PowerPoint Presentation - ELEXON...• Proposed Modification: from 1 April 2014 • Alternative...

32
PAB156 30 January 2014

Transcript of PowerPoint Presentation - ELEXON...• Proposed Modification: from 1 April 2014 • Alternative...

  • PAB156

    30 January 2014

  • PAB156 Open Session

    30 January 2014

  • PAB156/01b Non-confidential Settlement

    Risk Report

    Tabled 30 January 2014

  • PAB156/05 New Issue ‘Further

    Qualification Assurance for Suppliers’

    Simon Fox 30 January 2014

  • 4

    • PAB recommendation and Panel’s decision

    • Panel’s questions • Materiality of the issue • Solution - whether

    • A barrier to entry • Proportional • Due or undue discrimination

    • Questions the Issue Group might raise

    PAB 156/05 Purpose of Paper

  • 5

    • What has changed since P197?

    • Conclusions of review

    • P197 proposed vs alternative

    • Conclusions of P197 with respects to Supplier re-Qualification • Suppliers impact on Settlement • Supplier incentive to be compliant • Focus on other risks • Detective and remedial PATs mitigating any risk

    PAB 156/05 – Questions (1 of 6)

  • 6

    • What do you think is the materiality of the issue?

    • Assessment of the significance of the risk

    • Evidence for issue

    PAB 156/05 – Questions (2 of 6)

  • 7

    • What are your views on this being seen as a barrier to entry? • Burden

    • Proportionality

    PAB 156/05 – Questions (3 of 6)

  • 8

    • Is the solution due or undue discrimination? • Why controls against inactive or recently active Suppliers?

    • Why not controls against active Suppliers, which may change systems

    & processes and have a greater impact?

    PAB 156/05 – Questions (4 of 6)

  • 9

    • What other ways could the risk be managed?

    • Current PATs • BSC Audit • TA • EFR • Breach & Default

    • External controls • MRA controlled market entry

    – TA check in parallel – Potential MRA change

    • Ofgem removal of licence provisions

    PAB 156/05 – Questions (5 of 6)

  • 10

    • What is the underlying issue that the Modification was trying to resolve?

    • Materiality low

    • Available mitigating actions

    • Known issues impacting all Suppliers • Does the issue contribute to these? • Would additional Qualification controls mitigate these?

    • What’s to stop Suppliers’ making Material Changes later?

    PAB 156/05 – Questions (6 of 6)

  • 11

    ELEXON invites you to

    • RESPOND to the questions within this paper; and

    • PROVIDE views on the scope and membership of the Issue Group

    PAB 156/05 Recommendations

  • PAB156/06 Submission of P272

    Transition Plans

    David Kemp 30 January 2014

  • 13

    • P272: Mandate HH Settlement for PCs 5-8 • Proposed Modification: from 1 April 2014 • Alternative Modification: from 1 April 2015

    • Panel recommended Reject

    • Authority minded-to Approve Alternative

    • Authority decision anticipated by 13 February 2014

    Overview of P272

  • 14

    • Suppliers can transition customers as they wish • Must complete by Implementation Date

    • Concerns CoMC process can’t handle large numbers

    • Approx. 155,000 PC 5-8 customers

    • Transition plans should be sent to PAB • PAB can advise industry of any potential issues

    Transition Plans

  • 15

    • Notify Suppliers if P272 approved

    • Suppliers submit plans by 9 May 2014

    • ELEXON validates plans

    • Plans presented to PAB on 29 May 2014

    Next Steps

  • 16

    We invite you to:

    • NOTE that, if P272 is approved, Suppliers will be required to submit a high-level transition plan by 9 May 2014; and

    • NOTE that we will present these plans to the PAB at its meeting on 29 May 2014.

    Recommendations

  • EMR Update

    Lawrence Jones - Verbal 30 January 2014

  • 18

    ELEXON EMR Timeline

  • 19

    • DECC published consultation on EMR consequential BSC Changes - due by 13 Feb

    • Providing data and support to CFD and CM Settlement Agents

    • Enabling ELEXON to perform EMR roles

    • Protecting BSC Parties from EMR costs, risk and liabilities (and vice versa)

    BSC Changes for EMR

  • 20

    • All BSC and subsidiary document changes directed by SoS July 2014

    • Any subsequent EMR changes requiring BSC or subsidiary documents changes raised using existing BSC change process • CfD Counterparty and CM Settlement Body may raise changes

    • New BSC objective to facilitate operation of EMR • Modification Reports to include impact on EMR arrangements

    EMR BSC Change Process

  • 21

    How is BSC Data Used?

    CM Generators with BSC Meters

    BM Units HHDA

    CfD Generators with BSC Meters

    BM Units

    CfD Generators without BSC Meters

    Private Wire

    CM Generators without BSC Meters

    Private Wire

    STOR Meters

    CfD Suppliers

    BM Units

    CM Suppliers

    BM Units BSC Data

    Metering Option

    Non-BSC Data

    Metering Option

    Key

  • 22

    How is BM Unit data calculated for EMR?

