PPPs in Healthcare (SDG-3) and Education(SDG-4) sectors

Regional Event on Financing Sustainable InfrastructureDevelopment in Asia and the Pacific

Organized by the United Nations ESCAP

6-7 December, 2017

Page 2

PPPs in Healthcare sector (Contributing to SDG-3)

Page 3

Agenda

Goal and objectives1

Key challenges in the sector

Prevalent PPP models3

Examples and learnings4

2

Key recommendations5

Page 4

SDG-3 goal is to ensure healthy lives and promotewell-being for all at all

Goal: To ensure healthy lives and promote well-being for all at all ages

Achieve universal health coverage, including financial risk protection

Goa

ltar

gets

rela

ted

toP

PP

proj

ects

Access to quality essential health-care services

Access to safe, effective, quality and affordable essential medicines and vaccines

Substantially increase health financing in developing countries

Increase the recruitment, development, training and retention of the health workforce

Page 5

PPPs can help tackle numerous challenges faced bypublic healthcare systems across Asia-Pacific region

Key benefits of PPP

Whole of life benefits: Development andmaintenance of new infrastructure (includingequipment)over the concession term

Accountability: Monitoring of privateperformance based on availability of

medical services and buildings

Scalability: Takeover of existinginfrastructure (district hospitals) andintroduction of private sector managementtechniques

Affordability: Availing certain services forfree or nominal charge by low income group

Capacity building: Training of health careproviders (doctors, nurses, lab assistants,etc.)

Key Challenges

Lack of latest equipment andtechnology in many public healthcareinstitutions

Ineffective management of existinginfrastructure

Inadequate number and quality ofhealthcare professionals

Private healthcare systems are notaccessible and affordable to all

Affordability and willingness to pay byusers make the sector not as lucrativeas other sectors like transportation

Page 6

Most types of PPPs that can be seen in the health

Category Private sector responsibility Public sector responsibility

Non-medicalservices

Provides nonclinical services (admissions,security, parking, laundry, canteen, etc.)May also be responsible for new capitalinvestment, depending on contract

Pays private operator forservices provided, and monitorsand regulates services andcontract compliance

Medical servicesProvides clinical servicesMay also be responsible for new capitalinvestment, depending on contract

Infrastructure(hospitals)

Designs, builds, finances and maintainsnew public hospital (also work withrenovation and extension)

Operates hospital and makesphased payments to the privatedeveloper according to thecontract terms and conditions

CombinedFacilities andServices

Finances, constructs, and operates newpublic hospital and provides nonclinical orclinical services, or both

Reimburses operator for capitaland recurrent costs for servicesprovidedProvides relevant publicpremises (e.g. land, building)

Page 7

Dialysis Center,Bangladesh

Hospital SupportServices (HSS),

Malaysia

Comprehensive support services in all the existing government hospitals(148) Facility Engineering Management; Biomedical EngineeringMaintenance; Cleansing; Linen and Laundry; and Clinical Waste Management15 year concession agreement with 3 private playersGovernment had to pay for the services; Fees were determined based on thenumber of assets/hospitalsDeficiencies in institutional arrangements Inadequate supervision /monitoring of services by the governmentNew KPIs introduced Contract renegotiation was challenging task

Install and operate 110 dialysis centres within existing hospitals in Dhakaand ChittagongPrivate sector scope: Design, refurbish, procure and install equipment, andfinance and maintain operations for a period of 10 yearsProvision of provides all staff other than nephrologists under scopeTwo set of tariffs: A highly subsidized rate for poor people and a higher feefor private patientsBidding parameter Least tariff for private patients; As a result of competitivebidding, the cost per patients was less than half of that in private hospitals

Page 8

AarogyasriCommunity

Health InsuranceScheme, India

Health Campus,Turkey

Government launched its PPP health program in 2010; Development of 1550-bed integrated health campus in Adana, which comprises of 6 hospitals waspart of the program25 year concession contract to finance, build, maintain and manage thefacilities and provide medical support servicesGovernment is responsible for core medical servicesTwo tier payment structure to use the developedfacilities + for services provided

