PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds...

33
Circuit Reliability Review Newport Beach 2020

Transcript of PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds...

Page 1: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Circuit Reliability Review

Newport Beach

2020

Page 2: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

2

• Southern California Edison (SCE) is an Edison International company

• One of the nation’s largest electric utilities

• More than 130 years of history

• Headquartered in Rosemead, California

• Regulated by the California Public Utilities Commission (CPUC) and the Federal Energy Regulatory Commission (FERC)

• 50,000 square miles of SCE service area across Central, Coastal, and Southern California

• 15 million residents in service territory

• 5 million customer accounts in 445 cities and communities

Who We Are

Page 3: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Our Grid

To deliver power safely, reliably and affordably, we monitor and maintain a vast electricity system.

730,000 Transformers

119,000 Miles of Transmission and Distribution Lines

4,600 Circuits

1.5 Million Poles

50,000 Square Miles

3

Page 4: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Strengthening and Modernizing the Grid

• Infrastructure reliability – updating underground

cables, poles, switches, and transformers

• Wildfire mitigation – hardening infrastructure,

bolstering situational awareness capabilities, and

enhancing operational practices

• Transmission – connecting renewables, installing

new substations, and updating lines

• Grid readiness – updating the grid for impacts

from new technologies

• Long-term energy policy – supporting energy

storage, electric vehicles, and renewables

SCE plans to spend more than $5B each

year to maintain, improve, and harden

its infrastructure.

SCE’s investments support safe, reliable, affordable, and clean energy for our customers

2019 Capital Investments

179 miles of underground cable replaced

502 miles of overhead conductor replaced for public safety

16.4k distribution poles replaced

4.3k transmission poles replaced

71 underground structure replacements

4

Page 5: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

PATHWAY 2045SCE’S vision to help California achieve a carbon neutral future

Carbon neutrality is achieved through deep decarbonization of

electricity, transportation and building electrification,

and the use of low-carbon fuels

Meeting California’s Climate Change Goals

5

Page 6: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

• SCE filed its second Wildfire

Mitigation Plan in February 2020

• It builds on the progress made

in 2019 to reduce the risk of fire

ignitions caused by utility

infrastructure

• SCE crews will continue to work

to install hi-tech wildfire

mitigation tools and

technologies to make

communities safer, more

resilient, and to help reduce the

number of Public Safety Power

Shutoffs (PSPS)

Addressing Wildfire Risk

6

Page 7: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

• De-energizing power lines to prevent ignitions

• Used during elevated fire conditions

• Primarily impacts circuits in high fire risk areas

• Use of multiple methods to notify people in affected areas before, during and after a de-energization event

Public Safety Power Shutoffs (PSPS)

7

4-7 DAYS AHEAD

3 DAYSAHEAD

2 DAYSAHEAD

1 DAY AHEAD POWER SHUTOFF

POWER RESTORATION

PLANNING AND MONITORING OUTAGE

*Erratic or sudden onset of conditions may impact our ability to provide advanced notice to customers.

Forecast Weather & Fire

Conditions

SCE Incident Management Team on Alert

County Operational Areas

informed of potential activation

SCE Incident Management

Team Activated

1st Notification PSPS Possible sent

to agencies and customers

2nd Notification PSPS

Possible

3rd Notification Power Shutoff

4th Notification Power Restored After Inspection

Page 8: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Reliability Overview

8

Page 9: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

What is Reliability?

• In simplest terms:

Having dependable electricity when you need it.

• Outages:

• Maintenance outages (aka planned outages)

• Repair outages (aka unplanned outages)

• Sustained Outage = An outage lasting > 5 minutes

• Momentary Outage = An outage lasting ≤ 5 minutes

9

Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption that spans multiple calendar days is accrued to the day on which the interruption began. Statistically, days having a daily system SAIDI greater than a threshold value are days on which the energy delivery system experienced stresses beyond that normally expected (such as severe weather).

Public Safety Power Shutoff (PSPS) : An operational protocol that SCE implements under extreme weather conditions in order to minimize the threat of wildfires and keep communities safe from potentially dangerous situations. These types of sustained outages are temporary and usually involve situations where high fire areas are experiencing adverse weather or public safety is at risk.

Page 10: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

How Do We Measure Reliability?

SAIDI SAIFI MAIFI CAIDI

10

Page 11: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CityList1Communities in the HUNTINGTON BEACH District

FOUNTAIN VALLEY

HUNTINGTON BEACH

NEWPORT BEACH

SEAL BEACH

WESTMINSTER

COSTA MESA

11

Page 12: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

*”Exclusions” are days which utilities are allowed to remove from their metrics because the outages on those days were caused by a severe acts of nature.**In the columns showing “Rank,” lower numbers indicate poorer performance.

