PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer...

40
PPC Industry Forum 2 December 2010

Transcript of PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer...

Page 1: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

PPC Industry Forum2 December 2010

Page 2: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Disclaimer•BT has taken reasonable care to check that the information contained in the following slides was accurate at time of publication.

•Any price indications or timescales contained within this presentation are estimates for information purposes only and do not constitute any contractual or other obligation.

•In relation to any products/services referred to in this presentation which are currently under development and/or trial, BT gives no undertaking or other commitment that the product/service will be made commercially available

•BT reserves the right to make changes to the information in this presentation at any time without further notice

•Exclusive reliance on the information in this slide pack is at your own risk

Partial Private Circuits

Page 3: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Agenda•Introductions – All•Review of previous actions – Pauline Cowie •Product Development Update – Pauline Cowie•21C Update - Martin Wade•Product In Life Update – Jeneva Hibbert

•QoS Reports•Communications/Notifications•BCMR / 2010 Contract Review Update

•AOB – All•Forum Review - Pauline Cowie•Date of next meeting - All

Partial Private Circuits

Page 4: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Industry Forum

Introductions

Page 5: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

Review of Previous Actions(in conjunction with Action List)

Page 6: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

Action Point 04/12 (04/12/08)

RFT T2R Initiatives Presentation: Validation Rules

CPs to feedback on draft rules.

Page 7: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 01/03 (05/03/09)

Exchanges taken off the Closure List

BT to provide update on funding of equipment installed in an exchange badged for closure, that is subsequently postponed

Partial Private Circuits

Page 8: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 05/06 (04/06/09)

Provisioning Stats – Working Day Measures

BT to provide further information regarding the WCR enhancement to show PPC stats in working days instead of calendar days

Partial Private Circuits

Page 9: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 04/09 (17/09/09)

B End Shift Price

BT to socialise proposed B-End shift prices

Partial Private Circuits

Page 10: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 01/12 (03/12/09)

Efficient Use of Point of Handover (PoH) Equipment

BT to investigate and feedback whether post towns can be added to the SNEiD dropdown menu on the Pricing Tool

Partial Private Circuits

Page 11: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 04/12 (03/12/09)

Wholesale Customer Reporting (WCR) – Shortfall between WCR &

Netview Plus

Global Crossing to confirm measures can be accessed from external WCR

Partial Private Circuits

Page 12: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 07/12 (03/12/09)

RPC to PPC Conversion

SoR 11249

Partial Private Circuits

Page 13: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 03/03 (04/03/10)

Highband FOC Trial

Partial Private Circuits

Page 14: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 02/06 (17/06/10)

Duplication of Excess Construction Charges (ECCs)

BT to arrange tri-party discussion meeting re possible duplication of ECCs

Partial Private Circuits

Page 15: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 03/06 (17/06/10)

Early Life Failure (ELF)

BT to detail process used for orders

provided in incorrect location

Partial Private Circuits

Page 16: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 04/06 (17/06/10)

Point of Handover (PoH) Failure

CPs require more efficient way in which to

report high order failure.

Partial Private Circuits

Page 17: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 01/09 (16/09/10)

21CN Updates

CPs were asked to feedback topics for

updates

Partial Private Circuits

Page 18: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 02/09 (16/09/10)

155Mbit/s CELA (City and East London Area)

Partial Private Circuits

Page 19: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 03/09 (16/09/10)

eCO Repair as principle fault reporting tool

Partial Private Circuits

Page 20: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Action Point 04/09 (16/09/10)

Communications/Notifications

Requirement for RSS feed to notify changes to PPC website.

Partial Private Circuits

Page 21: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

21CN Update

Martin Wade

BT Innovate & Design

Page 22: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

21C VC4 FOA – Dec 2010 Update

• BT to deliver trial network, OSS and DCN updates and configure initial connectivity

-All three FOA sites installed, commissioned and in Comms (Edinburgh Capital, Edinburgh Donaldson and Inverness)

-The power issue at E/Cap has been resolved by requesting and receiving a ‘ concession’ from the power policy authority to use a temporary power feed, with a longer term permanent solution expected in 12 weeks.

