Petroleum Development Oman L.L.C.
Engineering and Operations
Maintenance and InspectionActivity Variance andDeviation Control
User Note:
The requirements of this document are mandatory. Non-compliance shall only be authorised bythe Document Owner or his Delegate through STEP-OUTapproval.
controlled copy of the current version of this document is on !DO"s #D$%. &efore ma'ingreference to this document( it is the user"s responsibility to ensure that any hard copy( orelectronic copy( is current. )or assistance( contact the Document Custodian or the DocumentController.
Users are encouraged to participate in the ongoing improvement of this document by providingconstructive feedback.
Please familiarise yourself wit teDocument Security Classification Definitions
!ey also apply to tis Document"
This document is the property of !etroleum Development Oman **+. Neither the whole norany part of this document may be disclosed to others or reproduced( stored in a retrievalsystem( or transmitted in any form by any means ,electronic( mechanical( reprographicrecording or otherwise without prior written consent of the owner
#$%E&!%IC!ED Document ID' P%()**+Aug()* ,iling -ey' usiness Control
mailto:[email protected]?subject=Ref:%20SP-1219,%20Well%20Engineering%20H2S%20Specificationmailto:[email protected]?subject=Ref:%20SP-1219,%20Well%20Engineering%20H2S%20Specificationmailto:[email protected]?subject=Ref:%20SP-1219,%20Well%20Engineering%20H2S%20Specificationhttp://sww3.pdo.shell.om/getdoc?dataid=3966312mailto:[email protected]?subject=Ref:%20SP-1219,%20Well%20Engineering%20H2S%20Specificationmailto:[email protected]?subject=Ref:%20SP-1219,%20Well%20Engineering%20H2S%20Specificationhttp://sww3.pdo.shell.om/getdoc?dataid=3966312 -
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
2/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
This page was intentionally left blank
!age 2 P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
3/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
i Document Autorisation
Autorised ,or Issue August /*)*
!age 7 P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
4/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
ii %evision 0istory
The following is a brief summary of the / most recent revisions to this document. Details of allrevisions prior to these are held on file by the issuing department.
%evision $o. Date Autor &cope 1 %emar2s
/.0 ug-10 obin Norman UO!8 )ull evision. $ain additionsalignment of Non-%+# ctivity9ariance and addition of )% for %+#Deviation
7.0 Dec. 01 *eo de &est lignment of deviation bands to %!!$ wor' order management
2.0 pr. ;; %haun
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
5/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
!ALE O, CO$!E$!&
1 =ntroduction...........................................................................................................................7
1.1 &ac'ground.....................................................................................................................7
1.2 !urpose...........................................................................................................................7
1.7 Distribution 4 Target udience..........................................................................................7
1./ +hanges to the Document...............................................................................................7
1.3 %tep-out pproval............................................................................................................7
2 oles and esponsibilities....................................................................................................7
7 $aintenance and =nspection ctivity 9ariance and Deviation +ontrol..................................7
7.1 Non-%+# 9ariance +ontrol..............................................................................................7
7.1.1 Overview...................................................................................................................7
7.1.2 +ompliance +ategory...............................................................................................7
7.1.7 !lanning....................................................................................................................77.1./ Non-%+# $aintenance and =nspection ctivity 9ariance +ontrol !rocess...............7
7.2 %+# Deviation +ontrol....................................................................................................7
7.2.1 Overview...................................................................................................................7
7.2.2 %+# $aintenance and =nspection Deviation +ontrol !rocess..................................7
ppendi? 1 @ $aintenance and =nspection Deviation anges.....................................................7
ppendi? 2 - bbreviations.......................................................................................................... 7
ppendi? 7 @ eference $aterial.................................................................................................7
ppendi? / - User )eedbac' !age.............................................................................................. 7
,I7#%E&
)igure 1 - +ompliance and !lanning Dates and Data..............................................................;
)igure 2 @ $aintenance and =nspection ctivity 9ariance +ontrol !rocess )low....................11
)igure 7 @ Aigh *evel %+# Deviation !rocess.......................................................................17
!age 3 P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
6/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
) Introduction
).) ac2ground
$aintainable =tems in the sset egister are recorded in the +omputerised$aintenance $anagement %ystem ,+$$% . #ach maintainable item will be allocateda maintenance and 4 or inspection routine which will be managed and maintained bythe +$$%.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
7/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
).+ &tep(out Approval
Not applicable for this procedure.