    SVAA

    SAA Settlement Agent

    1a) All AI CCC IDs summed per supplier BM Unit to calculate SVA Gross Demand

    4) SAA-I014 - BM Unit Metered Volumes

    New flow – Supplier SVA & CVA BM Unit Loss Adjusted (Transmission & Distribution) Demand

    1b) Relevant TLM applied to SVA Demand from 1a)

    2) CVA BM Units* registered to Suppliers, where the Metered Volume is negative treated as CVA Demand. Appropriate TLM applied to CVA Demand

    New data flow – Gross SVA Demand

    3) SVA and CVA Demand added together

    Suppliers / Generators

    New data flow – invoice / credit note with associated backing data

    * Excludes Interconnector BM Units

  • 23

    • One DSR and embedded generator metering option for the Capacity Market proposes that MPAN-level consumption information is provided to the CM Settlement Agent by Supplier-appointed HHDAs

    • DECC held workshop with HHDC/HHDAs in Nov 13 • BSC changes drafted • DTC changes to be drafted and raised via normal industry process

    The Use of HHDAs for CM Settlement

    Supplier HHDA CM

    Settlement Agent

    Instruction to flag relevant MPANs

    Acceptance/rejection of instruction

    Flagged MPAN consumption data

  • 24

    Additional BM Unit Registrations for EMR

    • £100/month A.BMU charge will not apply to CfD/CM A.BMUs • CRA change currently under assessment

  • 25

    A.BMU Naming Convention

    New BMU ID Schema for CFD: C__ASUPP001 C_ Supplier BM Unit for EMR

    _A GSP Group ‘_A’

    SUPP 4 Character Supplier ID

    001

    Used to identify the CfD or Capacity Agreement. The number increments as more CFD/ Capacity Agreements are registered. Relationship created between this number and the CfD / Capacity Agreement ID from the settlement agent system.

    BMU Name

    The CfD / Capacity Agreement ID (no convention set yet) used in the settlement agent system will be stored in the A.BMU name field in the CRA system.

  • 26

    • Proposed change to section L (metering) • Access to property granted to CfD/CM Settlement Agent and CfD

    Counterparty and CM Settlement Body or nominated third party

    • TAA non-compliances need to be reported to CfD/CM Settlement Agent so CM/CfD metering non-compliance provisions can be applied where appropriate

    • Section S: Upon request from customer its Supplier is required to ensure its HHDA submits metered data to CM settlement agent

    • Qualification impact?

    • Supplier data at II Run onwards used for EMR Supplier funding calculations

    PAB Impact

  • 27

    • Document being prepared with interface options • Discussions on-going with DECC • Interface options with suppliers and generators include:

    • Email attachments e.g. with PDF and XML file • Secure FTP • Web services / portal • DTN • CVA network

    • Interested to hear views possible consultation • One size fits all vs. ability to choose interface

    Settlement Agent Interfaces

  • 28

    Key DECC Publications Over Last Two Months

    Date Published

    Title Type Status

    16 Jan 14 Allocation of CfDs Consultation Open

    15 Jan 14 Industry Code and License Modifications Consultation Open

    19 Dec 13 Draft Electricity Market Reform Delivery Plan

    Policy Paper -

    19 Dec 13 Regulations for Contracts for Difference (Standard Terms and Modifications)

    Consultation Open

    19 Dec 13 Contracts for Difference Policy Paper -

    10 Oct 13 Proposals for implementation of Electricity Market Reform

    Consultation Closed

  • 29

    • http://www.elexon.co.uk/reference/electricity-market-reform/

    • https://www.gov.uk/government/consultations/emr-consultation-on-industry-code-and-licence-modifications

    • Contacts • [email protected][email protected]

    More Information

    http://www.elexon.co.uk/reference/electricity-market-reform/https://www.gov.uk/government/consultations/emr-consultation-on-industry-code-and-licence-modificationshttps://www.gov.uk/government/consultations/emr-consultation-on-industry-code-and-licence-modificationshttps://www.gov.uk/government/consultations/emr-consultation-on-industry-code-and-licence-modificationsmailto:[email protected]:[email protected]

  • 220 Panel Update

    Verbal 30 January 2014

  • Big Ticket Items

    Verbal 30 January 2014

    Slide Number 1Slide Number 2PAB156/01b�Non-confidential Settlement Risk Report�PAB156/05�New Issue ‘Further Qualification Assurance for Suppliers’PAB 156/05 Purpose of PaperPAB 156/05 – Questions�(1 of 6)PAB 156/05 – Questions�(2 of 6)PAB 156/05 – Questions�(3 of 6)PAB 156/05 – Questions�(4 of 6)PAB 156/05 – Questions�(5 of 6)PAB 156/05 – Questions�(6 of 6)PAB 156/05 RecommendationsPAB156/06�Submission of P272 Transition PlansOverview of P272Transition PlansNext StepsRecommendations�EMR Update�ELEXON EMR TimelineBSC Changes for EMREMR BSC Change ProcessHow is BSC Data Used?How is BM Unit data calculated for EMR?The Use of HHDAs for CM SettlementAdditional BM Unit Registrations for EMRA.BMU Naming ConventionPAB ImpactSettlement Agent InterfacesKey DECC Publications Over Last Two MonthsMore Information�220 Panel Update���Big Ticket Items��