Project Team
Client – UCB Athletics– Tom McGrath, Sr. Assoc. Athletic Director– Tom McGann, Dir. Game Mgmt & Operations
UCB Planner – Tom Goodhew UCB Project Mgr – Katherine Dunklau Architect – Sink Combs Dethlefs
– Andy Barnard, AIA– Steve King, AIA
Overview - Project Description
Addition to the north side of the Coors Event Center
Approx. 36,000 sf, two practice courts Est. Construction Cost - $8M Est. Construction Period – March 2010 to
March 2011
Construction Goals
Bidding Period – Approx. February 2010
Begin Construction – March 2010
Substantial Completion – March 2011
Construction Issues
Asbestos abatement approx. 100 lf tar impregnated black felt on 14” dia. HPS line
Temporary steam line Site lay down area Utility relocations Fire sprinkler work within CEC Excavation – approx.15’ cut
Construction Issues (cont.)
Working adjacent to occupied building Campus – faculty, staff, and students Parking
Submittal Requirements
Be sure to meet the minimum requirements Please provide information in the order
outlined with TABS Provide relevant information Include forms
– Affidavit– MWBE