PROJECT PEGASUS vs.
TRINITY TOLL ROAD
BY COUNCILMEMBERS
ANGELA HUNT, SANDY GREYSON, & SCOTT GRIGGS
1
-
7/31/2019 Powerpoint for Mayor Rev4
2/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
CONCLUSION BASED ON TXDOT DATA
Project Pegasus moves more cars, faster,
with less congestion, for less money,than the Trinity Toll Road.
2
-
7/31/2019 Powerpoint for Mayor Rev4
3/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS MOVES MORE CARS
TRAFFIC
UTILIZATION
TRINITY TOLL
ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30)
TOTAL
ADDED
VEHICLES/DAY
Current Conditions (2010) 305,000 185,000 230,000
2035 Trinity Toll Road Only 100,000 to
142,000 288,000 219,000 255,0002030 Project Pegasus Only 422,200 333,000 342,900
Additional Vehicles Per Day(Current vs. Trinity Toll Road Only)
100,000 to
142,000-17,000 34,000 25,000 100,000 to 142,000
Additional Vehicles Per Day(Current vs. Project Pegasus Only) 0 117,200 148,000 112,900 126,033 to 260,900*
Project Pegasus moves more cars than the Trinity Toll Road.
3
*126,033 is the average of the three components of Project Pegasus (TXDOTs methodology for determining the capacity ofProject Pegasus, see Trinity Matrix Summary Table 1).260,900 is the sum of the Canyon and Lower Stemmons (TXDOTs methodology for determining the capacity of two inter-dependent components Project Pegasus and the Trinity Toll Road, see Trinity Matrix Summary Table 2).
-
7/31/2019 Powerpoint for Mayor Rev4
4/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS MOVES TRAFFIC FASTER
Project Pegasus moves traffic 5 mph faster than the Trinity Toll Road. 4
AVERAGE SPEED TRINITY
TOLL ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30)
Current Conditions (2010) 42 51 mph 43 mph 42 mph2035 Trinity Toll Road Only 30 mph2030 Project Pegasus Only 35 mph2030 Both Built 36 mph
-
7/31/2019 Powerpoint for Mayor Rev4
5/26
Project Pegasus has a smaller percentage of lane miles with a FAILING Level of Service
compared to the Trinity Toll Road.
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS HAS BETTER LEVEL OF SERVICE
LEVEL OF SERVICE TRINITY
TOLL ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30)
Current Conditions (2010) F F F2035 Trinity Toll Road Only D-E F F F2030 Project Pegasus Only F F D-F2030 Both Built C-F C-F E-F D-F
Project Pegasus improves the Level of Service on Lower Stemmons (from F to D-F).
The Horseshoe, Canyon, and Lower Stemmons all remain level F if Trinity Toll Road is built.
LANE MILES at LOS F TRINITY
TOLL ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30)
Current Conditions (2010) Not Available N/A N/A
2035 Trinity Toll Road Only 49%2030 Project Pegasus Only 46%2030 Both Built 43% 5
-
7/31/2019 Powerpoint for Mayor Rev4
6/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS REDUCES CONGESTION
CONGESTION DELAY(vehicle hours)
TRINITYTOLL ROAD
HORSESHOE CANYON LOWERSTEMMONS
(183 to I-30)
Current Conditions (2010) 2,964 to 9,653 9,653 2,94
2035 Trinity Toll Road Only 67,982 hours
2030 Project Pegasus Only 44,917 hours
2030 Both Built 41,679 hours
Cars sit in congested traffic 23,065 hours less if Project Pegasus is
built than if the Trinity Toll Road is built.
6
-
7/31/2019 Powerpoint for Mayor Rev4
7/26
PROJECT PEGASUS:
6 Main Lanes added to Canyon
+ 2 Main Lanes added to Lower Stemmons
= 8 Main Lanes Added to Downtown System7
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS ADDS MORE MAIN LANES
TRINITY TOLL ROAD:
6 Main Lanes Added to Downtown System
-
7/31/2019 Powerpoint for Mayor Rev4
8/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
TXDOT DATA: PEGASUS IS CHEAPER
PROJECT PEGASUSTRINITY TOLL ROAD
8
$1.47 Billion
$818 M Horseshoe
$599 M Upper Stemmons
$293 M Canyon
+ $309 M Lowest Stemmons
$1.2 Billion
$818 M Horseshoe
$599 M Upper Stemmons
$293 M Canyon
+ $309 M Lowest Stemmons
$602 Million
8
$1.2 Billion $602 MillionOR
(Horseshoe is already funded.)