12

Page 13: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitList1Overview of Newport BeachThere are 52 circuits that serve Newport Beach 1

Circuit Type Customers Circuit Type Customers Circuit Type Customers Circuit Type Customers

JANUARY(12KV) 4,403 LITTLER(12KV) 302 - -

ANNIKA(12KV) 1,800 MANGRUM(12KV) 568 - -

ARNOLD(12KV) 2,921 MIDDLECOFF(12KV) 1,494 - -

ATRIUM(12KV) 504 MINOSA(12KV) 453 - -

BALBOA(12KV) 1,116 MOONWALK(12KV) 3,124 - -

BERTEA(12KV) 640 NORDINA(4.16KV) 498 - -

CAPE(4.16KV) 793 OGLE(4.16KV) 1,042 - -

CHENUALT(12KV) 215 PENINSULA(12KV) 1,656 - -

CHURCHILL(12KV) 35 PERCH(12KV) 1,801 - -

CLIFF(4.16KV) 656 PIKE(12KV) 1,806 - -

COASTAL(12KV) 2,187 RICHARDS(4.16KV) 237 - -

CORBINA(12KV) 2,915 ROMMEL(12KV) 1,772 - -

DOOLITTLE(12KV) 2,235 RUTGERS(12KV) 966 - -

DUPONT(12KV) 84 SNEAD(12KV) 3,335 - -

ELMIRA(4.16KV) 691 STILLWELL(12KV) 114 - -

ELPAC(12KV) 31 TINKER(12KV) 2,835 - -

FARALLON(12KV) 516 VARDON(12KV) 641 - -

GEHRIG(12KV) 4,003 WAINWRIGHT(12KV) 783 - -

GOLDWATER(12KV) 2,394 WINGATE(12KV) 1,293 - -

GRUNION(12KV) 1,591 XEROX(12KV) 833 - -

GUNTHER(12KV) 3,101 YELLOWTAIL(12KV) 2,833 - -

HALSEY(12KV) 733 YACHT(4.16KV) 1,647 - -

HARPER(4.16KV) 839 - - -

HOGAN(12KV) 2,779 - - -

INLET(4.16KV) 625 - - -

JADE(12KV) 2,275 - - -

JAMBOREE(12KV) 2,476 - - -

KEWAMEE(12KV) 2,143 - - -

KRUEGER(12KV) 2,400 - - -

LA SALLE(12KV) 65 - - -

Grand Total 77,199

13

Page 14: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

BarChart

SCE SYSTEMWIDE

**Data is as of 02/14/2020, data

can be slightly different due to

outage data validation process

Newport Beach

Reliability History of Circuits Serving Newport Beach (No Exclusions)

**“Exclusions” are days which

utilities are allowed to

remove from their metrics

because the outages on

those days were caused by

acts of nature.

118.4 115.2

85.0

124.8

134.5 139.7 136.8

178.0

0.0

50.0

100.0

150.0

200.0

2016 2017 2018 2019

SAIDI

(average

minutes of

sustained

interruptions)

1.0 1.0

0.7

1.21.1

1.2

0.9

1.0

0.0

0.2

0.4

0.6

0.8

1.0

1.2

1.4

SAIFI

(average

frequency of

sustained

interruptions)

0.7 0.80.7

1.4

1.6

1.8

1.4 1.4

0.0

0.5

1.0

1.5

2.0

MAIFI

(average

frequency of

momentary

interruptions)

14

Page 15: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

SAIDIChart

SAIDI = the cumulative amount of time the average customer is interrupted by “sustained” outages each year.

Causes of Repair Outages in Newport Beach

2019

3rd Party

8.0%

Equipment Failure

68.2%

Operation

11.2%

Other

10.6%

Vegetation /Animal

0.2%

Weather /Fire

/Earthquake

1.8%

PSPS

0.0%

Contributions to SAIDI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found,

PSPS Operations

e.g., urgent maintenance w/o 3-daynotice

3rd Party e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

15

Page 16: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

SAIFIChart

SAIFI = the number of times the average customer is interrupted by “sustained” outages each year

Causes of Repair Outages in Newport Beach

2019

3rd Party

6.6%

Equipment Failure

70.4%

Operation

12.7%

Other

4.8%

Vegetation /Animal

1.5%

Weather /Fire

/Earthquake

4.1%

PSPS

0.0%

Contributions to SAIFI by Outage Cause

3rd Party

Equipment Failure

Operation

Other

Vegetation /Animal

Weather /Fire /Earthquake

PSPS

Equipment Failure

e.g., in-service failure of transformer, switch, or conductors

Vegetation/Animale.g., tree branch, rodent, or bird

causing a short circuit between conductors

Othere.g., patrolled but no cause found

Operationse.g., urgent maintenance w/o 3-day

notice 3rd Party

e.g., balloon, car hit pole, dig-in

PSPS

e.g., Public Safety Power Shutoff

16

Page 17: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

17

Page 18: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

18

Page 19: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

Back-up Slides

Reliability Histories of Circuits Serving Newport Beach

Updated through Dec 2019

19

Page 20: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CitySummary

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

118.4 1.0 0.7 115.2 1.0 0.8 85.0 0.7 0.7 37.8 0.4 0.5 9.8 0.1 0.2 27.0 0.2 0.3 50.2 0.5 0.5 124.8 1.2 1.4