!age > P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
8/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
/ %oles and %esponsi9ilities
Operations Manager Approve ,&% Deviation 30ig %is25
Delivery !eamLeader
Approve ,&% Deviation 3Low and Medium %is25
Provide input at Maintenance Callenge Meeting
Accounta9le for te aderence to te planning of
activities and e:ecution witin te deviation 9ands
Corporate Discipline,ocal Point
Approve ;< $otification for $on(&CE canges
%eview ,&% Deviation re=uest
Approve &CE &tandard
!ecnical Autority 1Discipline Engineer
%eviewing ,&% Deviation re=uest
Developing !ecnical &tandards wen re=uired
Area PlanningEngineer
&cedule maintenance and inspection tas23s5 to
realise >opportunities?
Provide input at Maintenance Callenge Meeting
%aise ;< $otification for >loo2 aead maintenance?
Create ,&% deviation re=uest for &CE as re=uired
Area Planner &cedules te Maintenance and Inspection tas2s
into wee2ly or montly plans
Integrates Contractor scedules
MaintenanceCoordinator
Cairs te Maintenance Callenge Meeting
Create ,&% Deviation re=uest
Maintenance
&upervisor
Advise Maintenance Coordinator of Activity
Variance
%aise ;< $otification for $on(&CE canges
Create ,&% Deviation re=uest
ProductionCoordinator 1
Attends Maintenance Callenge Meeting
Create ,&% Deviation re=uest
!age 5 P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
9/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
8 Maintenance and Inspection Activity Variance andDeviation Control
There are two methods for controlling 9ariance and Deviation ctivities( one beingapplied to non-%+#Bs and the other to %+#Bs. Non-%+#Bs are recorded and controlled
using the 8 Notification and %+#Bs through the )acilities %tatus eport ,)%. The 8is an integral function of the +$$%( whereas the )% is an e?ternal . This is the date planned in +$$% for the
wor' to be underta'en.
Original Due )inish @ 0/-12-200>. This is the date planned in +$$% for the
wor' to be completed and signed off.
!age ; P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
http://sww3.pdo.shell.om/getdoc?dataid=3253224&objAction=downloadhttp://fsr.pdo.shell.om/webhelp/index.htm#5_deviations/5.9_Searching_for_an_Existing_Deviation.htmhttp://fsr.pdo.shell.om/webhelp/index.htm#5_deviations/5.9_Searching_for_an_Existing_Deviation.htmhttp://sww3.pdo.shell.om/getdoc?dataid=3253224&objAction=downloadhttp://fsr.pdo.shell.om/webhelp/index.htm#5_deviations/5.9_Searching_for_an_Existing_Deviation.htm -
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
10/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
The wor' has been allowed a deviation range of >7 days called the >!olerance indays?. This is a function of the Compliance CategoryB and interprets in this illustrationto an allowance of >7 days to plan the start of the wor' from the >Original Due &tart?.&ased on this the >Original Latest Allowed &tart Date 3OLA&D5? becomes )+(*/(/**. This is original due start C B8days. =f the wor' were to be completed within the>deviation range?then the >Original Latest Allowed ,inis Date 3OLA,D5?would be
)+(*/(/**.
Aowever in )igure 1 the Latest Allowed &tart Dateis still )+(*/(/**but the LatestAllowed ,inis Dateis 8)()/(/**which indicates that an ctivity 9ariance has beenapplied to the wor'.
#ffectively this means that the required e?ternal inspection of the vessel can bedeferred until 71-12-200; before the vessel is no longer in compliance and requires tobe removed from service.
3 2 Compliance Category
The compliance category is obtained from a data base which lists the tas' listsB and the
deviation band allowed. The deviation bands will be reviewed and approved by the+orporate Discipline )ocal !oint ,+D)! at least every two years. The compliancecategory is used to develop the tolerance periodB.
3 3 Planning
The +$$% can produce loo'-aheadB plans for two years and ;0 days which the =!planner will use to minimise deferment and optimise resources.
s previously stated all +$$%
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
11/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
3 4 $on(&CE Maintenance and Inspection Activity Variance Control Process
,igure / Maintenance and Inspection Activity Variance Control Process ,low
1.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
12/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
0otification Procedure%ection 7.8.
/. pproval of the 8 by the +D)! will enable a new latest allowable start and 4 orfinish date to be entered into +$$% and a new updated
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
13/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
,igure 8 0ig Level &CE Deviation Process
0OTE1 The FS$ records and mana)es failures of the SCE barriers due to breakdo2nand malfunction in addition to maintenance and ins!ection acti4ities.
