![Page 1: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/1.jpg)
Power System Challenges of Increasing Renewables
100% Converter-Based Grids
Damian Flynn
![Page 2: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/2.jpg)
Facilitation of Renewables Studies
Fundamental issues
Loss of
largest infeed
Issues that can be mitigated
Voltage Stability Transient Stability
Network Loading
Fundamental issues that need further analysis
Non-issues according to modelling
Voltage Control
Fault LevelsSmall Signal
Stability
Temporary loss of
wind power due
to network faults
Frequency Stability
Short term
frequency
variations
Power balance
fluctuations
and frequency
regulation
Frequency Stability
Ireland and Northern Ireland
![Page 3: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/3.jpg)
Facilitation of Renewables StudiesIreland and Northern Ireland
![Page 4: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/4.jpg)
Annual System Inertia
0 -4 10-14 20-24 30-34 40-44
5-9 15-19 25-29 35-39 MWs
20
15
2
01
4
20
13
2
01
2
Ireland and Northern Ireland
![Page 5: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/5.jpg)
Operational Capability Outlook
![Page 6: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/6.jpg)
Power System Transition
![Page 7: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/7.jpg)
Before System Split …
![Page 8: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/8.jpg)
… After System Split
![Page 9: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/9.jpg)
4 November 2006 – Norwegian Pearl
![Page 10: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/10.jpg)
4 November 2006 – System Split
![Page 11: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/11.jpg)
4 November 2006 – Area Frequency Sy
stem
Fre
qu
en
cy (
Hz)
![Page 12: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/12.jpg)
4 November 2006 – System Split
![Page 13: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/13.jpg)
100% Converter-Based Grids
• No conventional synchronous generation
• What is meant by system frequency?
• Achieving load balancing with ‘local’ controls?
• Operational rules in a ‘100%’ state?
• Requirement for (new) system services?
• …
• Achievable without ‘smart grid’ communications?
![Page 14: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/14.jpg)
Load Balancing (Frequency Control)
Synchronous generator
(Fixed speed) wind turbine generator
50/60 Hz
+ Solar PV+ (Variable speed) wind+ HVDC interconnection+ Tidal stream+ Ocean wave + …
![Page 15: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/15.jpg)
Grid-Forming Control Strategy
Existing inverters are grid-following
SG
SG
50 Hz
What to follow?
50 Hz
Some / many future inverters need to be
grid-forming
![Page 16: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/16.jpg)
Modelling Environment?
Existence of implicit synchronous machine based assumptions?
![Page 17: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/17.jpg)
Future Transmission Network
![Page 18: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/18.jpg)
Grid-Forming Converter Model
![Page 19: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/19.jpg)
Modelling Complexity?
Reduced order converter modelsFull order converter models
Co
nve
rter
cu
rren
t (p
u)
Time (s)
![Page 20: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/20.jpg)
Control Hierarchy?
![Page 21: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/21.jpg)
0
100
200
300
400
500
1 7 13 19
Win
d P
ow
er
(MW
)
Time (Hours)
Cork Antrim Donegal
0
100
200
300
400
500
1 7 13 19
Sola
r P
ow
er
(MW
)
Time (Hours)
Valentia Belfast Kilkenny
0 6 12 18 0
0 6 12 18 0
Time Series Modelling
![Page 22: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/22.jpg)
Future Plans …
• Power system stability assessment• New technical challenges?
• Robustness to system splits + Blackstart capability
• …
• Transitions between ‘100%’ state or ‘<100%’ state
• Definition of (new & existing) system services?
• Migration path from current to new ‘controls’?
• Equipment requirements and grid code updates?
• …• Telecommunication infrastructure?
![Page 23: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/23.jpg)
Future Plans …
Hardware in the Loop Simulation
![Page 24: Power System Challenges of Increasing Renewables. Damian Flynn.pdfPower System Challenges of Increasing Renewables 100% Converter-Based Grids Damian Flynn Facilitation of Renewables](https://reader035.fdocuments.us/reader035/viewer/2022071405/60fa47d9ad12cd73a449847b/html5/thumbnails/24.jpg)
Power System Challenges of Increasing Renewables
100% Converter-Based Grids
Damian Flynn