Third SIAP/ESCAP Management Seminar

for the Heads of National Statistical Offices (NSOs) in Asia and the

Pacific

31 January – 02 February 2005,

Bangkok, Thailand

Page 2: Ppt Change Mgt

Theme: Managing Change

What New Things Will NSOs Have To Do or How Will The

Same Things Be Done Differently

Page 3: Ppt Change Mgt

Day 1 (31 January 2005)Time Session Responsibility

09:00-10:15 -Opening

-Overview of the Seminar

- Overview of the Change Management Process, including the conceptual framework for the Seminar

- Break/Photo

Mr.Tomas P.Africa, Director, UNSIAP

Ms. Davaasuren Ch. UNSIAP

Prof.Dr.Aung Tun Thet, UNSSC

Module I – Understanding Change

10:15-12:00 - Presentation- Q/A- Group Work: “Critical Assumptions of the Action Plan and Considerations of Alternative Course of Action”

Prof. Thet

12:00-13:30 Lunch

13:30-15:15 Group Reports/Plenary Discussions/Conclusions/Recommendations

Coffee/Tea Break

Participants/

Resource Persons

Module II – Planning Change

15:15-17:00 - Presentation- Q/A- Group Work: “Securing commitments of partners and stakeholders and identifying coordination mechanisms”

Dennis Trewin, Australian Statistician, ABS

Participants

Page 4: Ppt Change Mgt

Day 2 (01 February 2005)

Time Session Responsibility

Module II – Planning Change (continued)

09:00-10:45 Group Reports/Plenary Discussions/Conclusions/Recommendations

Coffee/Tea Break

Participants/

Resource Persons

Module III – Implementing and Consolidating Change

10:45-12:00 - Presentation- Q/A- Group Work: “Identifying Monitoring Systems, including mechanisms and indicators for work progress”

Mr.Brian Pink,

Government Statistician, New Zealand

Participants

12:00-13:30 Lunch

13:30-15:15 Group Work (continued)

Coffee/Tea Break

Participants/

Resource Persons

15:15-17:00 Group Reports/Plenary Discussions/Conclusions/Recommendations Participants/

Resource Persons

Page 5: Ppt Change Mgt

Day 3 (02 February 2005)Time Session Responsibility

Module IV – National Strategies for the Development of Statistics

09:00-11:00 Presentations- “An Overview of NSDS”- “World Bank Initiatives To Improve Statistics”- “Issues related to the fundamental principles of official statistics that have to be considered in NSDS”- Q/A- Coffee/Tea Break

Ms. Frances Harper,PARIS21

Mr.Fred Vogel, Global Coordinator, ICP, WB

Mr.Heinrich Bruengger, Director, Statistics Division, UNECE

11:00-12:00 Panel Discussion Panellists, Participants

12:00-13:00 Lunch

13:00-14:30 Panel Discussion

Conclusions/Recommendations

Coffee/Tea Break

Panellists, Participants

14:00-15:30 Closing and Seminar Evaluation- Recommendations and conclusions; - Implications for capacity building; - Proposed date, venue, theme for 4th Management Seminar;- Evaluation and Closing Remarks

Participants/

Resource Persons

Page 6: Ppt Change Mgt

Expectations

Page 7: Ppt Change Mgt

CORPORATE LESSONS

So, we will be going through changeHere’s three lessons from large corporations to help you survive change….

Page 8: Ppt Change Mgt

So, the rabbit sat on the ground below the crow, and rested.

CORPORATE LESSON 1A crow was sitting on a tree, doing nothing all day.

A small rabbit saw the crow, and asked him, "Can I also sit like you and do nothing all day long?”The crow answered: "Sure, why not.”

All of a sudden, a fox appeared,

Jumped on the rabbit... and ate it.

Page 9: Ppt Change Mgt

CORPORATE LESSON 1

Moral of the story is….

To be sitting and doing nothingyou must be sitting very, very high up.

Page 10: Ppt Change Mgt

"I would love to be able to get to the top of that tree," sighed the turkey, "but I haven't got the energy.”

CORPORATE LESSON 2A turkey was chatting with a bull.

"Well, why don't you nibble on some of my droppings?" replied the bull. They're packed with nutrients."

The turkey pecked at a lump of dung and found that it actually gave him enough strength to reach the first branch of the tree.