3rd Party 3% 5% 10% 6% 4% 21% 6% 3% 25% 1% 0% 13% 44% 40% 81% 0% 0% 6% 11% 6% 7% 8% 7% 17%

Equipment Failure 80% 62% 25% 65% 65% 24% 73% 72% 39% 75% 80% 39% 49% 38% 19% 61% 83% 59% 71% 66% 40% 68% 70% 41%

Operation 8% 10% 21% 18% 16% 9% 12% 12% 3% 14% 18% - 4% 4% - 10% 7% 1% 12% 12% 2% 11% 13% 1%

Other - - 17% 4% 5% 14% 2% 3% 5% 10% 1% 14% 4% 17% - 29% 11% 35% 2% 3% 15% 11% 5% 17%

Vegetation/Animal 1% 14% 9% - - 12% 1% 1% 12% 0% 0% 35% - - - - - - 0% 3% 25% 0% 1% 21%

Weather/Fire/Earthquake 8% 8% 18% 7% 10% 20% 5% 9% 17% - - - - - - - - - 4% 10% 12% 2% 4% 4%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SCE SYSTEMWIDE 134.5 1.1 1.6 139.7 1.2 1.8 136.8 0.9 1.4 28.1 0.3 0.4 18.9 0.2 0.4 31.8 0.2 0.3 99.3 0.3 0.3 178.0 1.0 1.4

2nd Qtr 2019 3rd Qtr 2019

52 Circuits Serving Newport Beach -- Total

Customers: 77,199

Average Reliability of 52 Circuits Serving Newport Beach

4th Qtr 2019 20192016 2017 2018 1st Qtr 2019

Notes:

No outages are excluded from the metrics.

Outage Causes: Other: e.g., patrolled but no cause could be foundOperations: e.g., urgent maintenance w/o 3-day notice to customers3rd Party: e.g., balloons, car hit pole, dig-inVegetation/Animal: e.g., tree branch, rodent, or bird causing short circuit across conductorsPSPS: e.g., Public Safety Power Shutoff

SAIDI (minutes) = the cumulative amount of time the average customer is interrupted by “sustained” (longer than 5 minutes) outages.

SAIFI (interruptions) = the number of times the average customer is interrupted by “sustained” outages.

MAIFI (interruptions) = the number of times the average customer is interrupted by “momentary " (lasting 5 minutes or less) outages.

20

Page 21: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory1

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

ANNIKA(12KV) - Customers: 1,800 225.6 2.5 1.0 24.1 0.3 0.8 174.9 1.9 2.1 15.2 0.1 - 110.3 1.0 - 3.4 0.0 - - - - 128.9 1.1 -

3rd Party - - - - - - - - - - - - 100% 99% - - - - - - - 85% 89% -

Equipment Failure 89% 97% - 75% 65% 100% 64% 84% 54% 100% 100% - 0% 1% - - - - - - - 12% 10% -

Operation 11% 3% 100% 25% 35% - 36% 16% - - - - - - - 100% 100% - - - - 3% 2% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - 46% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ARNOLD(12KV) - Customers: 2,921 18.8 1.0 - 10.6 0.0 - 0.1 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 52% 3% - 60% 77% - - - - - - - - - - - - - - - - - - -

Operation - - - 40% 23% - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 48% 97% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ATRIUM(12KV) - Customers: 504 29.5 0.2 1.0 - - - 46.1 0.3 - - - 1.0 - - - - - - 797.2 1.0 - 797.2 1.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 57% 50% - - - - - - - - - - 99% 46% - 99% 46% -

Operation 100% 100% - - - - 43% 50% - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - 1% 54% - 1% 54% 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

BALBOA(12KV) - Customers: 1,116 - - - 3.8 0.0 - 353.0 2.6 0.2 - - - - - - 8.1 0.3 - 60.2 1.2 - 68.3 1.5 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 93% 84% 100% - - - - - - - - - 100% 100% - 88% 78% -

Operation - - - 100% 100% - 7% 16% - - - - - - - 100% 100% - - - - 12% 22% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 1 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

21

Page 22: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory2

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

BERTEA(12KV) - Customers: 640 7.0 1.0 - - - - 64.2 2.0 1.0 - - - 23.1 1.0 - 375.4 1.0 1.0 - - - 398.4 2.0 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 38% 50% 100% - - - 3% 0% - 0% 0% - - - - 0% 0% -

Operation - - - - - - 62% 50% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - 97% 100% - 100% 100% 100% - - - 100% 100% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CAPE(4.16KV) - Customers: 793 - - - 19.9 0.1 - 95.8 0.3 - 55.3 1.0 - 15.6 0.1 - 0.7 0.1 - 155.7 2.0 2.6 227.2 3.2 2.6