State government pays fixed insurance premium per household per annumto the insurance companyCashless transaction for covered person; Helpdesks to facilitate; Entiresystem of claim reimbursements is enabled through robust IT system andvalid ID card systemClearly defined roles and responsibilities of each stakeholder Government,Insurer and network providersDisadvantages scheme skewed towards tertiary treatment, underutilization ofpublic healthcare system, and financial burden on government

Page 9

EmergencyAmbulance

Services in TamilNadu, India

Telemedicineinitiative in

Karnataka, India

-medicine and Tele- -line health-care initiative in Karnataka, India.The project connects through telecommunication systems Coronary CareUnits Hrudayalayahospital in BangaloreThis provides access to specialists in underserved or unserved areas

To reduce the MMR in rural areas of Tamil Nadu, the government selectedSeva Nilayam (NGO partner) for implementation of the Emergency AmbulanceServices scheme in Theni district of Tamil NaduThe Government supports the scheme by supplying the vehicles while theNGO recruits the staff, operates the programme and maintains the vehiclesThis scheme was envisaged to be self-supporting through the collection ofuser charges, however revenues have been lower than anticipated

Page 10

Key recommendations

Better integration ofhealth sector into mainPPP framework

To establish andstrengthen regulatoryregime governinghealth infrastructure

To create enablingenvironment for universalhealth coverage

To distinguish betweensocial and economicsectorsTo strengthen the existingPPP framework or bring inhealth sector specific PPPpolicy or legislationTo detail out the deliverymodels that can be adoptedTo create awarenessamong government officialsToconfidence in undertakingthese projects

To create a robust systemthat would governdevelopment and operationof healthcare infrastructureTo ensure minimumstandards technical andoperations are maintainedthroughout the contractTo ensure accreditationsystem / mechanism forservices

To create enablingenvironment for maturity ofinsurance marketTo bring clarity on servicesrates and charges fordefined servicesPolicy on universal healthcoverage should becarefully drafted

Page 11

PPPs in Education sector (Contributing to SDG-4)

Page 12

Agenda

Goal and objectives1

Key challenges in the sector

Prevalent PPP models3

Examples and learnings4

2

Key recommendations5

Page 13

SDG-4 goal is to ensure inclusive and qualityeducation for all and promote lifelong

Goal: To ensure inclusive and quality education for all and promotelifelong learning

Provide free, equitable and quality primary and secondary education to all children

Goa

ltar

gets

rela

ted

toP

PP

proj

ects

Ensure inclusive and quality education for all and promote lifelong learning

Substantially increase the supply of qualified teachers, including through internationalcooperation for teacher training in developing countries

Substantially increase education sector in developing countries

Page 14

Key challenges faced by public education systems acrossAsia-Pacific region

Inadequate infrastructure facilities (huge demand supply gap in schools, colleges,vocational institutions)

Poor quality of infrastructure Lack of facilities such as toilets, playgrounds, labsetc.

Poor quality of staff, and outdated curriculum

Low enrolment rates, and high dropout rates (particularly among girl child)

Private schooling is costly and unaffordable to many

PPP projects in education include a focus on providing quality educational facilitiesand services without relying on user fees as the main source of revenue

Page 15

Most types of PPPs that can be seen in the

Category Features Expected benefits

InfrastructureProvision

Private sector is responsible for financing,construction and, operation andmanagement of the school facilities (usuallyin bundles or clusters)Government generally invests in form ofland and pays for the entire cost distributedover contract period (typically 20-30 years)in terms of capacity and performancepayments

Reduced or deferred financialburden on the governmentCreation of quality infrastructure intimely mannerTransfer of risks related design,finance, construction and O&M tothe private sectorBetter operation and managementof schools (improved lifecycle cost)

PrivateManagementof PublicSchools

Private sector is contracted to managepublic schools and/or provide capacitybuilding support, such as curriculum andpedagogical support