The next day, after eating more dung, he reached the second branch.

Finally after a fortnight, there he was proudly perched at the top of the tree

Soon he was spotted by a farmer

Who promptly shot the turkey out of the tree.

Page 11: Ppt Change Mgt

CORPORATE LESSON 2

Moral of the story:

Bullshit might get you to the top, but it won't keep you there.

Page 12: Ppt Change Mgt

CORPORATE LESSON 3

A little bird was flying south for the winter.

It was so cold, the bird froze and fell to the ground in a large field.

While it was lying there, a cow came by

and dropped some dung on it.

As the frozen bird lay there in the pile of cow dung, it began to realise how warm it was. The dung was actually thawing him out!

He lay there all warm and happy, and soon began to sing for joy.

A passing cat heard the bird singing and came to investigate.

Following the sound, the cat discovered the bird under the pile of cow dung, and promptly dug him out and ate him!

PURR....

Page 13: Ppt Change Mgt

CORPORATE LESSON 3

The morals of this story are:

1) Not everyone who drops shit on you is your enemy.2) Not everyone who gets you out of shit is your friend.3) And when you're in deep shit,keep your mouth shut

Page 14: Ppt Change Mgt

Prof.Dr.Aung Tun Thet,UN System Staff College

Managing Change

“Change is not merely necessary to life. It is life“ Alvin Toffler

Page 15: Ppt Change Mgt

Current situation in the world

• One billion people live on less than $1 a day• Another 2.7 billion survive on less than $2 a day• 6 million children a year die from malnutrition before their fifth

birthday• Every 3.6 seconds, someone dies of starvation• 11 million children die – most under the age of five every year, and

more than 6 million of them from completely preventable causes like, malaria, diarrhoea and pneumonia

• 114 million children do not get even a basic education• More than 2.6 billion people lack basic sanitation• 5 million, mostly children, die every year from water-borne diseases

Page 16: Ppt Change Mgt

MDGs

1. Eradicate extreme poverty and hunger2. Achieve universal primary education3. Promote gender equality and empower women4. Reduce child mortality5. Improve maternal health6. Combat HIV, AIDS, Malaria and other diseases7. Ensure environmental sustainability8. Develop a global partnership for development

Page 17: Ppt Change Mgt

The Millennium Project Report

“First, each country should map the key dimensions and underlying determinants of extreme poverty – by region, locality and gender – as best as possible with available data.”

Country level processes to achieve the Goals, pp.24

Page 18: Ppt Change Mgt

Introduction

• Change is the singly most important element of successful management

• To remain effective, organizations (and individuals in them) have to adopt a positive attitude to change

• Ignoring or trivialising change can be costly

Page 19: Ppt Change Mgt

Change

• No organization is immune to change

• To cope with new external and internal forces, leaders have sought to fundamentally alter the way their organizations work

Page 20: Ppt Change Mgt

The change process involves Eight critical stages

Page 21: Ppt Change Mgt

1. Establish a Sense of Urgency

• Examine external realities

• Identify and discuss crises, potential crises, or major opportunities

Page 22: Ppt Change Mgt

2. Form a Powerful Guiding Coalition

• Assemble a group with enough power to lead the change effort

• Encourage the group to work as a team

Page 23: Ppt Change Mgt

3. Create a Vision

• Create a vision to help direct the change effort

• Develop strategies for achieving that vision

Page 24: Ppt Change Mgt

4. Communicate the Vision

• Use everything possible to communicate the new vision and strategies

• Teach new behaviors by the example of the guiding coalition

Page 25: Ppt Change Mgt

5. Empower Others to Act on the Vision

• Get rid of obstacles to change

• Change systems or structures that seriously undermine the vision

• Encourage risk taking and nontraditional ideas, activities, and actions

Page 26: Ppt Change Mgt

6. Plan for and Create Short-Term Wins

• Plan for visible performance improvements

• Create those improvements • Recognize and reward employees

involved in the improvements

Page 27: Ppt Change Mgt

7. Consolidate Improvements and Produce Still More Change

• Use increased credibility to change systems, structures, and policies that don't fit the vision

• Hire, promote, and develop employees who can implement the vision

• Reinvigorate the process with new projects, themes, and change agents

Page 28: Ppt Change Mgt

8. Institutionalize New Approaches

• Articulate the connections between the new behaviors and organizational success