-Stability testing has started but a number of installation issues have been identified that need rectifying before test results can be captured (issues with synchronisation configuration, and management)

-Stability and performance testing cannot be completed until these issues are rectified

• BT to share results with industry

- Date tbc - awaiting conformation of revised plan from FOA manager

Page 23: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

Product Development Update

Page 24: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

PPC Development – Road Map

Q3/ 11/12Q1 11/12 Q2 11/12 Q1 12/13Q3 10/11 Q4 10/11 Q4/ 11/12

BCMR Nodal Aggregation Phase 3

Adjustment Notification

B End Shift Charge

PPC Price Control RPI - X

PPC T2R Driving up use of eCO Repair

Highband FOC Improvement Trial

2010 - PPC Contract Review

RPC to PPC Conversion - SoR 11249

Page 25: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

Product In-Life Update

•QoS Reports

•Communications & Notifications

•2Mbit/s Bearer Audit

Page 26: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

QoS Reports

Page 27: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Provision StatsFamily    

201002 (31May10)

201003 (30Jun10)

201004 (31Jul10)

201005 (31Aug10)

201006 (30Sep10)

201007 (31Oct10)

201008 (30Nov10)

PARTIAL PRIVATE CIRCUITS

 

% Success 99.2 99.64 99.38 99.85 98.47 98.5 99.8

Successes 623 552 644 657 645 720 976

Volume 628 554 648 658 655 731 978

% Failure 0.8 0.36 0.62 0.15 1.53 1.5 0.2

Failures 5 2 4 1 10 11 2

Late 0 0 0 0 0 0 0

Highband Products & Services

% Success 100 100 100 100 100 100 100

Successes 6 11 5 7 10 16 13

Volume 6 11 5 7 10 16 13

% Failure              

Failures              

Late 0 0 0 0 0 0 0

Narrowband Products & Services

% Success 100 96.3 95.45 100 90.48 91.18 100

Successes 33 26 21 13 19 31 40

Volume 33 27 22 13 21 34 40

% Failure   3.7 4.55   9.52 8.82  

Failures   1 1   2 3  

Late 0 0 0 0 0 0 0Wideband Products & Services

% Success 99.15 99.81 99.52 99.84 98.72 98.83 99.78

Successes 584 515 618 637 616 673 923

Volume 589 516 621 638 624 681 925

% Failure 0.85 0.19 0.48 0.16 1.28 1.17 0.22

Failures 5 1 3 1 8 8 2

Late 0 0 0 0 0 0 0

Page 28: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Provision– Early Life Failures (ELF)

Family    201002

(31May10)201003

(30Jun10)201004

(31Jul10)201005

(31Aug10)201006

(30Sep10)201007

(31Oct10)201008

(30Nov10)

PARTIAL PRIVATE CIRCUITS

 

% Success 99.2 99.64 99.38 99.85 98.47 98.5 99.8

Volume 628 554 648 658 655 731 978

OTD ELFs 5 2 4 1 10 11 2

Late With ELFs 0 0 0 0 0 0 0

Late Without ELFs

0 0 0 0 0 0 0

Highband Products &

Services

% Success 100 100 100 100 100 100 100Volume 6 11 5 7 10 16 13

OTD ELFs 0 0 0 0 0 0 0

Late With ELFs0 0 0 0 0 0 0

Late Without ELFs

0 0 0 0 0 0 0

Narrowband Products &

Services

% Success 100 96.3 95.45 100 90.48 91.18 100Volume 33 27 22 13 21 34 40

OTD ELFs   1 1   2 3  

Late With ELFs  0 0   0 0  

Late Without ELFs

0 0 0 0 0 0 0

Wideband Products &

Services

% Success 99.15 99.81 99.52 99.84 98.72 98.83 99.78Volume 589 516 621 638 624 681 925