Project Pegasus costs $279 Million to $868 Million LESS than the Trinity Toll Road.
-
7/31/2019 Powerpoint for Mayor Rev4
9/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
CONFLICT BETWEEN DATA AND NARRATIVE
Narrative and Trinity Matrix Summary are
misleading, conflict with TXDOTs data, andreveal a bias in favor of the Trinity Toll Road
that is not supported by TXDOTs documents.
9
-
7/31/2019 Powerpoint for Mayor Rev4
10/26
FLAWS IN MATRIX SUMMARY
WRONG SCENARIO USEDCant compare projects using
Both Built scenario.
Cannot determine which project BY ITSELF moves more cars for less money if we
use figures that assume BOTH projects are built.
Using Both Built scenario minimizes Project Pegasus positive effects on traffic,which are superior to Trinitys.
Should compare Trinity Only scenario to Pegasus Only scenario to properlycompare projects.
10
-
7/31/2019 Powerpoint for Mayor Rev4
11/26
Full capacity improvements for Lowest
Stemmons (IH30 to DNT) cannot beattained unless Upper Stemmons (DNT
to SH 183) is also improved.
11
FLAWS IN MATRIX SUMMARY
CONCLUSIONS NOT SUPPORTED BY DATA
Where is data or modeling to support this claim?
-
7/31/2019 Powerpoint for Mayor Rev4
12/26
This significantly understates Pegasus added
Vehicles Per Day and is not calculated the
same way as the Trinitys added VPD.
Trinity Parkway provides 132,000
additional vpd and Pegasus
provides 93,300 additional vpd.
12
FLAWS IN MATRIX SUMMARY
INCONSISTENT CALCULATION FOR INCREASED VPD
-
7/31/2019 Powerpoint for Mayor Rev4
13/26
FLAWS IN MATRIX SUMMARY
HOW IS ADDED CAPACITY CALCULATED?
Total Vehicles Per Day is the SUM of the components:
TOTAL CAPACITY = COMPONENT A VPD + COMPONENT B VPD13
-
7/31/2019 Powerpoint for Mayor Rev4
14/26
For Project Pegasus, however, TOTAL VPD is calculated by AVERAGING the components:
DITTO
DITTODITTO
This error SIGNIFICANTLY REDUCES TOTAL Vehicles Per Day for
Project Pegasus, comparing unfavorably to the Trinity Toll Road.
FLAWS IN MATRIX SUMMARY
PEGASUS ADDED VPD IS INCONSISTENT
14
-
7/31/2019 Powerpoint for Mayor Rev4
15/26
FLAWS IN MATRIX SUMMARY
ADDED VPD SHOULD BE CALCULATED USING
REAL TRAFFIC, NOT HYPOTHETICAL CAPACITY
15
This erroneous calculation for Added Vehicles Per Day benefits the Trinity Toll Road since
its CAPACITY is greater than the REAL TRAFFIC it will move (132,000 vs. 114,000).
-
7/31/2019 Powerpoint for Mayor Rev4
16/26
Use PROJECT PEGASUS ONLY build scenario versus TRINITY TOLL ROAD ONLY
build scenario.
FLAWS IN MATRIX SUMMARY
HOW TO CALCULATE ACCURATE ADDED VPD
16
To correctly compare the increase in vehicles per day for Pegasusand the Trinity, we must:
Calculate VPD using SUM methodology instead ofAVERAGING components.
Use REAL TRAFFIC figures, not hypothetical CAPACITY.
-
7/31/2019 Powerpoint for Mayor Rev4
17/26
FLAWS IN MATRIX SUMMARY
CORRECT ADDED VPD CALCULATION
TRAFFIC UTILIZATION
TRINITY
TOLL ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30) TOTAL
Future Conditions in 2030
If Only TRINITY TOLL RD Is Built
100,000 to
142,000288,000 219,000 255,000
Current Conditions in 2010 0 305,000 185,000 230,000
Additional Vehicles Per Day
TRINITY TOLL ROAD
100,000 to
142,000 -17,000 34,000 25,000100,000 to
142,000
17
If only the Trinity Toll Road is built.