• Develop the means to ensure leadership development and succession

Page 29: Ppt Change Mgt

• While there is no single source of change, there is a clear pattern to the reasons for failure

• Most often, it is a leader's attempt to shortcut a critical phase of the change process

• Certainly, there is room for flexibility in the eight steps that underlie successful change - but not a lot of room

Page 30: Ppt Change Mgt

Four Mistakes

The source of most failures of change

Page 31: Ppt Change Mgt

1. Writing a memo instead of lighting a fire

• Change efforts fail at the first critical step - establishing a sense of urgency

• Too often leaders launch their initiatives by calling a meeting then expect people to “buy-in”

• It doesn't happen

Page 32: Ppt Change Mgt

2. Talking too much and saying too little

• Most leaders undercommunicate their change vision by a factor of 10

• An effective change vision must include new, aligned behaviors on the part of senior executives

• Leading by example• People watch their

bosses very closely• Inconsistent behavior by

a manager fuel the cynicism and frustration

Page 33: Ppt Change Mgt

3. Declaring victory before the war is over

• It is important to celebrate results but underestimating the difficulty and duration of organizational transformation can be catastrophic

• If you settle for too little too soon, you will probably lose it all

• Celebrating incremental improvements is good to mark progress and sustain commitment - but don't forget how much work is still needed

Page 34: Ppt Change Mgt

4. Looking for villains in all the wrong places

• The perception that large organizations are filled with middle managers who resist all change is not only unfair but untrue

• People at every level are engaged in change processes

• The biggest obstacles to change are not middle managers but, more often, those who work just a level or two below the CEO - vice presidents, directors, general managers, and others who may have the most to lose in a change

• That's why it is crucial to build a guiding coalition that represents all levels of the organization

Page 35: Ppt Change Mgt

• All institutions need effective leadership, but nowhere is the need greater than in the organization seeking to transform itself

Page 37: Ppt Change Mgt

Four Dimensions Of Change

Understanding Change

Implementing

Change

Planning

Change

Consolidating

Change

Page 38: Ppt Change Mgt

Questions To Ask Yourself

Page 39: Ppt Change Mgt

Questions To Ask Yourself

• Have I involved everyone who should be involved?

• Do I and my colleagues really believe that involvement is essential for successful CHANGE?

• Has the case for CHANGE been communicated and understood?

• Have people had the necessary training and preparation?

• Have management layers been kept to a minimum?

Page 40: Ppt Change Mgt

Producing change

• Is 80 percent leadership - establishing direction, aligning, motivating, and inspiring people –

• And 20 percent management - planning, budgeting, organizing, and problem solving

• Unfortunately, in most of the change efforts, these percentages are reversed

Page 41: Ppt Change Mgt

Questions To Ask Yourself

Have I ensured that everybody knows what benefits are expected from the CHANGE?

Does everybody fully understand and accept the case for CHANGE?

Can I answer everybody’s vital question: “What’s in it for me?”

Will the planned CHANGES genuinely make people’s jobs more interesting?

What would I want done for me if my job was at stake?

Page 42: Ppt Change Mgt

Points To Remember

Page 43: Ppt Change Mgt

(1)

• Change should not begin until all key questions are answered

• Involve people in plans• Measurement is the key to realistic planning• People work best if they identify a change with

their self-interest• Long documents, long words, and long

explanations are off-putting• Objectives must be few in number and

unambiguous

Page 44: Ppt Change Mgt

(2)

• The likely consequences of change, inside and outside the organization, need to be considered thoroughly

• All key managers must fully commit themselves to the change philosophy

• Vital needs that must be supplied should be identified and catered for

• There needs to be regular liaison between all departments and functions affected by the CHANGE

• Everyone should understand the importance of treating others as allies, not enemies

• People at all levels are fully capable of understanding the business case for CHANGE

Page 45: Ppt Change Mgt

(3)

• Emotion cannot be countered by reason alone, but requires emotional reassurance

• Once trust is lost, it is very difficult to win back• Criticism is not necessarily mere resistance; it

may be well founded• Once the CHANGE programme is up and

running – and working – resistance will dwindle• In overcoming resistance, prevention is better

than cure

Page 46: Ppt Change Mgt

(4)

• Confronting opposition and opponents is a painful necessary

• If obstructive ringleaders will not reform, they will have to leave

• All senior people should develop the habit of taking and listening to everybody

