PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a...

24
Circuit Reliability Review Blythe 2020

Transcript of PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a...

Page 1: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Circuit Reliability Review

Blythe

2020

Page 2: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Reliability Overview

8

Page 9: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CityList1Communities in the BLYTHE District

NEEDLES LANDING

NEIGHBORS

PALO VERDE

PARKER DAM

CHEMEHUEVI INDIAN TRIBE

COLORADO RIVER INDIAN TRIBES

DESERT CENTER

HAVASU HEIGHTS

HAVASU LAKE

HAVASU LANDING

BLYTHE

RIPLEY

ROADS END

IMPERIAL COUNTY

HAVASU PALMS

LAKE HAVASU

LAKE TAMARISK

MESA VERDE

11

Page 12: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitList1Overview of BlytheThere are 15 circuits that serve Blythe 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

BIGLER(4.8KV) 177 - - -

BOGEY(12KV) 262 - - -

BRUCE PARK(4.8KV) 364 - - -

CHANSLOR(33KV) 5 - - -

DATE(12KV) 522 - - -

DEL JUAN(12KV) 335 - - -

ELHERS(4.8KV) 313 - - -

LEAK(12KV) 398 - - -

LETTUCE(12KV) 388 - - -

MC COY(33KV) 2 - - -

MELON(12KV) 1,444 - - -

ONION(12KV) 1,481 - - -

RIVER BEND(12KV) 561 - - -

WEDGE(12KV) 436 - - -

WINTERS(12KV) 17 - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -

Grand Total 6,705

13

Page 14: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Blythe

Reliability History of Circuits Serving Blythe (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

203.9223.3

138.8153.0

134.5 139.7 136.8

178.0

0.0

50.0

100.0

150.0

200.0

250.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

2.2

1.21.1

1.4

1.1 1.2

0.9 1.0

0.0

0.5

1.0

1.5

2.0

2.5

SAIFI

(average

frequency of

sustained

interruptions)

4.0

2.01.6

1.1

1.61.8

1.4 1.4

0.0

1.0

2.0

3.0

4.0

5.0

MAIFI

(average

frequency of

momentary

interruptions)

14

Page 15: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Blythe

2019

3rd Party

1.9%

Equipment Failure

59.3%

Operation

22.0%

Other

0.5%

Weather /Fire

/Earthquake

16.3%

PSPS

0.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

15

Page 16: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Blythe

2019

3rd Party

6.7%

Equipment Failure

77.2%

Operation

5.3%

Other

0.2%

Weather /Fire

/Earthquake

10.6%

PSPS

0.0%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

17

Page 18: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

18

Page 19: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Back-up Slides

Reliability Histories of Circuits Serving Blythe

Updated through Dec 2019

19

Page 20: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

203.9 2.2 4.0 223.3 1.2 2.0 138.8 1.1 1.6 21.3 0.2 0.7 1.9 0.0 0.0 9.8 0.1 0.1 119.9 1.1 0.2 153.0 1.4 1.1

3rd Party 2% 1% 0% 7% 10% 11% 30% 32% 11% 13% 35% - - - 1% - - - 0% 3% - 2% 7% 0%

Equipment Failure 30% 14% 5% 34% 21% 4% 42% 39% 49% 26% 22% 11% 56% 38% 99% 63% 80% 30% 65% 85% 95% 59% 77% 33%

Operation 26% 34% - 9% 17% 5% 13% 11% 14% 2% 1% - 26% 40% - 32% 19% - 25% 5% - 22% 5% -

Other 7% 35% 65% 12% 32% 58% 1% 6% 20% 1% 1% 41% 3% 6% - 5% 0% 1% 0% 0% 5% 0% 0% 27%

Vegetation/Animal 0% 0% 2% 5% 8% 22% 7% 7% - - - 24% - - - - - - - - - - - 15%

Weather/Fire/Earthquake 36% 17% 27% 33% 12% - 7% 5% 6% 60% 42% 23% 16% 16% - - - 68% 10% 6% - 16% 11% 24%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

15 Circuits Serving Blythe -- Total Customers:

6,705

Average Reliability of 15 Circuits Serving Blythe

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

20

Page 21: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

BIGLER(4.8KV) - Customers: 177 8.3 1.0 2.0 10.0 0.0 - 45.1 1.2 2.0 1.7 0.0 - - - - - - - 28.9 1.0 - 30.7 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 52% 6% - - - - - - - - - - 100% 100% - 94% 98% -

Operation - - - 100% 100% - 19% 90% - - - - - - - - - - - - - - - -

Other 100% 100% 52% - - - 30% 4% 100% 100% 100% - - - - - - - - - - 6% 2% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 48% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BOGEY(12KV) - Customers: 262 543.9 5.0 6.0 297.2 2.1 - 14.9 0.1 3.6 124.4 0.9 0.1 - - 1.0 3.7 0.0 1.0 190.7 1.0 0.1 318.7 1.9 2.2

