What is budgeting?
Basically, it's making sure that you're spending less than
you're bringing in and planning for both the short- and long-
term.
Provide a forecast of revenues and expenditures, that is,
construct a model of how a business might perform
financially if certain strategies, events and plans are carried
out.
Enable the actual financial operation of the business to be
measured against the forecast.
Establish the cost constraint for a project, program,
or operation.
-
7/28/2019 PPT:- Budgeting & Cost Control
3/17
WHAT IS A BUDGET?
A budget is one of the most basic and probably most useful things you can do to
get in control of your finances. It is simply a snapshot of your financial situation
at a particular point in time, which can help you keep track of what you're
earning, what you're spending, and what happens to the leftovers (if there are
any). You can then use your budget to set some guidelines for yourself when it
comes to how you spend what you earn.
A budget is the most fundamental and most effective financial management tool
available to anyone. It is extremely important to know how much money you
have to spend and where you are spending it. Some of your "spending" might be
for investments, but there is an important distinction between creating a
personal budget and deciding where to invest your extra income. A budget is the
first and most important step towards maximizing the power of your money.
-
7/28/2019 PPT:- Budgeting & Cost Control
4/17
WHAT IS BUDGETARY CONTROL?
Budgetary control is the use of the comprehensive system ofbudgeting to aid management in carrying out its functionslike planning, coordination and control. This system involves:Division of organization on functional basis into different
sections known as a budget centre. Preparation of separate budgets for each budget centre.
Consolidation of all functional budgets to present overallorganizational objectives during the forthcoming budgetperiod.
Comparison of actual level of performance against budgets.
Reporting the variances with proper analysis to providebasis for future course of action.
-
7/28/2019 PPT:- Budgeting & Cost Control
5/17
-
7/28/2019 PPT:- Budgeting & Cost Control
6/17
According to Function
SALES BUDGET: Sales budget is the most important budget based on which all the other budgets are builtup. This budget is a forecast of quantities and values of sales to be achieved in a budget period.
PRODUCTION BUDGET: Production budget involves planning the level of production which in turn involvesthe answer to the following questions:
What is to be produced?
When is it to be produced?
How is it to be produced?
Where is it to be produced?
COST OF PRODUCTION BUDGET: This budget is an estimate of cost of output planned for a budget periodand may be classified into Material Cost Budget, Labor Cost Budget, Overhead Cost Budget.
PURCHASE BUDGET: This budget provides information about the materials to be acquired from the marketduring the budget period.
PERSONNEL BUDGET: This budget gives an estimate of the requirements of direct labor essential to meetthe production target. This budget may be classified into
a. Labor requirement budget
b. Labor recruitment budget
RESEARCH AND DEVELOPMENT BUDGET: This budget provides an estimate of expenditure to be incurredon R & D during the budget period.
R&D budget is prepared taking into consideration the research projects in hand and new R & D projects to
be taken up.
-
7/28/2019 PPT:- Budgeting & Cost Control
7/17
CAPITAL EXPENDITURE BUDGET: This is an important budget providing for
acquisition of assets necessitated by the following factors:
a. Replacement of existing assets.
b. Purchase of additional assets to meet increased productionc. Installation of improved type of machinery to reduce costs.
CASH BUDGET: This budget gives an estimate of the anticipated receipts and
payments of cash during the budget period. Cash budget makes the provision
for minimum cash balance to be maintained at all times.
MASTER BUDGET: CIMA defines this budget as The summary budget
incorporating its component functional budget and which is finally approved,
adopted and employed. Thus master budget is a summary of all functional
budgets in capsule form available in one report.
-
7/28/2019 PPT:- Budgeting & Cost Control
8/17
According to FLEXIBILITY
FIXED BUDGET: This is defined as a budget which is designed toremain unchanged irrespective of the volume of output or turnover
attained. This budget will, therefore, be useful only when the actual level
of activity corresponds to the budgeted level of activity.
FLEXIBLE BUDGET: CIMA defines this budget as one which, byrecognizing the difference in behavior between fixed and variable costs in
relation to fluctuations in output, turnover or other variable factors suchas number of employees, is designed to change appropriately with such
fluctuations.