Page 47: Ppt Change Mgt

(5)

• Self-criticism needs to be allied with self-confidence

• If people whole heartedly support CHANGE, they will become its ardent defenders

• Any set-up should be re-examined and improved periodically

Page 48: Ppt Change Mgt

Do’s and Don’ts

Page 49: Ppt Change Mgt

(1)

Do invite suggestions from everyone

Do hold frequent formal and informal meetings

Do involve teams in planning as well as implementation

Do manage people’s expectations with care

Don’t make offers people cannot refuse

Don’t keep unnecessary secrets or tell any lies

Don’t forget that CHANGES should improve organizational results

Don’t leave anybody out in the cold

Page 50: Ppt Change Mgt

(2)

Do promote comradeship among CHANGE agents

Do give CHANGE agents stretching tasks

Do encourage people to form and follow up ideas for CHANGE

Do listen to what CHANGE agents say about morale and reactions

Don’t assume that older people are too set in their ways to be CHANGE agents

Don’t discourage others by singling out CHANGE agents for special treatment

Don’t prevent CHANGE agents from using their initiative

Don’t create an atmosphere of secrecy

Page 51: Ppt Change Mgt

Additional Issues

Page 52: Ppt Change Mgt

Using Change Agents: Qualities of change agents

RealisticEffective Communication

Attentivelistener

Ideasperson

Goodcollaborator

Restless

Eager forimprovement

Page 53: Ppt Change Mgt

Emotional Reactions to Change

Time

Active

Passive

Em

otio

nal r

espo

nse

Stability at the Point of change

Inability to act Denial

Anger

Bargaining

Depression

Acceptance

Testing

Page 54: Ppt Change Mgt

Dealing With Negative Reactions To Change

Types of Negativity What to Do About Them

RATIONAL • Explain plan with greater clarity and detail

• Involve everybody

• Institute bottom-up programme

PERSONAL • Stress improved job prospects

• Accept managerial responsibility

EMOTIONAL • Show with examples

• Stage a series of meetings

• Demonstrate

• Explain the reasons for change

• Be honest

Page 55: Ppt Change Mgt

Studying All Angles of Change

External

Is the client satisfaction rising? Has the improved quality increased results?

Internal

Is the organization or department meeting schedules and targets? How is staff morale?

Process

Is quality nearing 100 percent? Can schedules be cut? Are innovations emerging?

Result

Is the financial position better?

Page 56: Ppt Change Mgt

Revision of a CHANGE programme

Implement CHANGE programme

Implement CHANGE programme

Measure resultsand obtain feedback

Measure resultsand obtain feedback

If successful,continue programme

If successful,continue programme

If necessary,revise programme

If necessary,revise programme

Page 57: Ppt Change Mgt

Individual Work

• Please write down on coloured cards

1. What NEW things NSOs Have to Do

2. HOW will the SAME things be done differently

• As the result of the requirements of MD/MDGs

Page 58: Ppt Change Mgt

The Truth About Coping With Change

Page 59: Ppt Change Mgt

Most People Resist Any

Change That Doesn’t Jingle

in Their Pockets

Page 60: Ppt Change Mgt

Resistance To Change

• Doesn’t surface in standardized ways

• Can be overt, implicit, immediate, or deferred

• Easiest for management to deal with when it is overt and immediate

• More challenging if it is implicit or deferred

Page 61: Ppt Change Mgt

Resistance To Change

• Organizations and individuals resist change

• In one sense this is positive since it provides a degree of stability and predictability to bahaviour

• Without resistance organizational behaviour will lead to chaotic randomness

Page 62: Ppt Change Mgt

Resistance To Change

• Is a source of functional conflict

• Can stimulate healthy debate

• Hinders adaptation and progress

Page 63: Ppt Change Mgt

Resistance to Change : Individuals

• Sources of resistance – Habit; Security; Economic Factors, Fear of the Unknown

• Habit, i.e., programmed responses helps us cope with complexities of life; when confronted with change this tendency to respond in our accustomed ways becomes a source of resistance

Page 64: Ppt Change Mgt

Resistance to Change: Individuals

• Security – People with a high need for security are likely to resist change because it threatens their sense of insecurity