3rd Party - - - - - - - - 24% - - - - - - - - - - - - - - -

Equipment Failure 8% 20% 34% 69% 48% - - - 76% 100% 100% 100% - - 100% 100% 100% - 100% 100% 100% 100% 100% 55%

Operation 27% 40% - 25% 48% - - - - - - - - - - - - - - - - - - -

Other 2% 1% 33% 6% 4% - 70% 95% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 63% 39% 33% - - - 30% 5% - - - - - - - - - 100% - - - - - 45%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BRUCE PARK(4.8KV) - Customers: 364 9.1 1.0 2.0 168.7 1.0 - - - 0.1 - - 1.0 - - - - - - 28.1 1.0 - 28.1 1.0 1.0

3rd Party - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Equipment Failure 13% 1% - - - - - - - - - - - - - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - 100% - - - - - - - - - - - - - - -

Other 87% 99% 50% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 50% - - - - - - - - 100% - - - - - - - - - - - 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CHANSLOR(33KV) - Customers: 5 1114.7 2.7 8.0 - - 5.0 - - 4.9 138.2 1.9 - 2.5 0.5 - - - 4.7 44.7 1.2 1.2 185.4 3.5 5.9

3rd Party 90% 38% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - 25% - - - - - - - - - - - - - - - - - 100% - - 20%

Operation - - - - - - - - - 77% 50% - 100% 100% - - - - - - - 59% 40% -

Other 1% 38% 75% - - 80% - - 100% 23% 50% - - - - - - 60% 100% 100% - 41% 60% 48%

Vegetation/Animal 10% 25% - - - 20% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - 40% - - - - - 32%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Blythe - 1 of 4

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

21

Page 22: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

DATE(12KV) - Customers: 522 190.3 3.2 6.0 35.8 0.1 2.1 187.0 1.6 1.0 6.8 0.0 1.9 - - - - - - 106.2 2.4 - 113.0 2.4 1.9

3rd Party 14% 1% 2% - - - 66% 61% - - - - - - - - - - 3% 17% - 3% 17% -

Equipment Failure 0% 0% - 11% 21% 48% 21% 33% 100% 100% 100% 48% - - - - - - 97% 83% - 97% 83% 48%

Operation 20% 63% - - - - - - - - - - - - - - - - - - - - - -

Other 49% 32% 83% - - 52% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - 13% 6% - - - 52% - - - - - - - - - - - 52%

Weather/Fire/Earthquake 16% 3% 15% 89% 79% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DEL JUAN(12KV) - Customers: 335 906.4 2.0 4.0 1262.1 5.1 12.0 366.2 2.0 3.0 18.0 1.0 1.0 - - - 3.4 0.0 - - - - 21.4 1.0 1.0

3rd Party - - - - - - 32% 49% - - - - - - - - - - - - - - - -

Equipment Failure 43% 49% - 11% 21% - 67% 51% - - - - - - - - - - - - - - - -

Operation 0% 1% - 0% 0% 17% - - - - - - - - - 100% 100% - - - - 16% 3% -

Other - - 100% 9% 39% 67% 2% 0% 33% - - - - - - - - - - - - - - -

Vegetation/Animal 0% 1% - 14% 20% 17% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 56% 49% - 66% 20% - - - 67% 100% 100% 100% - - - - - - - - - 84% 97% 100%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ELHERS(4.8KV) - Customers: 313 8.0 1.0 2.0 12.8 0.0 - - - - - - - 17.5 0.0 - - - - 29.1 1.0 - 46.7 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - - - - - - - 100% 100% - - - - 100% 100% - 100% 100% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other 100% 100% 50% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 50% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LEAK(12KV) - Customers: 398 8.4 0.0 2.1 23.1 0.0 3.4 563.4 2.8 0.2 104.9 0.2 1.0 4.4 0.0 - 68.7 0.5 0.7 31.0 0.2 0.2 209.1 0.8 1.8

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 22% 8% - 7% 17% - 0% 0% 100% - - - 59% 45% - 100% 100% 100% 6% 3% - 35% 59% 38%

Operation 78% 92% - - - - 49% 35% - - - - 19% 27% - - - - - - - 0% 1% -

Other - - 100% 93% 83% 100% 0% 0% - - - 100% 21% 27% - - - - - - 100% 0% 1% 62%

Vegetation/Animal - - - - - - 21% 36% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 29% 29% - 100% 100% - - - - - - - 94% 97% - 64% 39% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Blythe - 2 of 4

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

22

Page 23: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

LETTUCE(12KV) - Customers: 388 457.4 4.1 6.0 27.6 0.1 2.0 2.5 0.0 1.0 61.2 1.1 0.9 - - - 1.0 0.0 - 40.2 1.0 2.0 102.4 2.1 2.9

3rd Party 0% 0% - - - - - - - 76% 91% - - - - - - - - - - 45% 47% -

Equipment Failure 38% 49% - 89% 31% - 100% 100% - - - - - - - 100% 100% - 100% 100% 100% 40% 49% 69%

