The King’s Buildings: 2.7MWe engine displaced old steam system + 2 new 7.5MW LTHW boilers serving high base load – 2004
3. George Square: 1.6MWe engine again replaced steam system – plus 75 tonne Heat Store and 600kW Absorption Chiller to even out load – 2005
UK Energy Flows – 50% wasted
Combined Heat and Power
George Sq: Trigeneration
George Square Energy Centre
George Sq buildings now linked:
First remove old steam boilers…First remove old steam boilers…
1.6MWe Alternator bolts on
High Efficiency, Low NOx BoilerHigh Efficiency, Low NOx Boiler
75 cubic metre Thermal Store75 cubic metre Thermal Store
• GE Jenbacher 612 Engine
12 cylinder Jenbacher Engine12 cylinder Jenbacher Engine
600kW600kW Absorption ChillerAbsorption Chiller
Thanks to our CHP Partners
• Energy Saving Trust – for funding support
• PB Power – for Scheme Design
• Crown House Technologies – Main Contractor
• Estates & Bldgs Works Div’n – implementation
• Clarke Energy – Jenbacher Maintenance
www.eso.ed.ac.uk
Rankine Engineering Building
Building Integrated PhotoVoltaics
Why we have done this …?
• Save money long-term
• Invest in infrastructure
• Annual Carbon savings
• Leadership role
…because there is only 1 planet