Transcript of PowerLogistics Asia 2014 - The Heaviest Move in Uzbekistan – Vladimir Nekhvyadovich, Chandler GmbH
Connecting continents
TRANSPORT ROUTES FOR HEAVYWEIGHT EQUIPMENT
Kuryk
Pavlodar
«HEAVY» CENTRAL ASIA ???
long distances poor infrastructure harsh weather conditions Unique laws and regulation parched rivers customs barriers lack of technology
Main delivery routes for OVERSIZED and HEAVY EQUIPMENT
Along North Sea Routes, Obskaya Bay and Irtysh river
Through Black/Azov Sea, Volgo-Don Channel, Caspian Sea
ALONG NORTH SEA ROUTES
Navigation for vessels with ice-class lower than 1А (Аrk 4) open from July till September
ALONG NORTH SEA ROUTES
Transshipment in Obskaya Bay, direct with vessels gears to barges
ALONG NORTH SEA ROUTES
Onshore complex in Salekhard port is able to transship cargo with maximum weight 350 tons from river-sea vessels to barges
SUPERHEAVY CARGO RIVER TRANSPORTATION THROUGH OB AND IRTYSH RIVERS
Barges from 300 tons till 5.000 tons capacity are exploited
INFRASTRUCTURE CONDITIONS
RO-RO JETTY
VOLGO-DON CHANNEL
Atyrau
Aktau Kuryk
Turkmenbashi
Astrakhan
Rostov on Don
Possibility to arrange barge transportation of superheavy cargo from Black Sea, through Volgo-Don Channel to Caspian Sea ports
SUPERHEAVY CARGO ROAD HAULAGE 1116 tons
TRANSSHIPMENT OF SUPERHEAVY REACTORS ON THE ROAD OF PORT KAVKAZ
DISCHARGING OF SUPERHEAVY REACTORS ON RO-RO JETTY
TRANSPORTATION OF SUPERHEAVY REACTORS FROM RO-RO JETTY TO REFINERY
POWER EQUIPMENT DELIVERY TO GAS-TURBINE POWER PLANT IN TASHKENT
Gas turbine: 1.095 х 495 х 498 cm / 288.000 kg Gas turbine generator: 856 х 534 х 425 cm / 224.540 kg POL Charleston/Albany (USA), Linz(Аustria) POT Constanta (Romania) POD Аktau, Kuryk (Kazakhstan) SITE Тashkent (Uzbekistan)
ON ROAD OVER 3.000 km, CROSSED 162 BRIDGES
EQUIPMENT
ROUTE 7.800 SEA MILES + 3.100 KM
ex USA
TRANSHIPMENT OPERATION FROM SEA VESSEL AND BARGE TO RIVER-SEA VESSEL ON THE ROAD OF PORT CONSTANTA
STREAM TURBINE TRANSSHIPMENT IN KURYK PORT
HEAVYWEIGHT CARGO DELIVERY BY MEAN OF ROAD TRANSPORT FROM PORT KURYK TO GAS-TURBINE POWER PLANT IN TASHKENT
Loading: port Kuryk
Transport: vehicle - 22 axles in 3 lines
total weight 400 t.
Discharge: Tashkent GTPP
Decision:
.
CONSTRUCTION WORKS ON SHEPTE-BEYNEU ROUTE SEGMENT
GAS TURBINE TRANSPORTATION IN UZBEKISTAN
GAS TURBINE TRANSPORTATION IN UZBEKISTAN
CERTIFICATES
General contractor certificate for construction operations (construction of - berths, circumurban roads, bridges, etc.) in Russia № СРОСР-С-3281.1 – 28032012.
CONTACTS
We sincerely hope to see you among our clients.
Together we can take on any project that comes our way.
Efficiency, reliability and innovative solutions to your
complex needs await you at Chandler.
Chandler Moscow Tel.: +7 499 683 00 78 Fax: +7 499 683 00 78
Chandler Hamburg Tel.: +49 40 238 01 70 Fax: +49 40 238 01 719
Chandler Seoul Tel.: +82 2 2076 8300 Fax: +82 2 2076 8488