Innovation in curriculumdevelopmentBetter staff management (qualityteachers)Increase in students learningoutcomesIncreased skill sets andcompetencies of teachers

Page 16

Most types of PPPs that can be seen in the

Category Features Expected benefits

VoucherSystem

Private school provides free education tothose students having a voucherGovernment directly pays voucher to theparents or the schoolStudents may chose the school of theirchoice

Reduced investment on creation ofnew school infrastructure andfacilitiesReduction in O&M costs of existingschoolsHigh quality education for poorstudents

CharterSchools

Private sector operates and manages aschool that is publicly funded

Improved school outcomes throughgreater autonomy in themanagement

Page 17

BLT Projects forEducationalFacilities,

Republic of Korea

SchoolInfrastructure

Project / Phase I,The Philippines

DepED) launched the PPP SchoolInfrastructure Project (PSIP) Phase-I in 20129,303 classrooms in about 2,300 elementary and secondary schools located inthree regions three packages (A, B & C) to ensure economies of scaleBuild-Lease-Transfer (BLT) contractual arrangement was adopted - Quarterlylease payments during a 10-year lease periodFlexibility in design construct technology within MinimumPerformance Standards and Specifications (MPSS)As of 2015, 100% of the classrooms were completed and delivered

The government introduced BTL projects for educational facilities in 2005Less than 3 years after this introduction, already 137 BTL projects forelementary, middle, and high school facilities were ongoing, with an aggregateinvestment of around $ 4.7 billion (W5.31 trillion)Positive outcomes from initial projects i) actual costs for these projects didnot exceed the project estimated costs and ii) the construction period wasshorter by 8.45% compared to the initial forecastThe satisfaction level was higher for users and school administration

Page 18

Quality SupportModel with

Government ofHaryana andPunjab, India

Trust SchoolModel, Malaysia

In 2010, the Ministry of Education launched the Trust School Programmetogether with Yayasan AMIR, which is a not-for-profit organization establishedto improve accessibility of quality education in Malaysian Government schoolsBy providing technical and financial assistance over a 5-year programme,Yayasan AMIR aims to improve the curriculum and delivery of education aswell as the management of schoolsThe programme started with 10 pilot schools but there were already 62 trustschools in nine states as of 2016. The objective is to raise this number to 700by 2025.

The Quality Support Model is an initiative by the Bharti Foundation in Indiathat intends to strengthen and improve quality of education in GovernmentSchools.Government continues to own the school with its existing teachers, fundsand resourcesBharti Foundation offers technical expertise and guidance - Improvement inacademic and non-academic processes, Infrastructure development /enhanced utilization of existing infrastructure / resources, Capacitydevelopment of school leadership and teachers

Page 19

Voucher System

Voucher like system In India, the Right to Education Act, 2009, mandates thereservation of 25% of the seats in the private school from economicallyweaker section (EWS) of the society for whom the government wouldreimburse the private schools on per student basis.The was enacted and launched in 1990and is considered first modern private school choice programValue of voucher is critical Voucher value in Milwaukee,USA was approximately USD 7,384 which was just more than half thegovernment spending on per student in public schools.Increasing voucher value can result in more participation from the privateschools.Another important aspect is to evaluate the performance of a student preand post admission in a private school.

Page 20

Key recommendations

Robust selection process andobjective selection Criteria

(To clarify the requirements, expectedservices and outcomes in the biddingdocuments; Selection criteria should beobjective)

Well-defined contract terms andprovisions

(PPP contract should clearly spell out thelevel of autonomy for the private partner interms of pedagogy, staffing and budgeting;financial terms in a transparent manner)

Strong monitoring and evaluationframework

(PPP contract should outline clear,measurable and attainable performancestandards with associated penalties)

Remuneration linked toperformance

(Fixed and variable payments - Thefixed component ensures thatunderperforming schools are notimmediately cut off and have sufficienttime to turnaround performance)

Fiscal sustainability

(The financial viability of PPP projects in education depends mainly on well-defined regularpayments capacity and service payments - from public authorities)

Page 21