3rd Party - - - - - - - - - - - - - - - - - - - - 32% - - 32%

Equipment Failure - - - 33% 28% - 100% 100% - 97% 98% - 100% 100% - - - - 50% 50% 68% 65% 65% 68%

Operation - - - 67% 72% - - - - 3% 2% - - - - 100% 100% - - - - 1% 3% -

Other - - - - - - - - - - - - - - - - - - 50% 50% - 34% 32% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CHENUALT(12KV) - Customers: 215 109.2 2.0 - 78.2 1.0 - 112.8 2.0 - 9.4 0.1 - - - - - - - - - - 9.4 0.1 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 89% 50% - 100% 100% - 47% 50% - - - - - - - - - - - - - - - -

Operation 3% 1% - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 8% 49% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 53% 50% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CHURCHILL(12KV) - Customers: 35 9.0 1.0 - - - - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

2019

Reliability Histories for Individual Circuits Serving Newport Beach - 2 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019

22

Page 23: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory3

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

CLIFF(4.16KV) - Customers: 656 11.8 0.1 1.1 168.1 1.1 - 92.8 1.0 - - - - - - - - - - 15.4 0.1 1.0 15.4 0.1 1.0

3rd Party - - 100% - - - - - - - - - - - - - - - - - 100% - - 100%

Equipment Failure 96% 69% - 8% 5% - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation 4% 31% - 20% 2% - - - - - - - - - - - - - - - - - - -

Other - - - 73% 93% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

COASTAL(12KV) - Customers: 2,187 8.5 0.1 1.0 2.3 0.0 - 57.8 1.1 1.5 67.3 1.3 4.5 - - - 3.3 0.0 - 0.3 0.0 2.1 70.9 1.3 6.6

3rd Party - - - - - - - - - - - 29% - - - - - - - - - - - 20%

Equipment Failure 7% 9% 0% - - - 99% 99% 100% 96% 99% 42% - - - 100% 100% - 100% 100% - 97% 99% 29%

Operation 93% 91% - 100% 100% - 1% 1% - 0% 0% - - - - - - - - - - 0% 0% -

Other - - 100% - - - - - - 3% 0% - - - - - - - - - - 3% 0% -

Vegetation/Animal - - - - - - - - - - - 29% - - - - - - - - 33% - - 30%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - 67% - - 21%

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

CORBINA(12KV) - Customers: 2,915 20.7 0.1 - 307.2 2.1 2.1 35.2 0.3 1.8 - - - 0.2 0.0 - 0.0 0.0 1.1 2.2 0.0 2.3 2.4 0.1 3.4

3rd Party - - - 57% 40% 100% - - - - - - - - - - - - - - - - - -

Equipment Failure 80% 89% - 18% 4% - 96% 57% 100% - - - - - - - - - - - - - - -

Operation - - - 0% 1% - 4% 43% - - - - 32% 37% - 100% 100% - - - - 3% 9% -

Other - - - - - - - - - - - - 68% 63% - - - 100% - - 100% 5% 13% 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - 100% 100% - 92% 78% -

Weather/Fire/Earthquake 20% 11% - 26% 56% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

DOOLITTLE(12KV) - Customers: 2,235 59.8 1.2 - 103.6 1.1 0.3 10.6 0.1 - 10.5 0.2 - - - - - - - 4.1 0.0 - 14.6 0.2 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 55% 7% - 99% 92% 64% 70% 80% - 100% 100% - - - - - - - 100% 100% - 100% 100% -

Operation 31% 13% - 1% 8% 36% 30% 20% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 14% 80% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 3 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

23

Page 24: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory4

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

DUPONT(12KV) - Customers: 84 222.2 4.0 - 84.1 1.0 - - - - - - - - - - 411.5 1.0 - - - - 411.5 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ELMIRA(4.16KV) - Customers: 691 4.2 0.0 1.0 456.1 2.2 1.6 186.6 0.8 1.3 10.8 0.0 - - - - - - - 416.1 2.3 - 426.9 2.3 -

3rd Party - - 100% - - - - - - - - - - - - - - - 65% 52% - 64% 51% -

Equipment Failure - - - 56% 47% 100% 95% 69% 24% 44% 19% - - - - - - - 3% 1% - 4% 1% -

Operation 100% 100% - 9% 8% - 5% 31% - 56% 81% - - - - - - - 6% 4% - 7% 5% -

Other - - - 35% 45% - - - 76% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - 26% 43% - 25% 42% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ELPAC(12KV) - Customers: 31 - - - - - - - - - - - - - - - 283.1 1.0 - - - - 283.1 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

FARALLON(12KV) - Customers: 516 159.5 1.0 1.0 167.2 1.0 - 4.7 0.0 - - - 1.0 - - - - - - 80.9 1.0 1.0 80.9 1.0 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 99% - 100% 100% - 100% 100% - - - - - - - - - - 100% 100% - 100% 100% -

Operation 0% 1% - - - - - - - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 4 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