• Economic Factors – Concern that changes will result in lower income; Fear that they cannot perform new tasks or routines especially when pay is closely tied to productivity

Page 65: Ppt Change Mgt

Resistance to Change: Individuals

• Fear of the unknown – Change substitutes ambiguity and uncertainty for the known; You trade known for the unknown and the fear and insecurity that goes with it

Page 66: Ppt Change Mgt

Resistance to Change: Organizations

• Organizations are conservative – actively resist change change through structural and group inertia and threats to member expertise, power relationships and established resource allocations

Page 67: Ppt Change Mgt

Resistance to Change: Organizations

• Organizations have built-in mechanisms to produce stability – systematically select certain people and certain people out, people are hired into an organization are chosen for for and then shaped and directed to behave in certain ways

• When the organization is confronted with change this structural inertia acts as a counter balance to sustain stability

Page 68: Ppt Change Mgt

Resistance to Change: Organizations

• Even if individuals want to change their behaviour, group norms act as a constraint

• Any redistribution of decision-making as the result of change threatens the long-established power relationships

• Groups in the organization that control sizeable resources often see change as a threat, those that benefit from current al.location of resources feel threatened by changes that may effect future allocations

Page 69: Ppt Change Mgt

What should the manager do?

1. Initiating change is an important part of the manager’s job

2. Expect resistance to change come in a number of forms

3. Prepare to undermine this resistance

Page 70: Ppt Change Mgt

How to undermine resistance

• Provide rewards for accepting change

• Communicating reasons for why change is necessary

• Including people who will be effected by the change to participate in change decisions

Page 71: Ppt Change Mgt

Use Participation To Reduce Resistance to

Change

Page 72: Ppt Change Mgt

Participation

• Having staff participate in decisions that affect them is no panacea

• Has only a modest influence on employee productivity, motivation and job satisfaction

• A potent force for combating resistance to change

Page 73: Ppt Change Mgt

Right conditions for using participation

• Adequate time to participate

• Issues are relevant

• Staff have the ability to participate

• Organizational culture support staff involvement

Page 74: Ppt Change Mgt

With the right conditions

• Participation can reduce resistance, obtain commitment and increase the quality of the change decision

Page 75: Ppt Change Mgt

You Can Teach Old Dog New Tricks

Page 76: Ppt Change Mgt

Age Discrimination

• Western cultures have historically been biased towards youth

• There is still a prejudice against hiring or investing in staff over age 50

• Part of this prejudice reflects the widely-held stereotype that older workers have difficulties with change

• Older staff are perceived as being inflexible, resistant to change and less trainable than their younger counterparts

Page 77: Ppt Change Mgt

These perceptions are wrong

• Older workers want to learn and are just as capable of learning as any other

• They may take longer to train but once trained perform at comparable levels to younger workers

• Age is found not to be related to learning and training outcomes

Page 78: Ppt Change Mgt

These perceptions are wrong

• Older workers are more committed in that they are less likely to quit their jobs that their younger counterparts

• They have lower rates of avoidable absences

• Workers 65 and over record higher job satisfaction scores than their co-workers aged 45-64

Page 79: Ppt Change Mgt

Group Work

Page 80: Ppt Change Mgt

Group Work Arrangement

1. Participants will be divided into four groups according to the attached group list

2. Four rapporteurs (one for each group) will be pre-selected

3. Group rapporteurs will report back to the plenary

Page 81: Ppt Change Mgt

Module I – Understanding Change

Group Work

Day 1 (31 January 2005)10:30-15:00

“Critical Assumptions of the Action Plan and

Considerations of Alternative Course of Actions”

Page 82: Ppt Change Mgt

Objectives

Participants will be able to:

1. Learn how to assess and validate the assumptions

2. Identify an alternative course of actions and key tasks assessing their feasibility

Page 83: Ppt Change Mgt

Expected Outputs

1. A list of assumptions for each tasks of the selected two actions

2. A list of proposed alternative course of actions for the two actions

Page 84: Ppt Change Mgt

Directions

1. Complete a worksheet “Critical assumptions and alternative course of actions”, in relation to the Case Study

2. Develop and propose an alternative course of actions in implementing selected two actions

Page 85: Ppt Change Mgt

Worksheet: Critical Assumptions and Alternative Course of Actions

Actions Key Tasks Outputs/

Outcome

Assumptions Alternative ways to implement the tasks

1. 1.1

1.2

1.3

2. 2.1

2.2

2.3

Page 86: Ppt Change Mgt

Day 1 (31 January 2005)Time Session Responsibility

09:00-10:15 -Opening

-Overview of the Seminar

- Overview of the Change Management Process, including the conceptual framework for the Seminar

