St.PETER’S COLLEGE OF ENGINEERING AND TECHNOLOGY COLLEGE ROAD, AVADI, CHENNAI – 600 054
DEPARTMENT OF MECHANICAL ENGINEERINGLESSON PLAN 2013– 2014
Subject Code: ME2036 Degree / Branch: B.E / MechanicalSubject: Production Planning and Control Year / Semester: IV / VIII
Unit S.NO. DescriptionRequired
Hours
Text book/ other Ref.
bookPage No.
1.
INTRODUCTION
1. Objectives and benefits of planning and control 1 T1 1.1-1.22. Functions of production control 1 T1 1.2-1.63. Types of production, job- batch and continuous 1 T1 1.7-1.104. Product development and design 1 T1 1.11-1.17
5.Marketing aspect, Functional aspects,
Operational aspect1 T1 1.17-1.18
6.Durability and dependability aspect-aesthetic
aspect1 T1 1.19-1.20
7. Profit consideration 1 T1 1.218. Standardization, Simplification & specialization 1 T1 1.22-1.25
9.Break even analysis-Economics of a new
design.1 T1 1.26-1.44
2.
WORK STUDY
1. Introduction, Method study 1 T1 2.12. Basic procedure, Selection of Process 1 T1 2.2-2.73. Recording of process, Critical analysis 1 T1 2.8-2.214. Development - Implementation 1 T15. Micro motion and memo motion study 1 T1 2.22-2.23
6.Work measurement - Techniques of work
measurement1 T1 2.24-2.28
7. Time study - Production study 1 T1 2.298. Work sampling 1 T1 2.30-2.31
9.Synthesis from standard data
Predetermined motion time standards.1 T1 2.32-2.36
3. PRODUCT PLANNING AND PROCESS
PLANNING
1. Product planning 1 T1 3.1-3.22. Extending the original product information 1 T1 3.12
3.Value analysis-Problems in lack of product
planning1 T1 3.12-3.22
4. Process planning and routing 1 T1 3.23-3.24
5.Pre requisite information needed for process
planning1 T1 3.25-3.26
6. Steps in process planning 1 T1 3.27-3.29
7. Quantity determination in batch production 1 T1 3.44-3.458. Machine capacity, balancing 1 T1 3.45-3.66
9. Analysis of process capabilities in a multi-product system 1 T1 3.66-3.72
4.
PRODUCTION SCHEDULING
1.Production Control Systems-Loading and
scheduling1 T1 4.1-4.14
2. Master Scheduling-Scheduling rules 1 T14.14-4.17, 4.21-4.34
3.Gantt charts-Perpetual loading, Basic scheduling
problems1 T1 4.17-4.21
4. Line of balance, Flow production scheduling 1 T1 4.38-4.46
5.Batch production scheduling-Product
sequencing1 T1 4.46-4.60
6.Production Control systems, Periodic batch
control1 T1 4.7-4.10
7.Material requirement planning, Kanban
1 T15.36-5.39, 4.61-4.69
8.Dispatching-Progress reporting and expediting-
Manufacturing lead time1 T1 4.69-4.87
9.Techniques for aligning completion times and due dates. 1 T1 4.87-4.89
5.
INVENTORY CONTROL AND RECENT TRENDS IN PPC
1.Inventory control-Purpose of holding stock-
Effect of demand on inventories1 T1 5.1-5.4
2. Ordering procedures 1 T1 5.22-5.243. Two bin system, Ordering cycle system 1 T1 5.4-5.6
4.Determination of Economic order quantity and
economic lot size2 T1 5.6-5.22
5. ABC analysis-Recorder procedure 1 T1 5.24-5.27
6.Introduction to computer integrated production
planning systems1 T1 5.27-5.31
7. Elements of JUST IN TIME SYSTEMS 1 T1 5.31-5.358. Fundamentals of MRP II and ERP. 1 T1 5.35-5.46
TOTAL: 45 PERIODS
TEXT BOOK: 1. Dr.R.Kesavan, “Production Planning and Control”, Anuradha Publications.