Operation 8% 2% - 11% 69% - - - - - - - - - - - - - - - - - - -

Other 2% 24% 33% - - - - - 100% 2% 1% - - - - - - - - - - 1% 0% -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 53% 24% 67% - - - - - - 22% 8% 100% - - - - - - - - - 13% 4% 31%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MC COY(33KV) - Customers: 2 - - 1.0 1553.8 8.0 13.0 - - 2.0 1542.0 2.0 1.0 - - 1.0 - - - - - - 1542.0 2.0 2.0

3rd Party - - 100% - - - - - - - - - - - 100% - - - - - - - - 50%

Equipment Failure - - - 71% 25% 8% - - - - - - - - - - - - - - - - - -

Operation - - - 22% 13% 15% - - - 62% 50% - - - - - - - - - - 62% 50% -

Other - - - 7% 63% 77% - - 50% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - 50% 38% 50% 100% - - - - - - - - - 38% 50% 50%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MELON(12KV) - Customers: 1,444 64.6 1.1 3.0 26.3 1.0 - 157.9 0.9 3.4 0.2 0.0 1.0 2.1 0.0 - 12.3 0.0 - 134.5 1.0 - 149.1 1.1 1.0

3rd Party 2% 3% - - - - 35% 68% 12% - - - - - - - - - - - - - - -

Equipment Failure 67% 4% - 8% 0% - 63% 31% 58% 100% 100% - - - - - - - 100% 100% - 90% 95% -

Operation 19% 7% - - - - 2% 1% 30% - - - 100% 100% - 100% 100% - 0% 0% - 10% 5% -

Other 12% 86% 67% 87% 99% - - - - - - 100% - - - - - - - - - - - 100%

Vegetation/Animal - - - 5% 1% - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 33% - - - 0% 0% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ONION(12KV) - Customers: 1,481 212.1 2.3 2.9 17.9 0.2 2.0 74.2 1.1 - - - - 0.2 0.0 - 5.9 0.1 - 50.5 1.0 - 56.6 1.1 -

3rd Party - - - - - 50% - - - - - - - - - - - - - - - - - -

Equipment Failure 38% 4% - - - - 99% 100% - - - - 100% 100% - 100% 100% - 97% 99% - 98% 99% -

Operation 58% 53% - - - - - - - - - - - - - - - - 3% 1% - 2% 1% -

Other 4% 43% 66% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - 66% 98% 50% 1% 0% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 34% 34% 2% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Blythe - 3 of 4

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

23

Page 24: PowerPoint Presentation · Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory4

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

RIVER BEND(12KV) - Customers: 561 34.0 2.0 9.0 528.8 2.9 4.0 217.2 2.3 1.2 - - 1.0 4.2 0.0 - - - - 73.3 1.0 - 77.5 1.0 1.0

3rd Party - - - - - - 74% 47% - - - - - - - - - - - - - - - -

Equipment Failure 11% 0% - 23% 34% - 18% 6% - - - - 15% 20% - - - - 100% 100% - 95% 99% -

Operation 62% 51% - 11% 31% - 2% 17% - - - - - - - - - - - - - - - -

Other 23% 49% 78% - - 100% 4% 27% 100% - - - - - - - - - - - - - - -

Vegetation/Animal 3% 0% 11% - - - 2% 3% - - - 100% - - - - - - - - - - - 100%

Weather/Fire/Earthquake - - 11% 67% 35% - - - - - - - 85% 80% - - - - - - - 5% 1% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

WEDGE(12KV) - Customers: 436 470.3 5.9 4.9 1257.9 4.4 1.6 6.0 0.0 4.7 - - - - - - 14.2 0.0 0.9 795.3 2.9 1.0 809.5 3.0 2.0

3rd Party - - - 7% 25% - - - 20% - - - - - - - - - - - - - - -

Equipment Failure 9% 16% 38% 59% 23% - 100% 100% 60% - - - - - - 72% 50% - 20% 35% 100% 21% 35% 52%

Operation 33% 36% - 14% 30% - - - - - - - - - - 28% 50% - 59% 31% - 59% 31% -

Other - - 41% 19% 21% 100% - - 20% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 57% 48% 20% - - - - - - - - - - - - - - 100% 20% 35% - 20% 34% 48%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

WINTERS(12KV) - Customers: 17 81.3 0.5 0.5 - - - 460.7 2.4 - 1692.6 1.6 0.9 3.0 0.1 - 185.6 0.1 1.0 7.7 0.1 - 1888.9 1.7 1.9

3rd Party 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 35% 20% - - - - 100% 100% - - - 100% - - - 0% 3% 54%

Operation - - - - - - 51% 36% - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - 100% - - - 100% 100% - 100% 100% - 10% 6% 46%

Vegetation/Animal - - - - - - 12% 42% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 2% 2% - 100% 100% - - - - - - - - - - 90% 91% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

- - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Blythe - 4 of 4

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

24