OTD ELFs 5 1 3 1 8 8 2

Late With ELFs0 0 0 0 0 0 0

Late Without ELFs

0 0 0 0 0 0 0               

Page 29: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Provision to Customer Required by Date (CRD)

Family    201002

(31May10)201003

(30Jun10)201004

(31Jul10)201005

(31Aug10)201006

(30Sep10)201007

(31Oct10)201008

(30Nov10)

PARTIAL PRIVATE CIRCUITS

 

% Success 56.12 52.89 57.85 54.4 45.63 51.53 62.05

Failures 276 261 274 295 336 333 351

Volume 629 554 650 647 618 687 925

Highband Products &

Services

% Success 16.67 36.36 33.33 71.43 30 18.75 38.46

Failures 5 7 4 2 7 13 8

Volume 6 11 6 7 10 16 13

Narrowband Products &

Services

% Success 72.73 55.56 13.33 33.33 30 33.33 46.15

Failures 9 12 13 4 7 8 7

Volume 33 27 15 6 10 12 13

Wideband Products &

Services

% Success 55.59 53.1 59.14 54.42 46.15 52.66 62.63

Failures 262 242 257 289 322 312 336

Volume 590 516 629 634 598 659 899

Page 30: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Provision – Mean Time to Provide

Family    201002

(31May10)201003

(30Jun10)201004

(31Jul10)201005

(31Aug10)201006

(30Sep10)201007

(31Oct10)201008

(30Nov10)

PARTIAL PRIVATE CIRCUITS

 

Average Days (Calendar) 52.09 65.29 49.69 46.18 61.83 56.98 49.27

Total Days(Calendar) 32,711 36,170 32,200 30,389 40,500 41,654 48,190

Volume 628 554 648 658 655 731 978

Highband Products & Services

Average Days (Calendar) 109.67 103.91 92.6 94.71 101.6 94.56 94.69

Total Days(Calendar) 658 1,143 463 663 1,016 1,513 1,231

Volume 6 11 5 7 10 16 13

Narrowband Products & Services

Average Days (Calendar) 40.45 40.22 44.64 50.92 72.38 49.18 43

Total Days(Calendar) 1,335 1,086 982 662 1,520 1,672 1,720

Volume 33 27 22 13 21 34 40

Wideband Products & Services

Average Days (Calendar) 52.15 65.78 49.52 45.55 60.84 56.49 48.91

Total Days(Calendar) 30,718 33,941 30,755 29,064 37,964 38,469 45,239

Volume 589 516 621 638 624 681 925

Page 31: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Provision Stats - Chart

Page 32: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Repair Stats     

201002 (31May10)

201003 (30Jun10)

201004 (31Jul10)

201005 (31Aug10)

201006 (30Sep10)

201007 (31Oct10)

201008 (30Nov10)

PARTIAL PRIVATE CIRCUITS

 

% Success 87.59 82.93 86.8 86.03 85.3 82.81 85.2

Successes 2,039 2,453 2,434 2,081 2,089 2,370 2,193

Volume 2,328 2,958 2,804 2,419 2,449 2,862 2,574

Failures 289 505 370 338 360 492 381

Late 123 283 175 166 214 287 257

Highband Products &

Services

% Success 86.84 80.7 92.06 88.89 83.93 89.66 82.61

Successes 33 46 58 48 47 52 38

Volume 38 57 63 54 56 58 46

Failures 5 11 5 6 9 6 8

Late 2 5 4 4 5 3 5

Narrowband Products &

Services

% Success 85.35 76.57 80.55 85.32 82 81.46 87.92

Successes 332 353 323 372 401 514 495

Volume 389 461 401 436 489 631 563

Failures 57 108 78 64 88 117 68

Late 31 68 37 30 50 81 43

Wideband Products &

Services

% Success 88.06 84.18 87.74 86.11 86.19 83.02 84.48

Successes 1,674 2,054 2,053 1,661 1,641 1,804 1,660

Volume 1,901 2,440 2,340 1,929 1,904 2,173 1,965

Failures 227 386 287 268 263 369 305

Late 90 210 134 132 159 203 209

Page 33: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Repair – Repeat Faults

