Ppt Showing Budget & Project Validation Plan
Click here to load reader
-
Upload
abhishek-pathak -
Category
Documents
-
view
61 -
download
0
Transcript of Ppt Showing Budget & Project Validation Plan
TEAM DOERS
TEAM WORK ALLOCATIONS
BRAKING & STEERING SYSTEM
TEAM MANAGEMENT
DESIGN
SUSPENSION
POWERTRAIN
Meraj ahmad ( treasurer) Abhishek Pathak ( Team Captain) Himank Gulati ( vice –chairperson )
Omair Musheer Rehmatullah Khan Viqar Ahmad Prashant singh
Ishan sharma Meraj Ahmad Shashank gupta
Prashant Singh Ishan sharma Abhishek pathak
Md. Hasnain Jamshed aalam Syed aley haider
TEAM WORK ALLOCATIONS
ELECTRICAL SECTOR Apurv pratap s ingh Yash maheshwari
DRIVER Zeeshan husain (main driver) Ryhan sayeed ( co – driver )
Out of 23 members of our team, 11 of them are from POLYTECHNIC , who have enough 3 years experience of workshop for our fabrication purposes
Also, we have got permission for using workshops of both engineering & polytechnic faculties , with support from staff members too.
NAME UNITS PRICE/UNIT (INR) TOTAL
STRUTS 6 2500 15000
HUBS 4 2000 8000
UPRIGHTS 4 2500 10000
WHEEL BEARINGS 4 2000 8000
BALL JOINTS 20 300 6000
PIPE ASTM 106 GRADE BO.D 33.4mm 17 m 260/m 4420O.D 26.7 mm 19m 211/m 4009
TYRES 4 7000 28000
RACK & PINION 2 550 1100
TIE RODS 4 300 1200
BUDGET ESTIMATE FOR FABRICATION
MUFFLER & CATALYTIC 1 1000 1000CONVERTOR
RECARO SEAT 1 7000 7000
DRIVE SHAFT ASSEMBLY 1 2500 2500
DRIVER SAFETY GEAR 1 30000 30000
BATTERY 1 2500 2500
MASTER CYLINDER 1 750 750
DISK PLATES AND CALLIPERS 4 800 3200
KILL SWITCH 2 250 500
BRAKE LIGHT 2 250 500
ALUMINIUM SHEETS 3000
TRANSMISSION 1 18000 18000
MISCELLANEOUS PARTS 10000
PAINT 4000
FASTENERS 3000
TOTAL 1,71,679
The above data are in accordance with the market analysis accomplished by our team in Delhi & Aligarh markets before our final selection.
PROJECTED BUDGET
Particulars Budget (INR)
Team registration
15000( before virtuals) + 35,000 ( after selection ) = 50,000
Fabrication of design 1,71,679
Vehicle transport ( to & fro from Aligarh to Indore -693 km ) 30,000
Team transport & accommodation ( 4 days ) 25,000
Marketing & publicity ( team T-shirts , website etc ) 25000
Miscellaneous 15000
TOTAL 3,16,679
PROJECT VALIDATION PLAN