24

Page 25: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory5

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

GEHRIG(12KV) - Customers: 4,003 585.7 3.7 3.4 134.7 0.2 - 66.5 1.6 1.5 5.2 0.1 - - - - 37.5 0.6 0.4 0.4 0.0 - 43.0 0.6 0.4

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 88% 68% 57% 88% 47% - 37% 64% - 86% 82% - - - - 100% 100% 100% - - - 97% 97% 100%

Operation 3% 16% 29% 11% 48% - 2% 1% 1% - - - - - - - - - 7% 4% - 0% 0% -

Other - - - 1% 6% - - - - - - - - - - - - - 93% 96% - 1% 1% -

Vegetation/Animal - - - - - - 1% 0% 67% 14% 18% - - - - - - - - - - 2% 2% -

Weather/Fire/Earthquake 9% 15% 14% - - - 60% 35% 31% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GOLDWATER(12KV) - Customers: 2,394 467.7 4.2 - 193.5 2.1 - 236.7 0.3 - 111.7 0.7 0.5 3.5 0.1 - 0.1 0.0 - - - - 115.3 0.8 0.5

3rd Party - - - - - - 2% 7% - - - - - - - - - - - - - - - -

Equipment Failure 94% 75% - 84% 93% - 98% 93% - 98% 90% 100% 100% 100% - 100% 100% - - - - 98% 90% 100%

Operation 4% 1% - 14% 6% - - - - 2% 10% - - - - - - - - - - 2% 10% -

Other - - - 2% 1% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 2% 24% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GRUNION(12KV) - Customers: 1,591 69.6 0.4 - 15.6 0.0 2.0 - - - - - - - - - - - 1.0 7.2 0.0 - 7.2 0.0 1.0

3rd Party - - - - - 100% - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 96% 69% - - - - - - - - - - - - - 52% 43% - 52% 43% -

Operation 100% 100% - 4% 31% - - - - - - - - - - - - - 48% 57% - 48% 57% -

Other - - - - - - - - - - - - - - - - - 100% - - - - - 100%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

GUNTHER(12KV) - Customers: 3,101 4.0 0.3 - 0.8 0.0 - 27.0 0.2 - - - - - - - 2.2 0.1 - 49.9 1.4 - 52.1 1.5 -

3rd Party - - - - - - - - - - - - - - - 87% 32% - - - - 4% 1% -

Equipment Failure - - - - - - 28% 25% - - - - - - - - - - 0% 0% - 0% 0% -

Operation 100% 100% - 100% 100% - 72% 75% - - - - - - - 13% 68% - 25% 12% - 24% 14% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - 75% 88% - 72% 85% -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 5 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

25

Page 26: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory6

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

HALSEY(12KV) - Customers: 733 1.9 0.0 3.0 102.2 0.1 - 0.8 0.0 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 95% 69% - - - - - - - - - - - - - - - - - - -

Operation 100% 100% 66% 0% 24% - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 34% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - 5% 7% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HARPER(4.16KV) - Customers: 839 - - 1.0 85.0 1.0 3.0 - - - - - - - - - 4.3 0.0 - 187.0 1.0 - 191.3 1.0 -

3rd Party - - 100% 74% 95% - - - - - - - - - - - - - 100% 99% - 98% 97% -

Equipment Failure - - - 15% 3% - - - - - - - - - - 92% 36% - 0% 1% - 2% 2% -

Operation - - - 11% 2% - - - - - - - - - - 8% 64% - - - - 0% 2% -

Other - - - - - 33% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 34% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 34% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

HOGAN(12KV) - Customers: 2,779 59.1 0.3 0.1 145.9 2.1 4.9 1.9 0.0 - - - - 68.4 1.5 1.6 126.5 1.0 0.1 33.9 0.1 - 228.8 2.7 1.7

3rd Party - - - 27% 3% 39% - - - - - - 79% 53% 100% - - - - - - 24% 31% 92%

Equipment Failure 96% 74% 100% - - - 100% 100% - - - - 21% 47% - 99% 100% 100% 100% 100% - 76% 69% 8%

Operation 4% 26% - 37% 50% - - - - - - - 0% 0% - 1% 0% - - - - 1% 0% -

Other - - - 35% 47% 40% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 20% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

INLET(4.16KV) - Customers: 625 66.5 1.0 - 62.4 1.9 5.0 0.1 0.0 1.0 95.2 1.0 1.6 - - - - - - 45.3 0.5 1.9 140.5 1.5 3.5

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 43% 2% - - - 99% 100% 100% 45% - - - - - - 100% 100% 100% 100% 100% 75%

Operation - - - 33% 43% - 100% 100% 1% - - - - - - - - - - - - - - -

Other - - - - - - - - - - - 55% - - - - - - - - - - - 25%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 100% 100% - 24% 55% 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 6 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

26

Page 27: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory7

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

JADE(12KV) - Customers: 2,275 147.9 1.6 2.0 186.3 1.4 2.0 57.6 1.1 - 130.6 0.1 1.0 - - - 1.5 0.0 - 23.7 0.1 1.0 155.8 0.3 2.0

