PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was...
Transcript of PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was...
![Page 1: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/1.jpg)
ADS-BUAE IMPLEMENTATION
CNS SG/8-PPT/8
![Page 2: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/2.jpg)
Background
2
• In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh Zayed Air Navigation Center.
• At the time the daily movements were around 1000 however as of 2018 the daily movements are now around 2800.
• While the UAE doesn’t have a big FIR, it is highly complex and spilt into an upper and lower airspace.
• In December 2017 the UAE implemented the ARP3 which was a total overhaul of our FIR to facilitate air traffic growth throughout our FIR.
• To facilitate the traffic growth within the region comprehensive, redundant surveillance coverage is required as one of the enablers.
• Redundant Mode S radar coverage is available throughout our FIR however a radar station has a lifespan of around 15 year and replacing a site is extremely expensive.
• The cost benefit of replacing/supplementing radars with additional ADS‐B sites is a huge saving however a clear mandate needs to be in place to ensure all users of the FIR are ADS‐B equipped.
![Page 3: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/3.jpg)
UAE FIR – Post ARP3
3
![Page 4: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/4.jpg)
CURRENT UAE FIR
4
![Page 5: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/5.jpg)
CURRENT UAE UPPER FIR
5
![Page 6: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/6.jpg)
CURRENT UAE LOWER FIR
6
![Page 7: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/7.jpg)
Current ADS-B coverage
7
![Page 8: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/8.jpg)
ADS-B COVERAGE - FL130 TO FL450
8
![Page 9: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/9.jpg)
9
ADS-B CONFIGURATION AND FUTURE PLANSCurrently we have 8 redundant en route ADS-B sites throughout the UAE.The following is planned:1 new site – Q1 20181 WAM system – Q4 20181 new site Q1 20201 new site Q4 2020
Based on a study GCAA did in 2015 around 60% of civil carriers using the UAE FIR were ADS-B compliant. As of Q1 2018 more than 95% of civil carriers are ADS-B compliant.
![Page 10: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/10.jpg)
10
ADS-B CONFIGURATION AND FUTURE PLANSAs per the CAR Part IV, Operation Regulations, CAR – OPS 1 Commercial & Private Air Transportation (Aeroplanes):
CAR-OPS 1.867 ADS-B (OUT and IN)a) ADS-B OUTAn operator shall not operate an aeroplane under IFR after 01 January 2020, unless it is equipped with ADS-B OUT.b) ADS-B INAn operator shall not operate an aeroplane equipped with the ADS-B IN capability unless approved by the GCAA.
![Page 11: PPT8- ADS-B coverage SG8... · CNS SG/8-PPT/8. Background 2 • In 2009 ADS‐B coverage was installed throughout the UAE for operational use as part of the new ACC, Sheikh ZayedAir](https://reader033.fdocuments.us/reader033/viewer/2022050102/5f40fe61b2c5790e3d0a57f2/html5/thumbnails/11.jpg)
11
THE END