   201002

(31May10)

201003 (30Jun10)

201004 (31Jul10)

201005 (31Aug10)

201006 (30Sep10)

201007 (31Oct10)

201008 (30Nov10)

PARTIAL PRIVATE CIRCUITS

 

Volume 2,328 2,958 2,804 2,419 2,449 2,862 2,574

OTR with Repeats

166 222 195 172 146 205 124

Late With Repeats

8 19 9 11 14 12 22

Late Without Repeats

115 264 166 155 200 275 235

Highband Poducts & Services

Volume 38 57 63 54 56 58 46OTR with Repeats

3 6 1 2 4 3 3

Late With Repeats

0 0 0 0 0 0 0

Late Without Repeats

2 5 4 4 5 3 5

Narrowband Products &

Services

Volume 389 461 401 436 489 631 563OTR with Repeats

26 40 41 34 38 36 25

Late With Repeats

6 4 1 1 4 1 6

Late Without Repeats

25 64 36 29 46 80 37

Wideband Product & Servicdes

Volume 1,901 2,440 2,340 1,929 1,904 2,173 1,965OTR with Repeats

137 176 153 136 104 166 96

Late With Repeats

2 15 8 10 10 11 16

Late Without Repeats

88 195 126 122 149 192 193

Page 34: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits – Mean Time to Repair

Family    201002

(31May10)201003

(30Jun10)201004

(31Jul10)201005

(31Aug10)201006

(30Sep10)201007

(31Oct10)201008

(30Nov10)

PARTIAL PRIVATE CIRCUITS

 

Average Repair

Time(hh:mm)

03:09 03:41 02:42 03:15 02:56 03:28 03:46

Total Time

(Days)304.26 453.22 314.6 326.7 297.85 412.74 402.63

Volume 2,328 2,958 2,804 2,419 2,449 2,862 2,574

Highband Products &

Services

Average Repair

Time(hh:mm)

04:46 01:46 02:30 01:50 02:11 03:27 03:53

Total Time

(Days)7.53 4.17 6.52 4.1 5.06 8.32 7.43

Volume 38 57 63 54 56 58 46

Narrowband Products &

Services

Average Repair

Time(hh:mm)

03:44 04:06 02:48 03:15 03:17 02:57 03:11

Total Time

(Days)60.44 78.67 46.56 58.76 66.7 77.38 74.3

Volume 389 461 401 436 489 631 563

Wideband Products &

Services

Average Repair

Time(hh:mm)

02:59 03:39 02:41 03:17 02:51 03:37 03:56

Total Time

(Days)236.29 370.38 261.51 263.83 226.09 327.04 320.91

Volume 1,901 2,440 2,340 1,929 1,904 2,173 1,965

Page 35: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits –Repair Stats - Chart

Page 36: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Communications: Published External Briefings

012/10 PPC Reduced Lead-Times

014/10 Cessation of 2Mbit/s PPC circuits in a 4x2Mbits Pricing Package

•eCO Repair Enhancements briefing - via the eCO Repair Helpdesk

Partial Private Circuits

Page 37: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private CircuitsPricing Notifications

•New prices notified 1 October 2010 and becomes effective 1 January 2011

Page 38: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

BCMR Update

BCMR calculations completed. Billing teams are liaising with CPs on an individual basis

2010 PPC Contract Review

First discussions meeting held 25th November 2010. BT to provide discussions output by 10th December 2010

Partial Private Circuits

Page 39: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Partial Private Circuits

A.O.B

.

Page 40: PPC Industry Forum 2 December 2010. Managed Bandwidth Services BTW Products and Strategy Disclaimer BT has taken reasonable care to check that the information.

Managed Bandwidth Services

BTW Products and Strategy

Forum Review

Next Meeting Scheduled

Proposed Date: 3 March 2011

Venue: TBC

Partial Private Circuits