,lag &tatus
%+#Bs status is monitored in )% using flags( ed( mber and Ereen.
ed a severity status indicating an unacceptable reduction or loss of Technical=ntegrity that requires immediate attentionF
mber severity status indicating an imminent need for action or a temporary(controlled reduction in Technical =ntegrity that requires time-bounded action
Ereen severity status indicating no current integrity impact
red flag will signal the %+# is out of compliance e.g. outside of latest allowable start 4finish date( and requires a deviation to be raised immediatelyF an amber flag will signalthe %+# is approaching non-compliance and a deviation should be prepared orremedial actions carried outF a green flag indicates the %+# is in compliance.
The method for raising a deviation is covered in detail in the overview help or helpinde? in the )%
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
14/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
ris' assessment using the is' ssessment $atri? ,$ is carried out on the %+#that has entered( or is about to enter non-compliance. The ris' assessment uses !#to provide the overall ris' severity. ll information including the participants of the ris'assessment is entered in )%.
Mitigation Actions
)ollowing the ris' assessment mitigation will be proposed to address the findings andreduce the ris's to *!. The mitigation implemented will be reviewed and recorded.
E:ecute Mitigation Action
This is outside of )% and is reliant on close inspection and monitoring to ensure thatall required measures identified to reduce the ris' of an incident are implemented.
%eview and Approval
)% is configured to provide a Gey eviewerB for each type of %+#( who will have thecorrect level of technical authority and e?perience. ll reviewer can also nominateadditional reviewers if and as required.
Documentation to bac' up the deviation can be attached and sent via a wor' flowB to
the appropriate reviewers.epairs or modification that may be recommended to support the deviation and willrequire to have a standard provided or an e?isting standard modified. The standardrequires to be approved by the appropriate technical authority before the deviation canbe approved.
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
15/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
Appendi: ) Maintenance and Inspection Deviation %anges
The embedded file contains a spreadsheet of $aintenance and =nspection Deviationanges that are applied to +$$%
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
16/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
Appendi: / ( A99reviations
The following abbreviations are used in this !rocedure.
+D)! +orporate Discipline )ocal !oint
+$$% +omputerised $aintenance $anagement %ystem
)% )acility %tatus eport
=! =ntegrated ctivity !lan
*)D *atest llowed )inish Date
O*)D Original *atest llowed )inish Date
O*%D Original *atest llowed %tart Date
!# !eople( #nvironment( sset( eputation
$ is' ssessment $atri?
%+# %afety +ritical #lement
T Technical uthority
-
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
17/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
Appendi: 8 %eference Material
Code of Practice
CP-**5 Maintenance and 3nte)rit( Mana)ement CoP
CP-*+/ 3nte)rated cti4it( Plannin) CoP
Procedure
P$-*+%, / 0otification Procedure
P$-*6%* Shutdo2n Mana)ement
On(Line 0elp
Facilit( Status $e!ortin)
&ell Process
EP %&&'-'&&' Safet( Critical Element Mana)ement.
!age 1> P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.
http://sww3.pdo.shell.om/getdoc?dataid=92911&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=6758507&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=3253224&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=8934087&objAction=downloadhttp://fsr.pdo.shell.om/webhelp/index.htm#5_deviations/5.9_Searching_for_an_Existing_Deviation.htmhttp://epgraphics.europe.shell.com/restricted/report/2009/ep2009-9009/ep2009-9009.pdfhttp://sww3.pdo.shell.om/getdoc?dataid=92911&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=6758507&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=3253224&objAction=downloadhttp://sww3.pdo.shell.om/getdoc?dataid=8934087&objAction=downloadhttp://fsr.pdo.shell.om/webhelp/index.htm#5_deviations/5.9_Searching_for_an_Existing_Deviation.htmhttp://epgraphics.europe.shell.com/restricted/report/2009/ep2009-9009/ep2009-9009.pdf -
7/23/2019 PR-1005 - Maintenance and Inspection Activity Variance Control Procedure
18/18
Petroleum Development Oman LLCevision: /.0
#ffective: ug-10
Appendi: 4 ( #ser ,eed9ac2 Page
P%()**+ Maintenance and Inspection Activity and Deviation varianceControl #ser ,eed9ac2 Page
ny user who identifies an inaccuracy( error or ambiguity is requested to notifythe custodian so that appropriate action can be ta'en. The user is requestedto return this page fully completed( indicating precisely the amendment,srecommended.
$ame'
%ef ID Date'
Page %ef' rief Description of Cange %e=uired and %easons
#OM/
Custodian of Document Date'
!age 15 P%()**+ ( Maintenance and Inspection Activity andDeviation Variance Control
!rinted 13405410
The controlled version of this +$) Document resides online in *ivelin'6. !rinted copies are UN+ONTO**#D.