3rd Party - - - 3% 1% - - - - - - - - - - - - - - - - - - -

Equipment Failure 46% 46% - 77% 74% 50% 100% 100% - - - - - - - 100% 100% - 99% 88% - 16% 46% -

Operation 54% 54% 50% 17% 21% - - - - - - - - - - - - - 1% 12% - 0% 5% -

Other - - 50% 3% 4% - - - - 100% 100% - - - - - - - - - - 84% 49% -

Vegetation/Animal - - - - - 50% - - - - - 100% - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake 1% 0% - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JAMBOREE(12KV) - Customers: 2,476 9.5 0.1 0.0 12.9 0.1 1.0 164.6 1.8 - 70.3 0.0 - - - - 5.7 0.0 0.0 - - - 76.0 0.1 0.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 99% 93% 100% 54% 56% - 94% 89% - 100% 100% - - - - - - - - - - 93% 51% -

Operation 1% 7% - 46% 44% - 6% 11% - - - - - - - 100% 100% 100% - - - 7% 49% 100%

Other - - - - - 100% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

JANUARY(12KV) - Customers: 4,403 253.2 2.5 1.0 157.1 2.4 0.6 257.8 1.4 1.0 8.5 0.0 1.0 6.3 0.2 1.0 156.6 1.3 2.0 319.2 3.3 1.6 490.6 4.9 5.6

3rd Party - - - - - - - - - - - - - - 100% - - - - - - - - 18%

Equipment Failure 98% 98% 2% 91% 95% 100% 88% 76% - 20% 49% - 53% 4% - 99% 100% 100% 97% 99% 100% 96% 94% 64%

Operation 2% 2% - 9% 5% - 12% 23% - 80% 51% - 12% 3% - 1% 0% - 3% 1% - 4% 1% -

Other - - - - - - 0% 0% - - - 100% 35% 93% - - - - - - - 0% 4% 18%

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - 98% - - - - - 100% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

KEWAMEE(12KV) - Customers: 2,143 80.4 0.2 - 22.8 0.2 - 5.1 0.1 - 119.4 1.6 1.0 - - - 85.3 0.1 0.0 26.5 0.2 1.0 231.3 2.0 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 92% 85% - - - - - - - 98% 91% - - - - 12% 35% - 86% 74% - 65% 85% -

Operation 8% 15% - 100% 100% - 100% 100% - 2% 9% - - - - 88% 65% 100% - - - 34% 12% 1%

Other - - - - - - - - - - - - - - - - - - 14% 26% - 2% 3% -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - - - 100% - - 99%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 7 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

27

Page 28: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory8

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

KRUEGER(12KV) - Customers: 2,400 - - 1.0 321.0 2.1 - 167.1 2.1 - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 100% 100% - 49% 50% - - - - - - - - - - - - - - - -

Operation - - - 0% 0% - 7% 3% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - 44% 47% - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LA SALLE(12KV) - Customers: 65 113.9 2.9 - - - - 3.8 0.0 - - - - - - - 512.0 2.0 - - - - 512.0 2.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 100% 100% - - - - 100% 100% - - - - - - - 12% 50% - - - - 12% 50% -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - 88% 50% - - - - 88% 50% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

LITTLER(12KV) - Customers: 302 274.1 0.6 0.7 53.1 0.1 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation 100% 100% - 100% 100% - - - - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MANGRUM(12KV) - Customers: 568 336.3 1.0 1.9 - - - 70.7 1.0 1.0 - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 1% 1% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - 99% 99% 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 100% 100% 100% - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 8 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

28

Page 29: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory9

SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

MIDDLECOFF(12KV) - Customers: 1,494 11.8 0.0 - 555.4 3.1 1.1 188.6 0.3 1.0 181.4 2.1 1.3 2.7 0.1 - - - - 125.6 1.0 - 309.7 3.2 1.3

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 0% 6% - 98% 98% 100% - - - 89% 90% 100% 78% 93% - - - - - - - 53% 62% 100%

Operation 100% 94% - 2% 2% - 100% 100% 100% 11% 10% - 22% 7% - - - - 100% 100% - 47% 38% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MINOSA(12KV) - Customers: 453 55.6 0.4 1.0 11.6 0.2 - 125.6 1.2 - 8.1 0.1 1.0 41.6 0.1 - - - - 351.8 1.6 1.0 401.5 1.8 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 37% 26% - - - - 88% 87% - 100% 100% - 100% 100% - - - - 100% 100% - 100% 100% -

Operation 63% 74% - 100% 100% - 12% 13% - - - - - - - - - - - - - - - -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

MOONWALK(12KV) - Customers: 3,124 17.8 0.1 1.0 19.7 0.0 1.0 15.5 0.1 - 10.7 1.0 - 1.1 0.0 - - - - 52.7 0.8 0.2 64.6 1.8 0.2

