PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing...

26
1

Transcript of PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing...

Page 1: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

1

Page 2: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

2

Page 3: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

••

3

Page 4: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

4

Page 5: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

5

Page 6: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

6

Page 7: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

7

Page 8: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

8

Page 9: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

9

Page 10: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

10

Page 11: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

11

Page 12: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

12

Page 13: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

13

Page 14: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

14

Page 15: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.
Page 16: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

••

Page 17: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

Page 18: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

••

••

••

Page 19: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.
Page 20: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

Page 21: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

Existing sewer line goes right through sculpture location

No other suitable location; had to redesign foundation to accommodate sewer line

Page 22: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

Accommodates additional viewing space for the front face of the sculpture that looks down stream

Sculpture base finishes will integrate with plaza finishes

Page 23: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.
Page 24: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.
Page 25: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.

••

Page 26: PowerPoint Presentation€¦ · 11-07-2017  · Conceptual Foundation Layout Preliminary Costing Purposes Only —4R +1. pile cap, 2ft below grade-T al Volume approx 140 cubic yards.