- Break/Photo

Mr.Tomas P.Africa, Director, UNSIAP

Ms. Davaasuren Ch. UNSIAP

Prof.Dr.Aung Tun Thet, UNSSC

Module I – Understanding Change

10:15-12:00 - Presentation- Q/A- Group Work: “Critical Assumptions of the Action Plan and Considerations of Alternative Course of Action”

Prof. Thet

12:00-13:30 Lunch

13:30-15:15 Group Reports/Plenary Discussions/Conclusions/Recommendations

Coffee/Tea Break

Participants/

Resource Persons

Module II – Planning Change

15:15-17:00 - Presentation- Q/A- Group Work: “Securing commitments of partners and stakeholders and identifying coordination mechanisms”

Dennis Trewin, Australian Statistician, ABS

Participants

Page 87: Ppt Change Mgt

Module II – Planning Change

Group Work

Day 1 (31 January 2005) 15:30-17:00 Day 2 (01 February 2005) 09:00-10:30“Securing commitments of partners and stakeholders and identifying coordination mechanisms”

Page 88: Ppt Change Mgt

Objectives

Participants will be able to:

1. Learn how to identify What needs to be done, by WHOM, with WHAT RESOURCES, by WHEN and possible COORDINATION MECHANISMS

Page 89: Ppt Change Mgt

Expected Outputs

1. A draft of detailed Action Plan with the following specifications: WHAT needs to be done, with WHAT RESOURCES, by WHEN, and COORDINATION MECHANISMS

Page 90: Ppt Change Mgt

Directions – Each Group

1. Determines major components of the tasks and assign actors involved for the ACTION PLAN

2. Determines required key resources and examines the availability of them – financial, expertise, professional staff, facilities and equipment

3. Discusses the time frame to ensure that the key actors and activities are properly coordinated in time

4. Identifies and highlights in the Worksheet, the tasks for which no clear actor identified, unclear funding sources, capacity limitations of staff, other resource requirements could not be identified

Page 91: Ppt Change Mgt

Worksheet: Resources Availability Assessment

Actions Key Tasks Responsible Partners

Availability of financial resources

(1 … 5)

Low = 1

High = 5

Availability of professional staff/

expertise

(1 … 5)

Low = 1

High = 5

Time to complete the task

1. 1.1

1.2

1.3

2. 2.1

2.2

2.3

Page 92: Ppt Change Mgt

Day 2 (01 February 2005)

Time Session Responsibility

Module II – Planning Change (continued)

09:00-10:45 Group Reports/Plenary Discussions/Conclusions/Recommendations

Coffee/Tea Break

Participants/

Resource Persons

Module III – Implementing and Consolidating Change

10:45-12:00 - Presentation- Q/A- Group Work: “Identifying Monitoring Systems, including mechanisms and indicators for work progress”

Mr.Brian Pink,

Government Statistician, New Zealand

Participants

12:00-13:30 Lunch

13:30-15:15 Group Work (continued)

Coffee/Tea Break

Participants/

Resource Persons

15:15-17:00 Group Reports/Plenary Discussions/Conclusions/Recommendations Participants/

Resource Persons

Page 93: Ppt Change Mgt

“Change is Progress – except when it happens to us”

UN SYSTEM STAFF COLLEGE

Page 94: Ppt Change Mgt

The Principle of Exceptionalism

• While change elsewhere is desirable, we are a special case – immune from powerful improvement

Page 95: Ppt Change Mgt

Results-Based Management

The key is the Results Chain

Page 96: Ppt Change Mgt

RBM

RESULTS

INPUT ACTIVITY OUTPUT OUTCOME IMPACT

• Human• Financial• Technical

• Mgt

Seminar

• Number of participants• Positive

Reaction

• Increase in knowledge and skills

• Enhanced

Performance

efficiency effectiveness

ASSUMPTIONS

Page 97: Ppt Change Mgt

Remember

TELL ME I will forget

SHOW ME I might remember

INVOLVE ME I will never forget

Page 98: Ppt Change Mgt

 Action 1: Develop provincial level poverty indicators  Key tasks Responsible

partnersAvailability of financial resource

Availability of professional staff/expertise

Time to complete task

1.1        income and expenditure household surveys with increased sample size  1.2 tabulation and estimation by province  