3rd Party 12% 15% 99% 14% 17% - 11% 18% - - - - - - - - - - - - - - - -

Equipment Failure 23% 6% 1% - - - 81% 74% - 100% 100% - - - - - - - - - - 17% 55% -

Operation 7% 13% - 86% 83% - 4% 1% - - - - - - - - - - 100% 100% 100% 82% 44% 100%

Other - - - - - - - - - - - - 100% 100% - - - - - - - 2% 1% -

Vegetation/Animal - - - - - - 5% 7% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 59% 66% - - - 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

NORDINA(4.16KV) - Customers: 498 0.7 0.0 3.1 1.4 0.0 - 16.6 0.1 - - - - - - - - - - 305.7 1.3 - 305.7 1.3 -

3rd Party - - - - - - - - - - - - - - - - - - 48% 78% - 48% 78% -

Equipment Failure - - 100% 100% 100% - - - - - - - - - - - - - 52% 22% - 52% 22% -

Operation 100% 100% - - - - 100% 100% - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 9 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

29

Page 30: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory10SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

OGLE(4.16KV) - Customers: 1,042 11.7 0.0 - 2.1 0.0 2.0 0.8 0.0 3.0 - - - - - - 2.1 0.0 - - - 1.0 2.1 0.0 1.0

3rd Party - - - - - 50% - - - - - - - - - - - - - - 100% - - 100%

Equipment Failure 32% 7% - 100% 100% - 100% 100% - - - - - - - 100% 100% - - - - 100% 100% -

Operation 68% 93% - - - - - - - - - - - - - - - - - - - - - -

Other - - - - - - - - 67% - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - 50% - - 33% - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PENINSULA(12KV) - Customers: 1,656 - - 1.0 - - - 3.4 0.0 - 28.7 0.8 0.8 - - - - - - - - 1.2 28.7 0.8 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - - - - - - - 100% 100% - - - - - - - - - - 100% 100% -

Other - - 100% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - 100% - - - - - - - - 100% - - 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PERCH(12KV) - Customers: 1,801 23.1 0.5 - 12.9 0.1 0.8 106.5 1.2 - 0.5 0.0 - 6.9 0.1 1.0 0.9 0.0 - - - - 8.2 0.1 1.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 33% 19% - 50% 54% 100% 23% 13% - 100% 100% - 100% 100% 100% 100% 100% - - - - 100% 100% 100%

Operation 15% 38% - 50% 46% - - - - - - - - - - - - - - - - - - -

Other - - - - - - 77% 87% - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 52% 43% - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

PIKE(12KV) - Customers: 1,806 233.1 1.0 - 84.6 1.1 1.0 7.4 0.2 1.0 - - - - - - - - 1.0 22.6 0.1 1.0 22.6 0.1 2.0

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 75% 12% - 46% 6% - 24% 1% - - - - - - - - - - 100% 100% 100% 100% 100% 49%

Operation 1% 1% - 2% 1% - 33% 90% - - - - - - - - - - - - - - - -

Other - - - - - - 43% 8% - - - - - - - - - 100% - - - - - 51%

Vegetation/Animal - - - - - - - - 100% - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 24% 87% - 52% 93% 100% - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 10 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

30

Page 31: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory11SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

RICHARDS(4.16KV) - Customers: 237 42.9 0.1 - 1115.4 1.2 1.0 - - - - - - - - - - - - - - 5.0 - - 5.0

3rd Party - - - - - - - - - - - - - - - - - - - - 20% - - 20%

Equipment Failure 100% 100% - 9% 15% - - - - - - - - - - - - - - - 60% - - 60%

Operation - - - 91% 85% 100% - - - - - - - - - - - - - - 20% - - 20%

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

ROMMEL(12KV) - Customers: 1,772 9.0 1.0 - 154.0 0.9 0.2 - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - 100% 100% 100% - - - - - - - - - - - - - - - - - -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

RUTGERS(12KV) - Customers: 966 6.9 0.0 1.0 98.6 0.1 1.0 95.7 1.0 - - - 1.2 - - - 0.2 0.0 - 6.6 0.8 - 6.8 0.8 1.2

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Operation - - - 100% 100% 100% - - - - - - - - - 100% 100% - - - - 2% 4% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% 100% - - - - - - - - 100% - - - - - - 100% 100% - 98% 96% 100%

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

SNEAD(12KV) - Customers: 3,335 467.2 2.4 2.0 239.9 3.1 1.0 136.6 1.0 1.3 169.7 2.4 - - - - 3.7 0.0 - 6.6 1.0 - 180.1 3.4 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 96% 94% 52% 68% 65% - 98% 85% 99% 53% 58% - - - - 100% 100% - 94% 100% - 55% 70% -

Operation 4% 6% 48% 32% 35% 100% 2% 15% 1% 47% 42% - - - - - - - 6% 0% - 45% 30% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 11 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

31

Page 32: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory12SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