TRAFFIC UTILIZATION TRINITYTOLL ROAD
HORSESHOE CANYON LOWER
STEMMONS(183 to I-30)
TOTAL
Future Conditions in 2030If Only PROJECT PEGASUS Is Built 0 422,200 333,000 342,900
Current Conditions in 2010 0 305,000 185,000 230,000
Additional Vehicles Per Day
PROJECT PEGASUS0 117,200 148,000 112,900
126,033 to
260,900
If only Project Pegasus is built.
Project Pegasus moves more cars than the Trinity Toll Road.
-
7/31/2019 Powerpoint for Mayor Rev4
18/26
$818 M Horseshoe
$599 M Upper Stemmons
$293 M Canyon
+ $309 M Lowest Stemmons
$2.02 Billion
FLAWS IN MATRIX SUMMARY
INFLATED CALCULATION OF PEGASUS TOTAL COST
$818 M Horseshoe ALREADY PAID FOR$599 M Upper Stemmons
$293 M Canyon
+ $309 M Lowest Stemmons
$1.2 Billion ($179M/mile)
$818 M Horseshoe
$599 M Upper Stemmons
$293 M Canyon
+ $309 M Lowest Stemmons
$602 Million ($177M/mile)18
-
7/31/2019 Powerpoint for Mayor Rev4
19/26
According to TXDOTs documents, TrinityToll Road funding is TBD.
The Trinity Parkway has a
significant funding source (toll
revenue) to help support the project.
19
Where is documentation that the NTTA willdefinitely fund project?
How much money is significant andwhere are documents to support this?
FLAWS IN MATRIX SUMMARY
SIGNIFICANT TOLL ROAD FUNDING UNSUPPORTED
-
7/31/2019 Powerpoint for Mayor Rev4
20/26
Where are documents supporting claim?
20
FLAWS IN MATRIX SUMMARY
CANYON DETOUR COST INCREASE UNSUPPORTEDConstruction costs associated with
the Canyon will increase if the Trinity
Parkway is not available as an
alternate route during construction.
According to TXDOTs documents, Canyondetour cost is Not Available.
-
7/31/2019 Powerpoint for Mayor Rev4
21/26
TXDOT documents: NO COST for detours for High Five, Central Expressway, and LBJ.
Costs for alternative route improvements for those projects included bettersignalization and improvements to parallel streets.
21
FLAWS IN MATRIX SUMMARY
CANYON DETOUR COST INCREASE UNSUPPORTED
-
7/31/2019 Powerpoint for Mayor Rev4
22/26
TXDOT Documents: No documents or data supports claim that Canyon drivers would use
Trinity Toll Road as detour during Canyon construction.
TXDOT Documents: No analysis of how many cars would use Trinity Toll Road as relieverroute during Canyon construction.
22
FLAWS IN MATRIX SUMMARY
CANYON DETOUR COST INCREASE UNSUPPORTED
-
7/31/2019 Powerpoint for Mayor Rev4
23/26
6 Main Lanes added to Canyon (pp. 6 and 8)
+ 2 Main Lanes added to Lower Stemmons (pp. 6 and 8)
= 8 Total Lanes Added to Downtown System by Project Pegasus
FLAWS IN MATRIX SUMMARY
UNDERSTATES PEGASUS ADDED MAIN LANES
23
Pegasus adds 8 Main Lanes, not 2 to 4
-
7/31/2019 Powerpoint for Mayor Rev4
24/26
FLAWS IN MATRIX SUMMARY
UNDERSTATES PEGASUS ADDED MANAGED LANES
2 Managed Lanes added to Canyon (pp. 6 and 8)
+ 2 Managed Lanes added to Lower Stemmons (pp. 6 and 8)
= 4 Total HOV/Managed Lanes Added by Project Pegasus 24
Pegasus adds 4 Managed Lanes, not 2
-
7/31/2019 Powerpoint for Mayor Rev4
25/26
Where is the documentation for this recent review concluding
managed lanes are not feasible due to limited access to
downtown they provide?
FLAWS IN MATRIX SUMMARY
MANAGED LANES SUDDENLY NOT FEASIBLE?
According to Trinity SDEIS,only 1 out of 5 cars is
traveling TO downtown.
4 out of 5 cars are travelingTHROUGH downtown
80% of cars on the Pegasussystem could use
managed/tolled lanes.
25
-
7/31/2019 Powerpoint for Mayor Rev4
26/26
TRINITY TOLL ROAD vs. PROJECT PEGASUS
CONFLICT BETWEEN DATA AND NARRATIVE
Given the significant discrepancies between
TXDOTs data and the narrative, an outside,independent analysis should be conducted.
26