-
7/28/2019 PPT:- Budgeting & Cost Control
9/17
Preparation of budgets is the first step in the budgetary control
system. Implementation of budgets is the second phase. But
preparation and implementation of budgets alone will not
achieve much unless a comparison is made regularly between
the actual performance and the budgeted performance.
Continuous and proper reporting makes this possible. To
ensure the success of budgetary control system, proper follow
up action has to be taken immediately for the reportssubmitted.
-
7/28/2019 PPT:- Budgeting & Cost Control
10/17
CAPITAL BUDGETING
Capital budgeting is a decision situation where large funds are committed (invested) inthe initial stages of the project and the returns are expected over a long period of
time. These decisions are related to allocation of investible funds to different long-
term assets. Capital budgeting is a continuous process and it is carried out by different
functional areas of management such as production, marketing, engineering, financial
management etc.
BASIC FEATURES OF CAPITAL BUDGETING:
a. Capital budgeting decisions have long-term implications.
b. These decisions involve substantial commitment of funds.
c. These decisions are irreversible and require analysis of minute details.
d. These decisions determine and affect the future growth of the firm.
CAPITAL BUDGETING DECISION INVOLVES THREE STEPS
i. Estimation of costs and benefits of a proposal or of each alternative.
ii. Estimation of the required rate of return, i.e., the cost of capital
iii. Selection and applying the decision criterion.
-
7/28/2019 PPT:- Budgeting & Cost Control
11/17
The costs and benefits for a capital budgeting decision
situation are measured in terms of cash flows. An important
point is that all cash flows are considered on after tax basis.The rule is that all financial decisions are subservient to tax
laws. The cash flow from the project is compared with the
cost of acquiring the project.
-
7/28/2019 PPT:- Budgeting & Cost Control
12/17
Cost Control
The process or activity on controlling costs associated with anactivity, process, or company.
Cost control typically includes
(1) investigative procedures to detect variance of actualcost from budgeted cost,
(2) diagnostic procedures to ascertain the cause(s) of variance,
and
(3) corrective procedures to effect realignment between actualand budgeted costs.
-
7/28/2019 PPT:- Budgeting & Cost Control
13/17
Four Requirements for Effective Cost Control
Many businesses use cost control strategies to keep expenses downand increase profits. Cost control is used to curb costs associatedwith many areas of business, including processes and projects. Costcontrol is an important goal, but if the necessary aspects are notimplemented correctly, a business may lose money instead.
Expectations and Frequent Review
Before a project is started, all involved must have a clear and specific
definition of the project's needs, goals and requirements. These needs,goals and requirements must be reviewed frequently to make sure theproject is going in the right direction. Failure to get all the necessary
information about a project can seriously impact cost control efforts.
-
7/28/2019 PPT:- Budgeting & Cost Control
14/17
Budgeting
Creating a realistic, thorough budget helps keep costs down. With a budget
in place once the project's details are set, everyone involved in the project
can make decisions about items that add to the cost, such as materials and
labor.
-
7/28/2019 PPT:- Budgeting & Cost Control
15/17
Variable Evaluation and Action
Any unexpected variables in a budget where actual cost is exceedingthe estimated cost by a significant percentage must be addressedimmediately for cost control. Those working on the project must worktogether to come up with a solution that will stop the expense fromspiraling out of control. Other variables from the project itself, such asan unexpected design flaw, must be handled the same way. If all thoseinvolved collaborate to find creative solutions to unexpected problems,they can keep costs down.
-
7/28/2019 PPT:- Budgeting & Cost Control
16/17
Proper Information Use andCommunicationThose involved in a project must use all the information available,
including the project details and project budget, and coordinate effortsto keep costs down. Use of other cost-control strategies, such asbudgeting, won't work well without information sharing and opencommunication among all those involved on the project. For example,if a business and project manager decide to eliminate part of a newbuilding design to save money, the architect must adjust for thechange and give the new plans to the construction crew. Otherwise,the crew will proceed with the original, more costly design.
-
7/28/2019 PPT:- Budgeting & Cost Control
17/17
Conclusion Without proper planning of cost management,
deliverables may happen, but chances of over shootingthe budget always remain.
It is very critical that we nee to keep a strict vigil on
various process involved in estimation, budgeting and
control in a project so as to ensure its completion withinthe allotted time frames and budget.