11. SCI*2. MPO*3.

MOSW*   

1. SCI

4       4

4       4

  2006-2008 (focus on 2007)      12006-2008 (focus on 2008)

* SCI: Statistical Centre of Iran* MPO: Managing and Planning Organization* MOSW: Ministry of Social Welfare 

Page 99: Ppt Change Mgt

Action 2: Improve data quality 

  Key tasks Responsible partners

Availability of financial resource

Availability of professional staff/expertise

Time to complete task

2.1 review data collection methodologies 

2.2 change of reference periods 

S1. SSCI 2. MPO 3. ISS 

S1. SCI

5  

 5

 5

2006-2008   

2006-2008

Page 100: Ppt Change Mgt

Module III – Implementing and

Consolidating ChangeGroup Work

Day 2 (01 February 2005)11:00-17:00

“Identifying Monitoring Systems, including

mechanisms and indicators of work progress”

Page 101: Ppt Change Mgt

Objectives

Participants will be able to:

1. Learn how to establish good monitoring mechanisms to achieve Action Plan objectives

Page 102: Ppt Change Mgt

Expected Outputs

1. Proposed mechanisms to monitor the ACTION PLAN implementation process

Page 103: Ppt Change Mgt

Directions – Each Group

1. Identifies and proposes measurable indicators for the results

2. Recommends monitoring mechanisms to give an on-going overview of the ACTION PLAN implementation process

3. Discuss what methods you will use to check progress

4. Discuss what methods you will use to measure the success of the ACTION PLAN implementation process

Page 104: Ppt Change Mgt

Day 3 (02 February 2005)Time Session Responsibility

Module IV – National Strategies for the Development of Statistics

09:00-11:00 Presentations- “An Overview of NSDS”- “World Bank Initiatives To Improve Statistics”- “Issues related to the fundamental principles of official statistics that have to be considered in NSDS”- Q/A- Coffee/Tea Break

Ms. Frances Harper,PARIS21

Mr.Fred Vogel, Global Coordinator, ICP, WB

Mr.Heinrich Bruengger, Director, Statistics Division, UNECE

11:00-12:00 Synthesis and Integration: Outputs of the Group Work and Critique-Bhutan-Indonesia

Mr. Tomas Africa, UNSIAP

12:00-13:00 Lunch

13:00-14:30 -(Continued)- Iran- Mongolia

Mr. Tomas Africa, UNSIAP

14:00-15:30 Closing and Seminar Evaluation- Recommendations and conclusions; - Implications for capacity building; - Proposed date, venue, theme for 4th Management Seminar;- Evaluation and Closing Remarks

Mr.Andrew J. Flatt,

UNESCAP

Page 105: Ppt Change Mgt

Being A Change Agent

Page 106: Ppt Change Mgt

“Boiling Frog” phenomenon

Page 107: Ppt Change Mgt

Frog Prince

• You have to kiss many frogs before you find the Frog Prince

Page 108: Ppt Change Mgt

Understanding the Change Process

• We need to be able to work with change at the very micro-level (persuading individuals within organizations to work in new or different ways)

• We also need need to be influencing the agenda at the macro-level – changing public opinions

Page 109: Ppt Change Mgt

Our Roles in the Change Process

Inside Outside

Up-front

Backseat

Page 110: Ppt Change Mgt

As Change Agents

• We need to consider two dimensions

• Our position in relation to the organization

• Our association with the change – either proactive or reactive role

Page 111: Ppt Change Mgt

Matrix of Strategic RolesInside Outside

Up-front Champion

Within the organisationSeen as a leader

Closely associated with change

and moving things forward

Activist

Likely to remain an outsiderFierce in supporting or

opposing changeHas strong views and

expresses them

Back-seat

Tempered Radical

Working within the organisation

Commitment to organisationWork with powers-that-be

Still passionate and committed

Messenger

On the outsideMay bring good or bad news

A Trojan horse?Not closely associated with

change –always at one step removed

Page 112: Ppt Change Mgt

Question

• How might you use the four strategic change agent roles in relation to NSOs