STILLWELL(12KV) - Customers: 114 - - 1.0 477.7 2.0 - - - - - - - - - - - - - - - - - - -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - 98% 50% - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - - - - - - - - - -

Other - - - 2% 50% - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - 100% - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

TINKER(12KV) - Customers: 2,835 33.5 0.0 1.0 320.5 3.0 1.0 108.4 0.3 1.7 - - - 88.2 0.4 - 8.7 0.1 - 6.0 0.0 - 103.0 0.5 -

3rd Party - - - - - - - - 58% - - - - - - - - - - - - - - -

Equipment Failure 16% 53% - 64% 67% 100% 86% 81% 42% - - - 91% 67% - 99% 99% - - - - 87% 65% -

Operation - - - 0% 0% - 14% 19% - - - - 9% 33% - 1% 1% - - - - 8% 27% -

Other - - - - - - - - - - - - - - - - - - 100% 100% - 6% 8% -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake 84% 47% 100% 36% 33% - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

VARDON(12KV) - Customers: 641 267.3 3.6 3.2 - - - 83.4 0.4 1.3 0.8 0.0 1.0 - - - - - - - - - 0.8 0.0 1.0

3rd Party - - - - - - - - - - - 100% - - - - - - - - - - - 100%

Equipment Failure 100% 100% 69% - - - 65% 84% 100% 100% 100% - - - - - - - - - - 100% 100% -

Operation 0% 0% - - - - - - - - - - - - - - - - - - - - - -

Other - - 31% - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - 35% 16% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

WAINWRIGHT(12KV) - Customers: 783 38.6 1.0 - 25.9 0.1 1.0 - - - - - - - - - 1.1 0.0 - 60.6 1.0 - 61.7 1.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure 70% 3% - 84% 83% 100% - - - - - - - - - - - - 100% 100% - 98% 99% -

Operation 7% 1% - 16% 17% - - - - - - - - - - 100% 100% - - - - 2% 1% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 23% 96% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 12 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

32

Page 33: PowerPoint Presentation · 9 Major Event Day (MED) : A day in which the daily system SAIDI exceeds a threshold value. For the purposes of calculating daily system SAIDI, any interruption

CircuitHistory13SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI SAIDI SAIFI MAIFI

WINGATE(12KV) - Customers: 1,293 9.0 1.0 - - - - - - - - - - - - - 0.1 0.0 - - - - 0.1 0.0 -

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - - - - - - - - - - - - -

Operation - - - - - - - - - - - - - - - 100% 100% - - - - 100% 100% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

XEROX(12KV) - Customers: 833 36.1 0.2 - 51.7 1.0 - 46.7 0.9 - - - - 57.4 0.8 0.7 612.7 2.2 1.0 - - - 670.1 3.0 1.7

3rd Party - - - - - - - - - - - - - - - - - - - - - - - -

Equipment Failure - - - - - - - - - - - - 100% 100% 100% 10% 47% 100% - - - 18% 61% 100%

Operation 100% 100% - - - - - - - - - - - - - - - - - - - - - -

Other - - - 100% 100% - - - - - - - - - - 90% 53% - - - - 82% 39% -

Vegetation/Animal - - - - - - 100% 100% - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

YACHT(4.16KV) - Customers: 1,647 5.4 0.0 - - - 0.3 - - - 13.5 0.7 - - - 0.7 4.3 0.0 0.7 45.6 1.0 - 63.4 1.7 1.3

3rd Party - - - - - - - - - - - - - - 100% - - 100% - - - - - 100%

Equipment Failure 100% 100% - - - - - - - 43% 98% - - - - 100% 100% - 100% 100% - 88% 99% -

Operation - - - - - - - - - 57% 2% - - - - - - - - - - 12% 1% -

Other - - - - - 100% - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - - - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

YELLOWTAIL(12KV) - Customers: 2,833 58.3 1.0 - 47.9 1.1 1.0 157.7 1.6 2.6 159.4 0.6 1.3 0.9 0.0 - - - - 33.2 0.0 0.8 193.5 0.6 2.1

3rd Party 97% 99% - - - - 59% 28% 100% 3% 3% - - - - - - - - - - 2% 3% -

Equipment Failure - - - 94% 96% - 41% 67% - 97% 94% 100% 100% 100% - - - - 100% 100% 100% 97% 95% 100%

Operation 3% 1% - 6% 4% - 0% 5% - 0% 3% - - - - - - - - - - 0% 3% -

Other - - - - - - - - - - - - - - - - - - - - - - - -

Vegetation/Animal - - - - - 100% - - - - - - - - - - - - - - - - - -

Weather/Fire/Earthquake - - - - - - - - - - - - - - - - - - - - - - - -

PSPS - - - - - - - - - - - - - - - - - - - - - - - -

Reliability Histories for Individual Circuits Serving Newport Beach - 13 of 13

2016 2017 2018 1st Qtr 2019 2nd Qtr 2019 3rd Qtr 2019 4th Qtr 2019 2019

33